CN203430453U - Clear water pressurizer and bored pile foundation secondary hole-cleaning device - Google Patents

Clear water pressurizer and bored pile foundation secondary hole-cleaning device Download PDF

Info

Publication number
CN203430453U
CN203430453U CN201320503302.1U CN201320503302U CN203430453U CN 203430453 U CN203430453 U CN 203430453U CN 201320503302 U CN201320503302 U CN 201320503302U CN 203430453 U CN203430453 U CN 203430453U
Authority
CN
China
Prior art keywords
clear water
pile foundation
cleaning device
pipe body
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320503302.1U
Other languages
Chinese (zh)
Inventor
陈海锋
齐广飞
辛国平
孙旭东
罗庚
罗俊荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN201320503302.1U priority Critical patent/CN203430453U/en
Application granted granted Critical
Publication of CN203430453U publication Critical patent/CN203430453U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a clear water pressurizer. The clear water pressurizer comprises a pipe body with the top end sealed and the lower end open, two upwards extending hoses are inserted in the top wall of the pipe body, the diameters of the two hoses are both smaller than the radius of the pipe body, the lower end of each hose is communicated with the pipe body, the length of the parts, extending into the pipe body, of the two hoses is L, and L> 5mm. The utility model further discloses a bored pile foundation secondary hole-cleaning device. The bored pile foundation secondary hole-cleaning device comprises the clear water pressurizer, the clear water pressurizer comprises the pipe body with the top end sealed, two holes are formed in the top wall of the pipe body, each hole is provided with one upwards extending hose, one hose is connected with a high-pressure air compressor, the other hose is connected with a clear water supplying pipeline, and the bottom end of the pipe body is connected with a guide pipe of a pile foundation. The clear water pressurizer is simple in structure and low in cost. The bored pile foundation secondary hole-cleaning device can guarantee the quality of pile forming, and is easy to operate, high in speed and high in efficiency.

