CN203431495U - System for natural gas storage and regulation through hydration - Google Patents

System for natural gas storage and regulation through hydration Download PDF

Info

Publication number
CN203431495U
CN203431495U CN201320407700.3U CN201320407700U CN203431495U CN 203431495 U CN203431495 U CN 203431495U CN 201320407700 U CN201320407700 U CN 201320407700U CN 203431495 U CN203431495 U CN 203431495U
Authority
CN
China
Prior art keywords
gas
natural gas
synthesize
resolver
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320407700.3U
Other languages
Chinese (zh)
Inventor
项友谦
王启
李颜强
高文学
马鸿敬
赖建波
高建文
赵自军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
North China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Municipal Engineering Design and Research Institute Co Ltd filed Critical North China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201320407700.3U priority Critical patent/CN203431495U/en
Application granted granted Critical
Publication of CN203431495U publication Critical patent/CN203431495U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A system for natural gas storage and regulation through hydration comprises a liquefied petroleum gas storage tank, a natural gas compressor, a natural gas hydrate synthesis and decomposition device, a recycle gas compressor, a water and additive pump, a refrigerant and heating medium pump and a refrigerant and heating medium generator. According to the system, natural gas hydrate is generated by adding a little propane and butane to natural gas under the conditions of temperature reduction and pressure increase and then stored, compared with conventional gas hydrate synthesis, synthesis through the system has the advantages that the pressure is lower and the temperature is higher, and therefore the system is the natural gas storage technology which is small in energy consumption, safe to operate and small in investment.

