CN203418260U - Tool for mounting upper liquid level meter on heat exchanger barrel body - Google Patents

Tool for mounting upper liquid level meter on heat exchanger barrel body Download PDF

Info

Publication number
CN203418260U
CN203418260U CN201320454349.3U CN201320454349U CN203418260U CN 203418260 U CN203418260 U CN 203418260U CN 201320454349 U CN201320454349 U CN 201320454349U CN 203418260 U CN203418260 U CN 203418260U
Authority
CN
China
Prior art keywords
liquid level
level gauge
level meter
heat exchanger
upper connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320454349.3U
Other languages
Chinese (zh)
Inventor
朱海卫
崔丽霞
赵俊永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhanghuaji Suzhou Heavy Equipment Co ltd
Original Assignee
Zhangjiagang Chemical Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Chemical Machinery Co Ltd filed Critical Zhangjiagang Chemical Machinery Co Ltd
Priority to CN201320454349.3U priority Critical patent/CN203418260U/en
Application granted granted Critical
Publication of CN203418260U publication Critical patent/CN203418260U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tool for mounting an upper liquid level meter on a heat exchange barrel body. The tool comprises an upper connecting pipe with an upper connecting pipe flange, and a lower connecting pipe with a lower connecting pipe flange. The relative position of the upper connecting pipe and the lower connecting pipe is adaptive to the positions of mounting holes of the upper liquid level meter and a lower liquid level meter, a liquid level meter formwork is fixedly connected between the upper connecting pipe flange and the lower connecting pipe flange, and the liquid level meter formwork is the same as the liquid level meter needing to be mounted in shape. The tool has the advantages that the tool enables the liquid level meter to be conveniently mounted, and the liquid level meter can be effectively prevented from being affected by welding deformation, assembly errors and the like.

Description

Liquid level gauge mounting tool on heat exchanger cylindrical shell
Technical field
The utility model relates to liquid level gauge mounting tool on heat exchanger cylindrical shell.
Background technology
On heat exchanger cylindrical shell, be provided with installing hole and lower installing hole, on upper installing hole, be welded with the upper connecting tube with upper connecting tube flange, on lower installing hole, be welded with the lower linking tube with lower linking tube flange, between upper connecting tube flange and lower linking tube flange, liquid level gauge is installed.While making heat exchanger cylindrical shell, in the corresponding position of heat exchanger cylindrical shell, offer respectively for welding upper installing hole and the lower installing hole of upper connecting tube and lower linking tube, then respectively upper connecting tube and lower linking tube are welded on upper installing hole and lower installing hole, after being transported to place to use Deng heat exchanger cylindrical shell, again liquid level gauge is arranged between upper connecting tube flange and lower linking tube flange, but due to welding deformation, external force impact in assembly error and transportation, upper connecting tube and lower linking tube can deform, thereby cause the depth of parallelism of upper connecting tube flange and lower linking tube flange and relative position to guarantee, thereby causing heat exchanger cylindrical shell to be transported to makes after land used, liquid level gauge cannot be arranged between two pipe connecting flanges.
Utility model content
The purpose of this utility model is: provide a kind of and can facilitate liquid level gauge mounting tool on the heat exchanger cylindrical shell that liquid level gauge installs.
For achieving the above object, the technical solution adopted in the utility model is: liquid level gauge mounting tool on heat exchanger cylindrical shell, comprise: with the upper connecting tube of upper connecting tube flange with the lower linking tube of lower linking tube flange, upper liquid level gauge installing hole on described upper connecting tube and the relative position between lower linking tube and heat exchanger cylindrical shell and the position of lower liquid level gauge installing hole adapt, between upper connecting tube flange and lower linking tube flange, be fixedly connected with liquid level gauge template, described liquid level gauge template is identical with the shape of liquid level gauge.
Further, liquid level gauge mounting tool on aforesaid heat exchanger cylindrical shell wherein, is provided with transitional connection pipe between lower linking tube flange and liquid level gauge template.
The utility model has the advantages that: greatly facilitate the installation of liquid level gauge, make the installation of liquid level gauge can effectively avoid being subject to the impact that adapter is welded and assembly error brings.
Accompanying drawing explanation
Fig. 1 is the structural representation of liquid level gauge mounting tool on heat exchanger cylindrical shell described in the utility model.
The specific embodiment
Below in conjunction with accompanying drawing and preferred embodiment, the utility model is described in further detail.
As shown in Figure 1, liquid level gauge mounting tool on heat exchanger cylindrical shell, comprise: with the upper connecting tube 2 of upper connecting tube flange 21 with the lower linking tube 3 of lower linking tube flange 31, described upper connecting tube 2 and the upper liquid level gauge installing hole on the relative position between lower linking tube 3 and heat exchanger cylindrical shell 1 and the position of lower liquid level gauge installing hole adapt, between upper connecting tube flange 21 and lower linking tube flange 31, be fixedly connected with liquid level gauge template 4, described liquid level gauge template 4 is identical with the shape of the liquid level gauge of required installation.In the present embodiment, in order to shorten the length of lower linking tube 3, between the lower linking tube flange 31 of lower linking tube 3 and liquid level gauge template 4, be connected transition connecting pipe 5.
Operation principle: while making heat exchanger cylindrical shell 1, liquid level gauge template 5 is arranged between upper connecting tube flange 21 and lower linking tube flange 31, and then upper connecting tube 2 and lower linking tube 3 are welded on respectively on the upper liquid level gauge installing hole and lower liquid level gauge installing hole on heat exchanger cylindrical shell 1.After heat exchanger cylindrical shell moves to point-of-use, by liquid level gauge form removable, install and need the liquid level gauge installed.
Adopt above-mentioned mounting tool, liquid level gauge is installed very convenient, and effectively avoided the adverse effect brought because of welding deformation and assembly error etc.

