CN203419699U - Rod piece connector for boom of tower crane - Google Patents

Rod piece connector for boom of tower crane Download PDF

Info

Publication number
CN203419699U
CN203419699U CN201320444024.7U CN201320444024U CN203419699U CN 203419699 U CN203419699 U CN 203419699U CN 201320444024 U CN201320444024 U CN 201320444024U CN 203419699 U CN203419699 U CN 203419699U
Authority
CN
China
Prior art keywords
rod piece
tower crane
piece connector
connector
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320444024.7U
Other languages
Chinese (zh)
Inventor
廖多常
李俊
陈森林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Construction Machinery Group Co Ltd
Original Assignee
Sichuan Construction Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Construction Machinery Group Co Ltd filed Critical Sichuan Construction Machinery Group Co Ltd
Priority to CN201320444024.7U priority Critical patent/CN203419699U/en
Application granted granted Critical
Publication of CN203419699U publication Critical patent/CN203419699U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a rod piece connector for a boom of a tower crane. The rod piece connector, which is relatively low in cost, comprises a connector body; a connecting pin shaft hole and a jacklift traveling surface are arranged on the connector body; the connector body is a casting part; the jacklift traveling surface is a machining surface with machining allowance, and other outer surfaces of a jacklift are casting modeling surfaces; the connecting pin shaft hole is a machining hole; the connector body is a fork head or a fork holder. The rod piece connector has the benefits that the manufacturing cost of the rod piece connector is reduced greatly, the production efficiency is improved, and the rod piece connector is mainly applicable to booms of tower cranes.

Description

Tower Crane Boom ' rod member joint
Technical field
The utility model relates to a kind of Tower Crane Boom ', especially a kind of rod member joint being used on jib rod member.
Background technology
At present, domestic Tower Crane Boom ' rod member coupling hook used, forked standard are forging, machine up after forging molding and obtaining, its machining amount is large, waste of raw materials is large, and the process-cycle is long, and production efficiency is low, productive costs is high, does not meet the development tendency of resource-conserving and environment-friendly society.
Utility model content
In order to overcome the higher deficiency of existing forging joint cost, technical problem to be solved in the utility model is to provide the Tower Crane Boom ' rod member joint that a kind of cost is lower.
The utility model solves the technical scheme that its technical matters adopts: Tower Crane Boom ' rod member joint, comprise joint body, on joint body, be provided with connecting pin axis hole and crane carriage walking surface, described joint body is Casting Parts, described crane carriage walking surface is the machinework face that is designed with stock left for machining, and all the other outside faces are for being cast as profile; Described connecting pin axis hole is machined holes.
Described joint body is jaw.
Described joint body is forked standard.
The beneficial effects of the utility model are: greatly saved the cost of manufacture of rod member joint, improved production efficiency, be mainly used in Tower Crane Boom '.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of existing forging jaw.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the schematic diagram of existing forging forked standard.
Fig. 4 is the birds-eye view of Fig. 3.
Fig. 5 is the schematic diagram of the utility model Tower Crane Boom ' rod member joint (jaw).
Fig. 6 is the birds-eye view of Fig. 5.
Fig. 7 is the schematic diagram of the utility model Tower Crane Boom ' rod member joint (forked standard).
Fig. 8 is the birds-eye view of Fig. 7.
In figure, be labeled as, 1-connecting pin axis hole, 2-crane carriage walking surface, 10-jaw, 11-forked standard, 20-forges jaw, and 21-forges forked standard.
In each figure, fill area represents stock allowance.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, existing for Tower Crane Boom ' jaw, forked standard all adopt Forging Parts, its stock left for machining is large, waste material is serious, thereby cost is higher.
As Fig. 5, Fig. 6, Fig. 7, shown in Fig. 8, Tower Crane Boom ' jaw of the present utility model, forked standard all adopts Casting Parts, except crane carriage walking surface 2 is for to be designed with the machinework face of stock left for machining, all the other outside faces are and are cast as profile, described connecting pin axis hole 1 is machined holes, can guarantee that working accuracy meets matching requirements, and the carriage walking rail level integral body forming after assembling is comparatively smooth-going, without significantly step and fluctuating, guarantee that crane carriage operates steadily, due to without other special requirement, existing precision casting technology meets the processing request on bulk strength and described remainder surface completely, thereby direct casting, in the time of must not making joint as employing Forging Parts again, carry out machinework, part materials amount and overhours have greatly been saved, in addition, during assembling, according to crane carriage walking surface 2, can identify more quickly the assembly direction of part, saved time of setting up, therefore cost is lower.

Claims (3)

1. Tower Crane Boom ' rod member joint, comprise joint body, on joint body, be provided with connecting pin axis hole (1) and crane carriage walking surface (2), it is characterized in that: described joint body is Casting Parts, described crane carriage walking surface (2) is for being designed with the machinework face of stock left for machining, and all the other outside faces are for being cast as profile; Described connecting pin axis hole (1) is machined holes.
2. Tower Crane Boom ' rod member joint as claimed in claim 1, is characterized in that: described joint body is jaw (10).
3. Tower Crane Boom ' rod member joint as claimed in claim 1, is characterized in that: described joint body is forked standard (11).
CN201320444024.7U 2013-07-24 2013-07-24 Rod piece connector for boom of tower crane Expired - Lifetime CN203419699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320444024.7U CN203419699U (en) 2013-07-24 2013-07-24 Rod piece connector for boom of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320444024.7U CN203419699U (en) 2013-07-24 2013-07-24 Rod piece connector for boom of tower crane

Publications (1)

Publication Number Publication Date
CN203419699U true CN203419699U (en) 2014-02-05

Family

ID=50018799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320444024.7U Expired - Lifetime CN203419699U (en) 2013-07-24 2013-07-24 Rod piece connector for boom of tower crane

Country Status (1)

Country Link
CN (1) CN203419699U (en)

Similar Documents

Publication Publication Date Title
CN203419699U (en) Rod piece connector for boom of tower crane
CN203541410U (en) Mold for forging spherical or ellipsoidal head
CN204413225U (en) A kind of to line drill jig
CN203067517U (en) Improved structure of transmission swing arm for printing machine
CN204497025U (en) The core of reactor that a kind of noise is low
CN206747493U (en) A kind of solidifying forging wheel die side mould of liquid strengthens new Joining Structure
CN203214619U (en) Bearing roller
CN201517552U (en) Connecting rod of engine
CN204721804U (en) A kind of rotary tiller shaft welded type tool magazine
CN202883770U (en) Improved coupler
CN202570995U (en) Welded screw forming mould
CN204419766U (en) Sliding connection block
CN202900818U (en) Improved 4WMM16-5X hand-operated direction valve
CN208218276U (en) Derrick crane connects pin shaft
CN202623294U (en) Fixture for hydraulic pressure tray welding machine
CN202302178U (en) Valve body blank formed by stamp forging
CN202785286U (en) Lifting hook for steel plate
CN210797605U (en) Open caisson mould inner die capable of quickly demoulding
CN201711486U (en) Novel hot forging screw mould
CN207961505U (en) A kind of mining piston rod
CN202609795U (en) Hoist cylinder connecting bolt
CN202326587U (en) Guiding locating pin for metal processing machinery
CN206513743U (en) A kind of combination elevator brake sleeve
CN205183711U (en) Die lifter is assisted in multi -functional optimization of static pressure mo(u)lding line
CN205217984U (en) Make things convenient for ejection mechanism of automatic installation of mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140205

CX01 Expiry of patent term