CN203434488U - Special tool for maintenance of oil leakage of oil-immersed transformer bushing - Google Patents

Special tool for maintenance of oil leakage of oil-immersed transformer bushing Download PDF

Info

Publication number
CN203434488U
CN203434488U CN201320462674.4U CN201320462674U CN203434488U CN 203434488 U CN203434488 U CN 203434488U CN 201320462674 U CN201320462674 U CN 201320462674U CN 203434488 U CN203434488 U CN 203434488U
Authority
CN
China
Prior art keywords
oil
clamp
fixture block
bar
special tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320462674.4U
Other languages
Chinese (zh)
Inventor
黄建立
牟庆尤
刘存元
蒯伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHUANGLIU POWER SUPPLY BUREAU CHENGDU ELECTRIC POWER BUREAU
Original Assignee
SHUANGLIU POWER SUPPLY BUREAU CHENGDU ELECTRIC POWER BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUANGLIU POWER SUPPLY BUREAU CHENGDU ELECTRIC POWER BUREAU filed Critical SHUANGLIU POWER SUPPLY BUREAU CHENGDU ELECTRIC POWER BUREAU
Priority to CN201320462674.4U priority Critical patent/CN203434488U/en
Application granted granted Critical
Publication of CN203434488U publication Critical patent/CN203434488U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a special tool for the maintenance of the oil leakage of an oil-immersed transformer bushing, and the tool comprises a sleeve (1), a caliper (2), a clamping block (3), and a clamping rod (4). The caliper (2) comprises a clamping plate (21). The interior of the clamping plate (21) is provided with a cavity (22). The clamping rod (4) passes through the clamping plate (21) to fix the clamping block (3) inside the cavity (22). The tool provided by the utility model is simple in structure, is small in size, is convenient to install and carry, is low in cost, can be reused, is good in effect, can effectively improve the maintenance efficiency of the oil leakage of the oil-immersed transformer bushing, simplify the step of the maintenance of the oil leakage of the oil-immersed transformer bushing, and is high in practicality.