Claims (2)

1. liquid level gauge mounting tool on heat exchanger cylindrical shell, comprise: with the upper connecting tube of upper connecting tube flange with the lower linking tube of lower linking tube flange, it is characterized in that: the upper liquid level gauge installing hole on described upper connecting tube and the relative position between lower linking tube and heat exchanger cylindrical shell and the position of lower liquid level gauge installing hole adapt, between upper connecting tube flange and lower linking tube flange, be fixedly connected with liquid level gauge template, described liquid level gauge template is identical with the shape of the liquid level gauge of required installation.
2. liquid level gauge mounting tool on heat exchanger cylindrical shell according to claim 1, is characterized in that: between lower linking tube flange and liquid level gauge template, be provided with transitional connection pipe.
CN201320454349.3U 2013-07-29 2013-07-29 Tool for mounting upper liquid level meter on heat exchanger barrel body Expired - Fee Related CN203418260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320454349.3U CN203418260U (en) 2013-07-29 2013-07-29 Tool for mounting upper liquid level meter on heat exchanger barrel body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320454349.3U CN203418260U (en) 2013-07-29 2013-07-29 Tool for mounting upper liquid level meter on heat exchanger barrel body

Publications (1)

Publication Number Publication Date
CN203418260U true CN203418260U (en) 2014-02-05

Family

ID=50017364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320454349.3U Expired - Fee Related CN203418260U (en) 2013-07-29 2013-07-29 Tool for mounting upper liquid level meter on heat exchanger barrel body

Country Status (1)

