CN203434533U - Special clamp for cable laying in well bore of mine construction vertical shaft - Google Patents

Special clamp for cable laying in well bore of mine construction vertical shaft Download PDF

Info

Publication number
CN203434533U
CN203434533U CN201320501772.4U CN201320501772U CN203434533U CN 203434533 U CN203434533 U CN 203434533U CN 201320501772 U CN201320501772 U CN 201320501772U CN 203434533 U CN203434533 U CN 203434533U
Authority
CN
China
Prior art keywords
rectangular steel
arc
cable laying
welded
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320501772.4U
Other languages
Chinese (zh)
Inventor
赵静波
李红站
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN201320501772.4U priority Critical patent/CN203434533U/en
Application granted granted Critical
Publication of CN203434533U publication Critical patent/CN203434533U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a special clamp for cable laying in a well bore of a mine construction vertical shaft. Two bolt through holes which have a certain distance from each other are drilled in positions of a rectangular steel plate, and another two bolt through holes which have the certain distance from each other are drilled in the same positions of another same rectangular steel plate with the former rectangular steel plate. The same curved plates are welded at the same positions of the two rectangular steel plates. A distance between two corresponding bolt clearing holes is greater than the length of each curved plate. The curvature radius of each curved plate matches with the curvature radius of a cable. Assemblies after welding between the rectangular steel plates and the curved plates are used symmetrically, and the curved plates on the two assemblies are disposed mouth-to-mouth. A steel wire rope clamp is welded on one of the rectangular steel plates, the steel wire rope clamp is welded on a surface opposite to the corresponding curved plate, the cable is clamped by utilizing two bolts, and the steel wire rope clamp is clamped on a steel wire rope. Compared with the prior art, the special clamp can improve a safety factor of the cable laying; a processing preparation time of an early stage of the cable laying and a laying time are shortened; a construction period is shorted; and processing cost is saved because the special clamp can be reused many times.

Description

Mine construction vertical shaft cable laying Special clip
Technical field
The utility model relates to a kind of strain relief clamp, especially a kind of mine construction vertical shaft cable laying Special clip.
Background technology
In recent years along with the exploitation of many large-scale mines, wherein vertical shaft cable laying is as the main medium of the strong, weak electricity transmission such as under-mine power supply, communication and vision signal, and what ensure that mine produces normally provides the most basic support.And there is many difficult points in cabling in shaft of vertical well.Such as: in cable laying process, be easy to scratch damage cable with permanent equipment cable support, even strain relief clamp is hung on cable bearer and causes the cable support that comes off rapidly to damage the phenomenons such as casualties.Therefore, designing the well construction vertical shaft cable laying Special clip that a kind of coefficient of safety is high, is the current technical issues that need to address.
Summary of the invention
Technical problem to be solved in the utility model is to provide the well construction vertical shaft cable laying Special clip that a kind of coefficient of safety is high.
The technical scheme in the invention for solving the technical problem is:
Mine construction vertical shaft cable laying Special clip, it is characterized in that, same position in two identical rectangular steel plates is all drilled with two bolts in a distance and passes through hole, in same position in two rectangular steel plates, be all welded with identical arc, two bolts are greater than the length of arc by the distance between hole, the radius of curvature of arc is mated with cable, the symmetrical use of assembly after rectangular steel plates and arc welding, make two arcs on assembly mouth to mouth, in rectangular steel plates, be welded with rope cramp, rope cramp is welded on the opposite face with arc, use and block cable with two bolts, rope cramp is stuck on steel wire rope.
As a kind of preferred version of the present utility model, the length of described rectangular steel plates is that 160mm, width are that 60mm, thickness are 10mm, bolt is 120mm by the pitch-row in hole, the steel plate thickness of making arc is that 5mm, length are that 91mm, width are 50mm, arc radius of curvature is 43mm, bolt is 18mm by the diameter in hole, and the specification of rope cramp is 32mm, and bolt is M16 bolt.
The making of device:
1. process the rectangular steel plates of 160mm * 60mm * 10mm, and press relevant position boring in figure;
2. process the rectangular steel plates of 91mm * 50mm * 5mm, and be pressed into arc, radian as shown in the figure;
3. process reinforcement.
4. welding combination.
Using method of the present utility model:
The rope cramp that is 32 by nominal dimension is fixed on steel wire rope, has padded rubber with bolt, cable is fixing in arc.
Compared with prior art, after use the utility model, can improve the coefficient of safety of cable laying, shorten the cable laying leading time in earlier stage and lay the time, shorten the construction period, because the utility model is repeatedly reusable, therefore save processing charges.
Accompanying drawing explanation
Fig. 1 is the front view of structural representation of the present utility model;
Fig. 2 is that the A-A of Fig. 1 is to cutaway view.
Embodiment
As shown in the figure, mine construction vertical shaft cable laying Special clip, same position in two identical rectangular steel plates 1 is all drilled with two bolts in a distance and passes through hole, in same position in two rectangular steel plates 1, be all welded with identical arc 2, two bolts are greater than the length of arc 2 by the distance between hole, the radius of curvature of arc 2 is mated with cable, the symmetrical use of assembly after rectangular steel plates 1 is welded with arc 2, make two arcs 2 on assembly mouth to mouth, in rectangular steel plates 1, be welded with rope cramp 4, rope cramp 4 is welded on the opposite face with arc 2, use and block cable with two bolts 3, rope cramp 4 is stuck on steel wire rope.
Between the two ends of arc 2 and rectangular steel plates 1, be provided with reinforcement 5.
The length of described rectangular steel plates 1 is that 160mm, width are that 60mm, thickness are 10mm, bolt is 120mm by the pitch-row in hole, the steel plate thickness of making arc 2 is that 5mm, length are that 91mm, width are 50mm, arc 2 radius of curvature are 43mm, bolt is 18mm by the diameter in hole, the specification of rope cramp 4 is 32mm, and bolt 3 is M16 bolt.
The thickness of described reinforcement 5 is 5mm.