Description

Hydrate natural gas storing and peak regulation system
Technical field:
The utility model belongs to and adopts hydrate to carry out the technical field of natural gas storing peak regulation, particularly a kind ofly utilizes rock gas to add a small amount of propane, butane generates gas hydrates and stores and peak regulation system.
Background technique:
Rock gas is the main source of the gas of China's city gas, and the storage of rock gas is the important step of city gas supply system.The storing mode of current rock gas has the modes such as normal pressure gas holder, high pressure tank, underground natural gas storage tank, liquefaction accumulator plant.The equipment of normal pressure gas storage is huge, and the pressure of high-pressure gas is high, and the Geological Condition Requirement of underground gas storage is high, and the temperature requirement that liquefaction stores is too low.
Summary of the invention:
The utility model object is to provide a kind of hydrate natural gas storing and peak regulation system, this system utilization is added and is generated gas hydrates after a small amount of propane or butane and store and peak regulation in rock gas, native system is compared with conventional gas hydrate system, the balance pressure that hydrate generates is low, the compression power consumption of building-up process is low, and the bearing requirements of equipment can reduce.
As above design, the technical solution of the utility model is: a kind of hydrate natural gas storing and peak regulation system, is characterized in that: comprise liquefied petroleum gas storage tank, natural gas compressor, gas hydrates composition and decomposition device, circulating air compressor, water and additive pump, cold heat medium pump and cold and hot matchmaker's generator, source of the gas rock gas enters liquefied petroleum gas storage tank by pipeline, the air outlet of liquefied petroleum gas storage tank is connected with the suction port of natural gas compressor, the air outlet of natural gas compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the liquid outlet of synthesize-resolver of gas hydrates bottom is communicated with the basin of water and additive, the basin of water and additive is communicated with the liquid entering hole at synthesize-resolver top of gas hydrates by water pump, synthesize-the air outlet at resolver top of gas hydrates is with the import of circulating air compressor or supply natural gas line to be communicated with outward, the outlet of circulating air compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the outlet of the heat exchanger coiled pipe in synthesize-resolver of gas hydrates is communicated with the import of cold and hot enzyme generator, and the outlet of cold and hot enzyme generator is communicated with the import of heat exchanger coiled pipe by cold and hot enzyme pump, cold and hot enzyme generator is connected for natural gas line with outer.
The air outlet at synthesize-resolver top of above-mentioned gas hydrates is connected for natural gas line with outer by safety valve or valve.
The utlity model has following advantage and effect:
(1) this system is compared with conventional gas hydrate system, and the balance pressure that hydrate generates is low, and the compression power consumption of building-up process is low, and the bearing requirements of equipment can reduce.
(2) this system is compared with conventional gas hydrate system, and the temperature of equilibrium that hydrate generates is high, and the cold that building-up process needs is few.
(3) this system is added after the decomposition of hydrate of the third butane formation, sneaks into natural gas system, little on the makings impact of rock gas.
Accompanying drawing explanation:
Fig. 1 is system diagram of the present utility model.
In figure: 1-liquefied petroleum gas storage tank; 2-gas compressor; 3-gas hydrates composition and decomposition device; 4-safety valve; 5-circulating air compressor; 6-heat exchanger coiled pipe; 7-water and additive storage tank; 8-water and additive pump; 9-cold heat medium pump; 10-cold and hot matchmaker's generator; A-n is valve.
Embodiment:
Natural gas storing and a peak regulation system, be comprised of liquefied petroleum gas storage tank, natural gas compressor, gas hydrates composition and decomposition device, circulating air compressor, water and additive pump, cold heat medium pump and cold and hot matchmaker's generator.Source of the gas rock gas enters liquefied petroleum gas storage tank by pipeline, the air outlet of liquefied petroleum gas storage tank is connected with the suction port of natural gas compressor, the air outlet of natural gas compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the liquid outlet of synthesize-resolver of gas hydrates bottom is communicated with the basin of water and additive, the basin of water and additive is communicated with the liquid entering hole at synthesize-resolver top of gas hydrates by water pump, synthesize-the air outlet at resolver top of gas hydrates is with the import of circulating air compressor or supply natural gas line to be communicated with outward, the outlet of circulating air compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the outlet of the heat exchanger coiled pipe in synthesize-resolver of gas hydrates is communicated with the import of cold and hot enzyme generator, and the outlet of cold and hot enzyme generator is communicated with the import of heat exchanger coiled pipe by cold and hot enzyme pump, cold and hot enzyme generator is connected for natural gas line with outer.
Working procedure of the present utility model is:
Source of the gas rock gas is generally directly to enter the outer for gas distributing system of city gas through valve a, c.The embodiment that employing this patent carries out natural gas peak-shaving is as follows:
(1) when source of the gas rock gas is rich, valve b opens, and valve g closes, and implements the building-up process of gas hydrates.Natural gas via valve b and liquefied petroleum gas storage tank 1 gasification converge by a small amount of liquefied petroleum gas (LPG) of valve d, through gas compressor 2, are pressurized to after certain pressure, by valve e, f, enter in synthesize-resolver 3 of gas hydrates.Propane in rock gas or butane are 2%~5%, under the condition of 2~3MPa pressure and 0~10 ℃ of temperature, carry out the synthetic of gas hydrates.In the building-up process of gas hydrates, the refrigerant of hydrate building-up process liberated heat in heat exchanger coiled pipe 6 taken away, refrigerant after intensification is entered in cold and hot matchmaker's generator 10 through valve l by heat exchanger coiled pipe 6, and the refrigerant after cooling is sent back to by cold heat medium pump 9 through valve m in the heat exchanger coiled pipe 6 of synthesize-resolver 3 of gas hydrates.Water and the additive of synthesize-resolver 3 bottoms of gas hydrates flow in water and additive tank 7 through valve i, through valve j, after water and additive pump 8 pressurizations, through valve k, from the top of synthesize-resolver 3 of gas hydrates, spray into.Gas hydrates are synthetic-the part natural gas via valve h at resolver 3 tops extracts out after circulating air compressor 5 pressurizations, together with rock gas the third butane mixture through valve f with enter gas hydrates synthetic-bottom of resolver 3.
(2) when source of the gas rock gas is not enough, valve b closes, and valve g opens, and implements the decomposition process of hydrate.Gas hydrates in synthesize-resolver 3 of gas hydrates decompose under the condition of 0.2~1MPa pressure and 20~40 ℃ of temperature, and the natural gas via valve g of generation adds to outer in natural gas line.The heating agent of the heat of gas hydrate dissociation process need in heat exchanger coiled pipe 6 provides, heating agent after cooling is entered in cold and hot matchmaker's generator 10 through valve l by heat exchanger coiled pipe 6, and the heating agent after intensification is sent back to by cold heat medium pump 9 through valve m in the heat exchanger coiled pipe 6 of synthesize-resolver 3 of gas hydrates.
(3) primary energy of refrigerant generator 10 is provided by the outer rock gas flowing to through valve n for natural gas line.The running of cold and hot matchmaker's generator is definite according to the supply situation of source of the gas rock gas, and gas hydrates provide refrigerant when synthetic, and heating agent is provided during gas hydrate dissociation.
(4) when the pressure of synthesize-resolver running of gas hydrates surpasses specified value, safety valve 4 is opened automatically, diffuses outer in natural gas line.
The utility model utilizes rock gas to add a small amount of propane, butane generates the system that gas hydrates store under cooling, the condition of boosting, and the pressure more synthetic than conventional gas hydrate is low, temperature is high.Therefore, the utility model be that a kind of energy consumption is little, security of operation, the lower natural gas storing technology of investment.