Description

Clear water pressurizer and drilled pile pile foundation secondary pile hole cleaning device
Technical field
The utility model relates to bored pile mud replacement technique, is specifically related to a kind of clear water pressurizer and drilled pile pile foundation secondary pile hole cleaning device.
Background technology
After drilled pile pile foundation puts in place under reinforcing cage, if poured pile base concrete immediately not, dregs in stake hole in mud can precipitate again, cause pile bottom sediment thickness to exceed standard, for guaranteeing carrying out smoothly of filling concrete, must carry out secondary pile hole cleaning, clear hole is the mud of substituting in foramen primum, cascalho in cleaning hole, the relative density, sand factor etc. that reduce to pour into front slurries make its index up to specification.While adopting the conventional slurry method of changing of tradition to carry out clearly hole, because clear water proportion is little compared with mud, the mixing velocity of clear water and mud is slow, causes that hole efficiency is low clearly, consuming time longer.
Utility model content
It is a kind of simple in structure that the purpose of this utility model is to provide, the clear water pressurizer that cost is low.
Another object of the present utility model be to provide a kind of efficiency high, can guarantee that clear hole quality meets the drilled pile pile foundation secondary pile hole cleaning device of actual needs.
For reaching above-mentioned purpose, the clear water pressurizer that the utility model provides, comprise a top closure, the unlimited body (3a) in lower end, and on the roof of body (3a), be inserted with two upwardly extending flexible pipes (3b), the diameter of two flexible pipes (3b) is all less than the radius of body (3a), the lower end of flexible pipe (3b) communicates with body (3a), and the length that two flexible pipes (3b) stretch in body (3a) is L, L > 5mm.
Another technical problem to be solved in the utility model is to provide a kind of drilled pile pile foundation secondary pile hole cleaning device, comprise clear water pressurizer (3), described clear water pressurizer (3) comprises a top closure, the unlimited body (3a) in lower end, and on the roof of body (3a), be inserted with two upwardly extending flexible pipes (3b), the diameter of two flexible pipes (3b) is all less than the radius of body (3a), the lower end of flexible pipe (3b) communicates with body (3a), the length that two flexible pipes (3b) stretch in body (3a) is L, L > 5m; One of them flexible pipe (3b) is connected with High Pressure Air Compressor (4), and another flexible pipe (3b) is connected with clear water supply line (5), and the bottom of described body (3a) is connected with the conduit (2) of pile foundation.
Distance at the bottom of the Ju Zhuankong hole, lower end of described conduit is 5~15cm.
The diameter of described body and the internal diameter of conduit are suitable.
The beneficial effects of the utility model are: because the utility model utilizes in clear water pressurizer conductive pipe, inject clear water and compressed air, make the clear water liquid level pressure in conduit be greater than the mud liquid level pressure outside conduit, at the bottom of clear water in conduit will arrive at fast, the disturbance velocity of pile bottom sediment is accelerated, clear water and sediment rapid mixing also form mud, along with the continuous injection of clear water, mud just can dilute and discharge stake hole gradually, until the concentration of mud reaches required standard.So the utility model guarantees the quality of pile, and simple to operate, speed is fast, efficiency is high, simple in structure, cost is low.
Accompanying drawing explanation
Fig. 1 be drilled pile pile foundation secondary pile hole cleaning device described in the utility model structural representation;
Fig. 2 is clear water pressurizer structural representation described in the utility model.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Clear water pressurizer as shown in Figure 2, comprise a top closure, the unlimited body 3a in lower end, and on the roof of body 3a, be inserted with two upwardly extending flexible pipe 3b, the diameter of two flexible pipe 3b is all less than the radius of body 3a, the lower end of flexible pipe 3b communicates with body 3a, the length that two flexible pipe 3b stretch in body 3a is L, L > 5mm.Length L to flexible pipe 3b limits, and can not come off guaranteeing between flexible pipe 3b root and body 3a.
Drilled pile pile foundation secondary pile hole cleaning device as depicted in figs. 1 and 2, one top closure, the unlimited body 3a in lower end, and on the roof of body 3a, be inserted with two upwardly extending flexible pipe 3b, the diameter of two flexible pipe 3b is all less than the radius of body 3a, the lower end of flexible pipe 3b communicates with body 3a, the length that two flexible pipe 3b stretch in body 3a is L, L > 5mm.One of them flexible pipe 3b is connected with High Pressure Air Compressor 4, and another flexible pipe 3b is connected with clear water supply line 5, and the bottom of described body 3a is connected with the conduit of pile foundation 2.Distance at the bottom of 1 hole, Ju Zhuan hole, lower end of described conduit 2 is 5~15cm, preferably 10cm.
As shown in Figure 1, utilize above-mentioned drilled pile pile foundation secondary pile hole cleaning device to carry out the method in hole clearly, its step is as follows:
Step 1, conduit 2 is dropped to 5~15cm, preferably 10cm at the bottom of 1 hole, a hole;
Step 2, clear water pressurizer 3 is arranged on to the upper end of conduit 2;
Step 3, a flexible pipe 3b on clear water pressurizer 3 is connected with High Pressure Air Compressor 4, another flexible pipe 3b on clear water pressurizer 3 is connected with clear water supply line 5;
Step 4, open the valve of clear water supply line 5, and start High Pressure Air Compressor 4, by the clear water pressurizer interior injection clear water of 3 conductive pipe 2 and compressed air, at the bottom of making clear water can arrive at fast 1 hole, a hole, and be mixed to form a mud outflow stake hole 1 with sediment, enter sedimentation basin;
Step 5, the concentration of hydraulic mixture in a hole 1 reach after set quota, close valve and the High Pressure Air Compressor 4 of clear water supply line 5.
The utility model utilizes the clear water pressurizer interior injection clear water of 3 conductive pipe 2 and compressed air, make the clear water liquid level pressure in conduit 2 be greater than the mud liquid level pressure outside conduit 2, at the bottom of clear water in conduit 2 will arrive at fast, the disturbance velocity of pile bottom sediment is accelerated, clear water and sediment rapid mixing also form mud, along with the continuous injection of clear water, mud just can dilute and discharge stake hole gradually.