Description

Oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair
Technical field
The utility model relates to a kind of Repair of Transformer instrument, relates in particular a kind of oil immersed type oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair.
Background technology
After oil-filled transformer long-time running, overload or short trouble, there is the defects such as sleeve pipe nut and conducting rod adhesion, conducting rod silk mouth and oil sealing cushion rubber burn out, thereby cause that the breakage of sleeve pipe porcelain vase, loosened screw landing, oil sealing cushion rubber cross cause thermal damage, cause Leakage in Transformer.Under traditional mode, change in the conventional instrument of cushion rubber use, when getting nut, conducting rod can rotate together along with nut, conducting rod cannot be fixed, thereby have to adopt the way of suspended core, employ forklift or crane, repair time is long, manpower and materials consumption is large, and potential safety hazard increase, is unfavorable for carrying out smoothly of site operation.
Utility model content
The utility model has overcome the deficiencies in the prior art, and a kind of oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair is provided, and while having solved bushing shell for transformer oil impregnate maintenance in the past, cost is high, consumption is large and overhaul complicated problem.
For solving above-mentioned technical problem, the utility model is by the following technical solutions: oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair, comprise sleeve, clamp, fixture block and clamping bar, and clamp comprise clamp, in clamp, be provided with cavity, described clamping bar is fixed on fixture block in cavity through clamp.This programme is when application, cavity is passed to conducting rod, in cavity, put into fixture block, and by clamping bar, promote fixture block conducting rod is clamped, can prevent that conducting rod from rotating, after conducting rod clamping, screw tap will be sandwiched in sleeve, thereby can, to conducting rod tapping, recover conducting rod silking, to solve the problem of loosened screw landing; Due to sleeve pipe nut and conducting rod adhesion, conducting rod can prevent that conducting rod is with cap rotation when clamping is become flexible nut afterwards, is convenient for changing oil sealing cushion rubber and damaged sleeve pipe porcelain vase; This programme is simple in structure, and size is little, carries, easy to operate, can effectively improve bushing shell for transformer oil impregnate overhaul efficiency, avoid taking because of sleeve pipe seepage the mode of suspended core processing, reduce the input of human and material resources and financial resources, reduced Field Force's labour intensity, practical.
Further, described fixture block is provided with the shrinkage pool that can stretch into clamping bar.Because fixture block is to promote conducting rod to clamp by clamping bar, so in order to prevent that fixture block from sliding after clamping, shrinkage pool is established in the place contacting with clamping bar at fixture block, and clamping bar front end stretches into shrinkage pool, in the process that clamping bar promotes, can effectively prevent that clamping bar and fixture block from sliding mutually; Shrinkage pool in this programme can be also groove, screwed hole, but considers structure and effect, and shrinkage pool is best, so this programme is selected shrinkage pool structure.
Further, described fixture block is parallel in two vertical planes of clamping bar and is provided with tongue, and described cavity is provided with the groove matching with tongue in the side corresponding with tongue, forms the bascule that fixture block slides along groove in cavity.Because fixture block is when clamping conducting rod, in order to keep fixture block steady, prevent that fixture block from rotating with conducting rod, simultaneously for easy to carry, so the mechanism by fixture block and clamp by sliding tray couples together, fixture block just can only slide and can not rotate in sliding tray like this, has improved clamping intensity.
Further, described sleeve comprises loop bar and the scroll chuck being connected with loop bar one end, scroll chuck is provided with three claws, and described scroll chuck periphery is also provided with the adjustment screw can control card pawl moving radially at scroll chuck, and the clamping face of described claw is provided with screw thread.In order to make sleeve to carry out tapping to the conducting rod screw mandrel of different size; so barrel forward end and screw tap are adopted to scroll chuck clamping; can arbitrarily adjust clamping size; at the clamping face of claw, establish screw thread and not only can increase clamping intensity simultaneously; prevent claw and screw mandrel relative sliding, the screw thread of protection screw mandrel that can also be fabulous.
Further, described loop bar is hollow rod body.Because the screw mandrel length of conducting rod is longer, in order to facilitate tapping, so loop bar is hollow rod body, the part of screw mandrel tapping can be stretched out by loop bar, can not affect tapping, practical.