Country Link
CN (1) CN203418260U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106002031A (en) * 2016-05-27 2016-10-12 哈电集团(秦皇岛)重型装备有限公司 Liquid level meter connecting pipe installing, welding and locating device and use method thereof
CN108788588A (en) * 2017-04-26 2018-11-13 兰州兰石重型装备股份有限公司 The tooling and its application method of adjustable anti-liquid level gauge nozzle distortion
CN110052756A (en) * 2018-01-19 2019-07-26 兰州兰石重型装备股份有限公司 Multiple pipe connecting flange assembling positioning tools and application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106002031A (en) * 2016-05-27 2016-10-12 哈电集团(秦皇岛)重型装备有限公司 Liquid level meter connecting pipe installing, welding and locating device and use method thereof
CN106002031B (en) * 2016-05-27 2017-10-24 哈电集团(秦皇岛)重型装备有限公司 A kind of level instrumentation nozzle group weldering positioner and its application method
CN108788588A (en) * 2017-04-26 2018-11-13 兰州兰石重型装备股份有限公司 The tooling and its application method of adjustable anti-liquid level gauge nozzle distortion
CN110052756A (en) * 2018-01-19 2019-07-26 兰州兰石重型装备股份有限公司 Multiple pipe connecting flange assembling positioning tools and application method

Similar Documents

Publication Publication Date Title
CN203418260U (en) Tool for mounting upper liquid level meter on heat exchanger barrel body
CN202240294U (en) Chemical equipment liquid level meter pipe nozzle flange pairing tool
CN203500765U (en) Four-way plugging pipe connector
CN203334433U (en) Concrete vertical face embedded part mounting fixing device
CN202924075U (en) Detachable Chinese character 'mi'-shaped support device
CN102141466A (en) Boundary simulation device and method for thin-walled cylindrical shell structure experiment
CN203109516U (en) Weld auxiliary tool for oil inlet and oil outlet of transformer oil tank
CN204595100U (en) The mounting structure of the conductivity meter in waste incineration Water Treatment
CN203003412U (en) Corrector for assembling equipment barrel of pressure vessel
CN203473123U (en) Connection structure of steering stand column and lower yoke plate
CN202580467U (en) Pipe breakage rapid repair auxiliary device
CN201386386Y (en) Integral template device used for chimney construction
CN202655848U (en) Mould for assembling pipe and sleeve
CN203719264U (en) Connecting structure for automobile condenser and liquid storing tank
CN203641207U (en) Expanded connection component
CN203239537U (en) Aligning and centering gauge holder for air compressor
CN204366399U (en) Heat exchanger tube returns dress alignment device
CN204007843U (en) Large-scale weighing machine scale body table top overlap joint location structure
CN203962607U (en) A kind of connection structure for furniture
CN204171590U (en) A kind of for regulating the positioning tool of ammonia tower end socket assembling position
CN203266463U (en) Spud leg tube positioning device
CN202895068U (en) Auxiliary structure for installing worm wheel sample pieces
CN103353251B (en) Fixed connection structure during pressure testing between tube sheet and shell-side cylinder
CN203100453U (en) Mobile multi-tube furnace cooling water tank
CN203190829U (en) Assembling type condenser

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SUZHOU TIANWO TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: ZHANGJIAGANG CHEMICAL MACHINERY CO., LTD.

CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu province 215633 gold town Zhangjiagang city after Cheng Cheng Yang Lu

Patentee after: SUZHOU THVOW TECHNOLOGY LLC

Address before: Suzhou City, Jiangsu province 215633 gold town Zhangjiagang city after Cheng Cheng Yang Road Zhangjiagang chemical machinery Limited by Share Ltd

Patentee before: ZHANGJIAGANG CHAMICAL MACHINERY Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20170830

Address after: 215632, Linjiang Road, Changshan village, Nansha Town, Zhangjiagang, Jiangsu, Suzhou 1, China

Patentee after: ZHANGHUAJI (SUZHOU) HEAVY EQUIPMENT Co.,Ltd.

Address before: Suzhou City, Jiangsu province 215633 gold town Zhangjiagang city after Cheng Cheng Yang Lu

Patentee before: SUZHOU THVOW TECHNOLOGY LLC

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140205

Termination date: 20210729

CF01 Termination of patent right due to non-payment of annual fee