Claims (4)

1. mine construction vertical shaft cable laying Special clip, it is characterized in that, same position in two identical rectangular steel plates (1) is all drilled with two bolts in a distance and passes through hole, in same position in two rectangular steel plates (1), be all welded with identical arc (2), two bolts are greater than the length of arc (2) by the distance between hole, the radius of curvature of arc (2) is mated with cable, the symmetrical use of assembly after rectangular steel plates (1) is welded with arc (2), make two arcs (2) on assembly mouth to mouth, in rectangular steel plates (1), be welded with rope cramp (4), rope cramp (4) is welded on the opposite face with arc (2), use and block cable with two bolts (3), rope cramp (4) is stuck on steel wire rope.
2. mine construction vertical shaft cable laying Special clip according to claim 1, is characterized in that, between the two ends of arc (2) and rectangular steel plates (1), is provided with reinforcement (5).
3. mine construction vertical shaft cable laying Special clip according to claim 1, it is characterized in that, the length of described rectangular steel plates (1) is that 160mm, width are that 60mm, thickness are 10mm, bolt is 120mm by the pitch-row in hole, the steel plate thickness of making arc (2) is that 5mm, length are that 91mm, width are 50mm, and arc (2) radius of curvature is 43mm, and bolt is 18mm by the diameter in hole, the specification of rope cramp (4) is 32mm, and bolt (3) is M16 bolt.
4. mine construction vertical shaft cable laying Special clip according to claim 2, is characterized in that, the thickness of described reinforcement (5) is 5mm.
CN201320501772.4U 2013-08-16 2013-08-16 Special clamp for cable laying in well bore of mine construction vertical shaft Expired - Fee Related CN203434533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320501772.4U CN203434533U (en) 2013-08-16 2013-08-16 Special clamp for cable laying in well bore of mine construction vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320501772.4U CN203434533U (en) 2013-08-16 2013-08-16 Special clamp for cable laying in well bore of mine construction vertical shaft

Publications (1)

Publication Number Publication Date
CN203434533U true CN203434533U (en) 2014-02-12

Family

ID=50063551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320501772.4U Expired - Fee Related CN203434533U (en) 2013-08-16 2013-08-16 Special clamp for cable laying in well bore of mine construction vertical shaft