Further, described loop bar is provided with through hole on the periphery away from scroll chuck one end.During due to tapping, need to use larger power, hold loop bar and can not well exert all one's strength during tapping sometimes, so can insert straight-bar in through hole, by pulling straight-bar, rotate loop bar tapping, the tapping difficulty and the physical demands that reduce a staff, improve tapping efficiency.
Further, described clamp are connected with at clamp lateral surface the bar of shaking hands, and described clamp is provided with through hole in the side relative with the bar of shaking hands, and described clamping bar is fixed fixture block through through hole.Clamp is after clamping conducting rod, thereby the hand-holdable bar of shaking hands of staff keeps clamp to maintain static, and by through hole, can well locate, and prevents that clamping bar from sliding.
Further, the side that described clamp is positioned at cavity bar one side of shaking hands is provided with arc-shaped slot I, and the side that described fixture block is corresponding with arc-shaped slot is provided with arc-shaped slot II, and arc-shaped slot II and arc-shaped slot I are equipped with screw thread.In order to strengthen clamping the screw mandrel tooth line of effect and protection conducting rod, so draw-in groove is set in the place of clamp and fixture block clamping conducting rod, and establish screw thread mate with conducting rod screw mandrel, can well protect the tooth line of conducting rod and clamp effectively, clamp firm.
Further, described through hole is provided with screw thread, and described clamping bar is provided with the screw rod mating with through hole whorl, and screw rod is connected with screw rod and shakes hands.Clamping bar needs afterburning setting fixture block can be located after clamping fixture block, in order to reduce use difficulty, so establish screw thread at through hole, clamping bar is established the screw rod mating with through hole whorl, screw rod connecting screw rod is shaken hands, and like this, staff is when needs clamp fixture block, only need hold the screw rod rotation of shaking hands, by through hole whorl, coordinate fixture block is screwed with screw rod, after screwing, by screw thread, screw rod can be locked simultaneously, without continuing to add external force, simple in structure, easy to operate; Annular knurl can be established for increasing the frictional force of shaking hands with hand, the consumption reducing a staff in screw rod in this programme surface of shaking hands.
Compared with prior art, the beneficial effects of the utility model are:
1, the utility model is simple in structure, and size is little, easy to operate, is easy to carry.
2, the utility model cost is low, can repeatedly use, effective.
3, the utility model effectively improves bushing shell for transformer oil impregnate overhaul efficiency, has simplified bushing shell for transformer oil impregnate maintenance step, practical.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is decomposing schematic representation of the present utility model.
Fig. 3 is the structural representation of the utility model embodiment 1.
Label in figure is respectively: 1, sleeve; 12, through hole; 13, loop bar; 14, scroll chuck; 15, claw; 16, adjust screw; 2, clamp; 21, clamp; 211, groove; 22, cavity; 23, the bar of shaking hands; 24, arc-shaped slot I; 25, through hole; 3, fixture block; 31, arc-shaped slot II; 32, shrinkage pool; 33, tongue; 4, clamping bar; 41, screw rod; 42, screw rod is shaken hands.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.Execution mode of the present utility model includes but not limited to the following example.
Embodiment 1
As shown in Figure 1-Figure 3 comprise sleeve 1, clamp 2, fixture block 3 and clamping bar 4, clamp 2 comprise clamp 21, are provided with cavity 22 in clamp 21, described clamping bar 4 is fixed on fixture block 3 in cavity 22 through clamp 21.
During the present embodiment application, cavity 22 is passed to conducting rod, in cavity 22, put into fixture block 3, and promote fixture block 3 by clamping bar 4, fixture block 3 clamps conducting rod in pushing course, can prevent that conducting rod from rotating, after conducting rod clamping, will in sleeve 1, sandwich screw tap, thus can be to conducting rod tapping, recover conducting rod silking, thereby solve the problem of loosened screw landing; Due to sleeve pipe nut and conducting rod adhesion, conducting rod can prevent that conducting rod is with cap rotation when clamping is become flexible nut afterwards, is convenient for changing oil sealing cushion rubber and damaged sleeve pipe porcelain vase.
The present embodiment is simple in structure, and size is little, carries, easy to operate, can effectively improve bushing shell for transformer oil impregnate overhaul efficiency, avoid taking because of sleeve pipe seepage the mode of suspended core processing, reduce the input of human and material resources and financial resources, reduced Field Force's labour intensity, practical.
As preferably, described fixture block 3 is provided with the shrinkage pool 32 that can stretch into clamping bar 4.Because fixture block 3 is to promote conducting rod to clamp by clamping bar 4, so in order to prevent that fixture block 3 from sliding after clamping, shrinkage pool 32 is established in the place contacting with clamping bar 4 at fixture block 3, and clamping bar 4 front ends stretch into shrinkage pool 32, in the process that clamping bar 4 promotes, can effectively prevent that clamping bar 4 and fixture block 3 from sliding mutually; Shrinkage pool in the present embodiment can be also groove, screwed hole, but considers structure and effect, and shrinkage pool is best, so this programme is selected shrinkage pool structure.