Claims (4)

1. a clear water pressurizer, it is characterized in that: comprise a top closure, the unlimited body (3a) in lower end, and on the roof of body (3a), be inserted with two upwardly extending flexible pipes (3b), the diameter of two flexible pipes (3b) is all less than the radius of body (3a), the lower end of flexible pipe (3b) communicates with body (3a), the length that two flexible pipes (3b) stretch in body (3a) is L, L > 5mm.
2. a drilled pile pile foundation secondary pile hole cleaning device, it is characterized in that: comprise clear water pressurizer (3), described clear water pressurizer (3) comprises a top closure, the unlimited body (3a) in lower end, and on the roof of body (3a), be inserted with two upwardly extending flexible pipes (3b), the diameter of two flexible pipes (3b) is all less than the radius of body (3a), the lower end of flexible pipe (3b) communicates with body (3a), the length that two flexible pipes (3b) stretch in body (3a) is L, L > 5m; One of them flexible pipe (3b) is connected with High Pressure Air Compressor (4), and another flexible pipe (3b) is connected with clear water supply line (5), and the bottom of described body (3a) is connected with the conduit (2) of pile foundation.
3. drilled pile pile foundation secondary pile hole cleaning device according to claim 2, is characterized in that: the distance at the bottom of the hole, Ju Zhuan hole, lower end (1) of described conduit (2) is 5~15cm.
4. according to the drilled pile pile foundation secondary pile hole cleaning device described in claim 2 or 3, it is characterized in that: the internal diameter of described body (3a) equals the internal diameter of conduit (2).
CN201320503302.1U 2013-08-16 2013-08-16 Clear water pressurizer and bored pile foundation secondary hole-cleaning device Expired - Lifetime CN203430453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320503302.1U CN203430453U (en) 2013-08-16 2013-08-16 Clear water pressurizer and bored pile foundation secondary hole-cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320503302.1U CN203430453U (en) 2013-08-16 2013-08-16 Clear water pressurizer and bored pile foundation secondary hole-cleaning device

Publications (1)

Publication Number Publication Date
CN203430453U true CN203430453U (en) 2014-02-12

Family

ID=50059498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320503302.1U Expired - Lifetime CN203430453U (en) 2013-08-16 2013-08-16 Clear water pressurizer and bored pile foundation secondary hole-cleaning device

Country Status (1)

Country Link
CN (1) CN203430453U (en)

Similar Documents

Publication Publication Date Title
CN103233693B (en) Drilled pile pile foundation secondary pile hole cleaning device and clear hole method
CN102808413B (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN103470212B (en) Active drilling and hole sealing device and method
CN102928327A (en) Circulating water pressure regulating device for seepage deformation test
CN103257219A (en) Novel pouring device for model test and application method
CN104196474A (en) Pre-pouring air lift hole cleaning device of drilled grouting pile and hole cleaning method of pre-pouring air lift hole cleaning device
CN105649559A (en) Device and method for removing hole bottom sediment of pore-forming pouring pile
CN207260441U (en) A kind of grout sleeve of mortar leakage prevention
CN203430453U (en) Clear water pressurizer and bored pile foundation secondary hole-cleaning device
CN205116234U (en) Bottom plate pressure relief device
CN204282382U (en) A kind of equipment by decompression drainage quick blocking precipitation pipe well
CN201459734U (en) Dry bored pile tamper
CN203716155U (en) Pneumatic anchor rod grouter
CN204817371U (en) Pipeline geomantic omen linkage washing unit flows automatically
CN203640321U (en) Building wall body filling repair device
CN204401660U (en) A kind of castinplace pile bores core bore infiltration plugging device
CN104131710A (en) Wall body filling restorer for building
CN203283540U (en) Liquid storage container
CN207701096U (en) Pile foundation construction secondary pile hole cleaning sand filter under a kind of bridge water
CN202672197U (en) Device for testing grouting pressure at pile side of threaded grouting pile
CN209975532U (en) Novel pile foundation construction slip casting pipe
CN203977439U (en) Prevent the filling system that Urban Underground water level declines
CN202248244U (en) Integrated sewage delivery device
CN205224047U (en) Large diameter pile bottom ring shape slip casting ware
CN213703963U (en) Bridge intelligence vacuum mud jacking equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140212

CX01 Expiry of patent term