Country Status (1)

Country Link
CN (1) CN203434533U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167694A (en) * 2014-08-12 2014-11-26 铜陵有色金属集团铜冠矿山建设股份有限公司 Method for laying cable with hemp ropes in vertical shaft of mine
CN105443867A (en) * 2016-01-11 2016-03-30 中建五局工业设备安装有限公司 Vertical shaft traction cable clamp with guiding and avoiding functions
CN105444925A (en) * 2016-01-27 2016-03-30 四川大学 Device and method for installing borehole stressmeter
CN109256726A (en) * 2018-11-22 2019-01-22 陕西陕煤铜川矿业有限公司 A kind of cable laying method of vertical laying pipeline
CN110364966A (en) * 2019-07-25 2019-10-22 铜陵有色金属集团铜冠矿山建设股份有限公司 A kind of method of mine down-hole deep hole cabling
CN112003206A (en) * 2020-06-30 2020-11-27 上海江南长兴造船有限责任公司 Cable laying structure and laying method
CN112563975A (en) * 2020-12-25 2021-03-26 灵宝金源矿业股份有限公司 Clamping device is transferred to shaft cable and wire rope

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167694A (en) * 2014-08-12 2014-11-26 铜陵有色金属集团铜冠矿山建设股份有限公司 Method for laying cable with hemp ropes in vertical shaft of mine
CN105443867A (en) * 2016-01-11 2016-03-30 中建五局工业设备安装有限公司 Vertical shaft traction cable clamp with guiding and avoiding functions
CN105444925A (en) * 2016-01-27 2016-03-30 四川大学 Device and method for installing borehole stressmeter
CN109256726A (en) * 2018-11-22 2019-01-22 陕西陕煤铜川矿业有限公司 A kind of cable laying method of vertical laying pipeline
CN110364966A (en) * 2019-07-25 2019-10-22 铜陵有色金属集团铜冠矿山建设股份有限公司 A kind of method of mine down-hole deep hole cabling
CN112003206A (en) * 2020-06-30 2020-11-27 上海江南长兴造船有限责任公司 Cable laying structure and laying method
CN112563975A (en) * 2020-12-25 2021-03-26 灵宝金源矿业股份有限公司 Clamping device is transferred to shaft cable and wire rope

Similar Documents

Publication Publication Date Title
CN203434533U (en) Special clamp for cable laying in well bore of mine construction vertical shaft
CN204025902U (en) Installation chassis is drawn in heavy caliber PCCP hydraulic pressure
CN205646725U (en) Quadripartion conductor spacer of adjustable distance
CN206111189U (en) Rectangular shield digs jacking force delivery system in top
CN202127104U (en) Ground electrode of ground wire with screw-type lines
CN105048726A (en) Equipment used for removing hydropower station stator bar
CN204663421U (en) Hole sealing tube clamping device
CN203033649U (en) Box type girder hoisting device
CN203451059U (en) Portable device for maintenance hoisting for deepwater well
CN103742717A (en) Parallel protection bracket for submarine pipelines and submarine cables
CN203907008U (en) Dedicated mounting connection device for large-caliber concrete pipeline
CN204252565U (en) One faces frontier defense protection unit
CN202559714U (en) Steel pipe butt-joint locating device
CN203409716U (en) Roller bearing fast dismounting and mounting tool for mine
CN214306440U (en) Special-shaped pipe for engineering machinery
CN204964444U (en) A magnetic particle testing frock for overlength pipe
CN209880844U (en) Device for pulling out grounding rod
CN204136454U (en) Hydraulic pressure processing unit (plant)
CN204235489U (en) To wheel extractor
CN205151555U (en) Flat cable pulley of C shaped steel
CN103072117A (en) Withdrawal tool for press-in pipe joint
CN204609421U (en) Electric power safety protective sleeve
CN204906126U (en) A equipment for power station stator bar demolish
CN203306654U (en) Carrier roller bearing disassembling device of belt conveyor
CN202927323U (en) Rubber expansion joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20140816

EXPY Termination of patent right or utility model