As preferably, described fixture block 3 is parallel in two vertical planes of clamping bar 5 and is provided with tongue 33, described cavity 22 is provided with the groove 211 matching with tongue 33 in the side corresponding with tongue 33, forms fixture block 3 at the interior bascule sliding along groove 211 of cavity 22.Fixture block 3, when clamping conducting rod, in order to keep fixture block 3 steadily to clamp, prevents that fixture block 3 from rotating with conducting rod, simultaneously for easy to carry, structure by fixture block 3 and clamp 21 by sliding tray couples together, and fixture block 3 just can only slide and can not rotate in sliding tray like this, has improved clamping intensity.
Embodiment 2
As shown in Figure 1-Figure 3, the present embodiment is substantially the same manner as Example 1, difference is: described sleeve 1 comprises loop bar 13 and the scroll chuck 14 being connected with loop bar 13 one end, scroll chuck 14 is provided with three claws 15, described scroll chuck 14 peripheries are also provided with the adjustment screw 16 can control card pawl 15 moving radially at scroll chuck 14, and the clamping face of described claw 15 is provided with screw thread.
Scroll chuck 14 structures in the present embodiment are identical with the scroll chuck structure on lathe; can adjust the size that screw 16 is controlled clamping by adjustment; and clamping face is established the tooth line that screw thread can well be protected conducting rod screw mandrel; improve clamping intensity time also protected screw mandrel, practical.
As preferably, described loop bar 13 is hollow rod body.The screw mandrel length of conducting rod is longer, and in order to facilitate tapping, so loop bar 13 is hollow rod body, the part of screw mandrel tapping can be stretched out by loop bar 13, can not affect tapping, practical.
As preferably, described loop bar 13 is provided with through hole 12 on the periphery away from scroll chuck one end.During due to tapping, need to use larger power, during tapping sometimes, holding loop bar 13 can not well exert all one's strength, so can insert straight-bar in through hole, by pulling straight-bar, rotates loop bar 13 tapping, reduce staff's tapping difficulty and physical demands, improved tapping efficiency.
Embodiment 3
Embodiment 3 is optimum embodiment of the present utility model.
As shown in Figure 1-Figure 3, the present embodiment has been optimized clamp on the basis of above-mentioned any embodiment, be specially: described clamp 2 are connected with at clamp 21 lateral surfaces the bar 23 of shaking hands, described clamp 21 is being provided with through hole 25 with the relative side of bar 23 of shaking hands, and described clamping bar 4 is fixing by fixture block 3 through through hole 25.
In the present embodiment, clamp 21 is after clamping conducting rod, thereby the hand-holdable bar 23 of shaking hands of staff keeps clamp 21 to maintain static, and by 25 of through holes, can, well by clamping bar 4 location, prevent that clamping bar 4 from sliding, and strengthened clamping effect.
As preferably, the side that described clamp 21 is positioned at cavity 22 bar 23 1 sides of shaking hands is provided with arc-shaped slot I 24, and the side that described fixture block 3 is corresponding with arc-shaped slot 24 is provided with arc-shaped slot II 31, and arc-shaped slot II 31 is equipped with screw thread with arc-shaped slot I 24.In order to strengthen the screw mandrel tooth line to the clamping effect of conducting rod and protection conducting rod; so the place at clamp 21 and fixture block 3 clamping conducting rods arranges draw-in groove; and establish the screw thread mating with conducting rod screw mandrel, and can well protect the tooth line of conducting rod and clamp effectively, clamp firmly.
As preferably, described through hole 25 is provided with screw thread, and described clamping bar 4 is provided with the screw rod 41 mating with through hole 25 screw threads, and screw rod 41 is connected with screw rod and shakes hands 42.Clamping bar 4 needs afterburning setting fixture block 3 can be located after clamping fixture block 3, in order to reduce use difficulty, so through hole 25 is established screw thread, clamping bar 4 is established the screw rod 41 mating with through hole 25 screw threads, screw rod 41 connecting screw rods shake hands 42, and like this, staff is when needs clamp fixture block 3, only need hold screw rod 42 rotations of shaking hands, by through hole 25 screw threads, coordinate fixture block 3 is screwed with screw rod 41, can be by screw rod 41 lockings, without continuing to add external force by screw thread after screwing simultaneously, simple in structure, easy to operate.
The above is embodiment of the present utility model.The utility model is not limited to above-mentioned execution mode, and anyone should learn the structural change of making under enlightenment of the present utility model, every with the utlity model has identical or close technical scheme, within all falling into protection range of the present utility model.