Claims (2)

1. hydrate natural gas storing and a peak regulation system, is characterized in that: comprise liquefied petroleum gas storage tank, natural gas compressor, gas hydrates composition and decomposition device, circulating air compressor, water and additive pump, cold heat medium pump and cold and hot matchmaker's generator, source of the gas rock gas enters liquefied petroleum gas storage tank by pipeline, the air outlet of liquefied petroleum gas storage tank is connected with the suction port of natural gas compressor, the air outlet of natural gas compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the liquid outlet of synthesize-resolver of gas hydrates bottom is communicated with the basin of water and additive, the basin of water and additive is communicated with the liquid entering hole at synthesize-resolver top of gas hydrates by water pump, synthesize-the air outlet at resolver top of gas hydrates is with the import of circulating air compressor or supply natural gas line to be communicated with outward, the outlet of circulating air compressor communicates with the suction port of synthesize-resolver of gas hydrates bottom, the outlet of the heat exchanger coiled pipe in synthesize-resolver of gas hydrates is communicated with the import of cold and hot enzyme generator, and the outlet of cold and hot enzyme generator is communicated with the import of heat exchanger coiled pipe by cold and hot enzyme pump, cold and hot enzyme generator is connected for natural gas line with outer.
2. hydrate natural gas storing according to claim 1 and peak regulation system, is characterized in that: the air outlet at synthesize-resolver top of above-mentioned gas hydrates is connected for natural gas line with outer by safety valve or valve.
CN201320407700.3U 2013-07-10 2013-07-10 System for natural gas storage and regulation through hydration Expired - Fee Related CN203431495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320407700.3U CN203431495U (en) 2013-07-10 2013-07-10 System for natural gas storage and regulation through hydration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320407700.3U CN203431495U (en) 2013-07-10 2013-07-10 System for natural gas storage and regulation through hydration

Publications (1)

Publication Number Publication Date
CN203431495U true CN203431495U (en) 2014-02-12

Family

ID=50060532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320407700.3U Expired - Fee Related CN203431495U (en) 2013-07-10 2013-07-10 System for natural gas storage and regulation through hydration

Country Status (1)

Country Link
CN (1) CN203431495U (en)

Similar Documents

Publication Publication Date Title
CN104265512B (en) High-pressure/low-pressure gas supply system of ship power plant
RU2435050C2 (en) Energy storage plant
CN204062478U (en) A kind of BOG liquefaction plant again
CN204285888U (en) A kind of LNG satellite station cold energy utilization device
CN104791602A (en) LNG (liquefied natural gas) fuel supply method and device utilizing BOG (boil-off gas) preferentially
CN103953848A (en) Self-balancing re-liquefying system and work method thereof
CN204327162U (en) The fixed mining liquid carbon dioxide gasification fire extinguishing equipment in ground
CN202250272U (en) Liquefied natural gas (LNG) cold energy four-stage recycling system
CN103486438A (en) LNG gasification system based on double-heat-source heat pump
CN104154416A (en) Ice storage method and device comprising an atmospheric tower and utilizing cold energy of LNG
CN203411518U (en) Natural gas hydrate synthetizing and decomposing integrated device
CN103267394A (en) Method and device for efficiently utilizing cold energy of liquefied natural gas
CN204060975U (en) A kind of high voltage/low voltage fuel gas supply system of Ship Power Equipment
CN102817655A (en) Comprehensive energy source management system for peak shifting power supplying and method thereof
CN203585806U (en) LNG (liquefied natural gas) gasification system based on double-heat-source heat pump
CN201569239U (en) Cold storage operation device using cold energy of liquefied natural gas to refrigerate
CN203420754U (en) Energy storage system of compressed gas with carbon dioxide as working medium
CN107304974B (en) Liquefied natural gas cold energy recovery system and method
CN103411132A (en) Process and system for natural gas storage and peak shaving by means of hydrate method
CN203431495U (en) System for natural gas storage and regulation through hydration
CN203810038U (en) Self-balancing re-liquefying system
CN204592854U (en) The LNG gaseous fuel air feeder that BOG preferentially utilizes
CN205118654U (en) System for BOG who retrieves production of LNG storage tank is as hydrogen manufacturing fuel gas
CN203893579U (en) Complete equipment for comprehensively utilizing pressure energy of natural gas
CN203547813U (en) Power generation device using liquefied natural gas cold energy and solar energy as power sources

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300074 Hexi District Meteorological Observatory Road, Tianjin, No. 99

Patentee after: NORTH CHINA MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 300074 Hexi District Meteorological Observatory Road, Tianjin, No. 99

Patentee before: North China Municipal Engineering Design & Research Institute

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140212

CU01 Correction of utility model
CU01 Correction of utility model

Correction item: Termination upon expiration of patent

Correct: Revocation of Patent Expiration and Termination

False: On July 28, 2023, the expiration and termination of the 39-volume 3002 patent

Number: 30-02

Volume: 39

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212