Claims (9)

1. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair, it is characterized in that: comprise sleeve (1), clamp (2), fixture block (3) and clamping bar (4), clamp (2) comprise clamp (21), in clamp (21), be provided with cavity (22), described clamping bar (4) is fixed on fixture block (3) in cavity (22) through clamp (21).
2. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 1, is characterized in that: described fixture block (3) is provided with the shrinkage pool (32) that can stretch into clamping bar (4).
3. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 1, it is characterized in that: described fixture block (3) is parallel in two vertical planes of clamping bar (4) and is provided with tongue (33), described cavity (22) is provided with the groove (211) matching with tongue (33) in the side corresponding with tongue (33), forms the bascule that fixture block (3) slides along groove (211) in cavity (22).
4. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 1, it is characterized in that: described sleeve (1) comprises loop bar (13) and the scroll chuck (14) being connected with loop bar (13) one end, scroll chuck (14) is provided with three claws (15), described scroll chuck (14) periphery is also provided with the adjustment screw (16) can control card pawl (15) moving radially at scroll chuck (14), and the clamping face of described claw (15) is provided with screw thread.
5. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 4, is characterized in that: described loop bar (13) is hollow rod body.
6. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 4, is characterized in that: described loop bar (13) is provided with through hole (12) on the periphery away from scroll chuck one end.
7. according to the oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair described in claim 1-6 any one, it is characterized in that: described clamp (2) are connected with the bar of shaking hands (23) at clamp (21) lateral surface, described clamp (21) is provided with through hole (25) in the side relative with the bar of shaking hands (23), and described clamping bar (4) is fixing by fixture block (3) through through hole (25).
8. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 7, it is characterized in that: the side that described clamp (21) is positioned at cavity (22) bar (23) one sides of shaking hands is provided with arc-shaped slot I (24), the side that described fixture block (3) is corresponding with arc-shaped slot (24) is provided with arc-shaped slot II (31), and arc-shaped slot II (31) is equipped with screw thread with arc-shaped slot I (24).
9. oil-filled transformer sleeve pipe oil impregnate special tool for examination and repair according to claim 7, it is characterized in that: described through hole (25) is provided with screw thread, described clamping bar (4) is provided with the screw rod (41) mating with through hole (25) screw thread, and screw rod (41) is connected with screw rod shake hands (42).
CN201320462674.4U 2013-07-31 2013-07-31 Special tool for maintenance of oil leakage of oil-immersed transformer bushing Expired - Fee Related CN203434488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320462674.4U CN203434488U (en) 2013-07-31 2013-07-31 Special tool for maintenance of oil leakage of oil-immersed transformer bushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320462674.4U CN203434488U (en) 2013-07-31 2013-07-31 Special tool for maintenance of oil leakage of oil-immersed transformer bushing

Publications (1)

Publication Number Publication Date
CN203434488U true CN203434488U (en) 2014-02-12

Family

ID=50063506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320462674.4U Expired - Fee Related CN203434488U (en) 2013-07-31 2013-07-31 Special tool for maintenance of oil leakage of oil-immersed transformer bushing

Country Status (1)

Country Link
CN (1) CN203434488U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401164A (en) * 2013-07-31 2013-11-20 成都电业局双流供电局 Oil leakage overhauling tool for transformer bushing
CN106207827A (en) * 2016-08-11 2016-12-07 国网山东省电力公司威海供电公司 A kind of box operating handle of switching on/off handcart

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401164A (en) * 2013-07-31 2013-11-20 成都电业局双流供电局 Oil leakage overhauling tool for transformer bushing
CN106207827A (en) * 2016-08-11 2016-12-07 国网山东省电力公司威海供电公司 A kind of box operating handle of switching on/off handcart

Similar Documents

Publication Publication Date Title
CN203434488U (en) Special tool for maintenance of oil leakage of oil-immersed transformer bushing
CN204171908U (en) A kind of cylinder clamping mechanism
CN103401164A (en) Oil leakage overhauling tool for transformer bushing
CN204094505U (en) A kind of pipe fixture
CN203536854U (en) A universal clamp for replacing a single insulator of a power transmission line
CN203610435U (en) Stretcher and fixing structure for sliding block of stretcher
CN207645632U (en) A kind of fixing device suitable for tower production
CN211765748U (en) Transfer device is used in mutual-inductor production
CN209434734U (en) A kind of cable keeper of power construction
CN202847249U (en) Magnetic compass
CN204585097U (en) A kind of Double head double offset ring spanner auxiliary frame
CN204020328U (en) A kind of multi-core type compasses
AU2016100634A4 (en) A crow bar device with simple structure and pivot
CN204241740U (en) A kind of optic fiber configureing case protective device for the protection of optical fiber cable
CN204065469U (en) Optical fiber cylindrical connector
CN205057879U (en) Spanner
CN203385972U (en) Mobile phone lens amplifier
CN204464860U (en) Power transmission sequence lead wire and earth wire net anchoring fixture
CN207061516U (en) A kind of Novel wire pedestal for cable disk support
CN203654180U (en) Excessive-clamping-preventive clamping mechanism of cable robot
CN203401465U (en) Clamping structure used for fixing screw on ceiling
CN203301069U (en) Simple cable drum support
CN203522019U (en) Device for connecting large-knife clamping tool and insulator cradle in electric transmission line
CN203003414U (en) Wheeled robot wheel limiting stopper
CN202496155U (en) Porous threading sealing device for Hubble connector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20180731

CF01 Termination of patent right due to non-payment of annual fee