CN203392962U CN201320486666.3U CN201320486666U CN203392962U CN 203392962 U CN203392962 U CN 203392962U CN 201320486666 U CN201320486666 U CN 201320486666U CN 203392962 U CN203392962 U CN 203392962U
Authority
CN
China
Prior art keywords
settling
flue gas
settling tank
drag
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320486666.3U
Other languages
Chinese (zh)
Inventor
姚兴玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320486666.3U priority Critical patent/CN203392962U/en
Application granted granted Critical
Publication of CN203392962U publication Critical patent/CN203392962U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model provides an ash-fishing facility with double settling ponds of a fire coal flue gas desulphurization system. The facility comprises two settling ponds which are adjacently arranged, wherein one of the settling ponds is used while the other end is for later use. An acid-base mixing pond located in the upriver of each settling pond is built on one side of each settling pond, and each acid-base mixing pond is communicated with an acidic water slagging conveying pipeline and an alkaline water conveying pipeline. Each settling pond is internally provided with a submersible wall which is lower than the wall of the settling pond relative to one side of the acid-base mixing pond. A water return channel is formed on one side of each submersible wall, separated from the acid-base mixing pond. The two water return channels are communicated with a water collecting well 1. As the facility provided by the utility model is provided with two settling ponds, one of the settling ponds is used while the other end is for later use, and the two settling ponds alternately work. The facility not only solves the problem that plaster which is too thin is hard to fish out, but also further avoids halt of combustion equipment, thereby guaranteeing continuous production.

Description

The two settling tanks of coal-fired flue gas desulfurization system drag for grey facility
Technical field
The utility model relates to a kind of settling tank structure, the settling tank structure that particularly coal-fired flue gas desulfurization system is used.
Background technology
Current coal-fired flue gas desulfurization system, general design technology is for to make the modes such as the materials such as the sulfurous gas in flue gas wash with water its disengaging and to collect in settling tank, in settling tank, drop into again the alkaline matters such as unslaked lime, by after the water liquid acid-base neutralisation in settling tank, reactant precipitation, clear water is back in sprinkling system and recycles again.
Yet, settling tank is after being used for some time, the materials such as sulfurous gas react the plaster producing and can build up in settling tank bottom more and more higher with liming chemistry, if plaster can not be cleared up (dragging for ash) in time, settling tank is by ineffective, and whole desulphurization system also cannot normally be moved.
At present, a settling tank is all set, when in settling tank, throw out runs up to a certain degree, employing is dragged for ash grab bucket and directly from settling tank, plaster is pulled out.Yet, the described plaster thing that not hardens, in dragging for grey process can with the clear water generation mixed flow on settling tank upper strata, make whole settling tank a slice muddy, not only actual to drag for grey efficiency extremely low, and force the combustion equipment must break-off.
Summary of the invention
In order to overcome above-mentioned technical problem, the utility model provides the two settling tanks of a kind of coal-fired flue gas desulfurization system to drag for grey facility, and object is to improve drags for grey efficiency, and combustion equipment can move continuously.
For achieving the above object, the technical solution adopted in the utility model is:
The two settling tanks of system drag for a grey facility, it is characterized in that: comprise two settling tanks of the using and the reserved of adjacent setting, wherein:
Described in each, one side of settling tank has a soda acid mixing pit that is positioned at described settling tank upstream, and described in each, soda acid mixing pit is communicated with sour water deslagging transport pipe and alkaline water transport pipe;
Described in each, with respect to one side of described soda acid mixing pit, be provided with one height lower than the unrestrained waterwall of settling tank body of wall in settling tank, each stifled described unrestrained waterwall forms a backwater road away from a side of described soda acid mixing pit, and two described backwater roads are all communicated to pump well No. one.
In technical scheme preferably:
Described two settling tanks rely on a partition wall to separate setting, described soda acid mixing pit is all arranged on described settling tank away from one side of described partition wall, described unrestrained waterwall is all arranged on described settling tank near one side of described partition wall, the height of described unrestrained waterwall, lower than the height of described partition wall, forms a described backwater road between each stifled described unrestrained waterwall and described partition wall.
Every backwater Dao one end has Yi Geguo water hole, and two described water holes of crossing are all connected with the upstream of a water leg, and the downstream of described water leg is communicated to a described pump well.
The bottom of described soda acid mixing pit and the top of described settling tank join.
At each soda acid mixing pit, near a side of its corresponding settling tank, be provided with a stifled height lower than the waterwall of crossing of soda acid mixing pit body of wall.
In the described bottom of crossing waterwall, have antifreeze water hole.
Above described two settling tanks, be also provided with for dragging for grey transfer gantry grab bucket.
One side of a described settling tank has a potass pool therein.
At No. two pump wells of track arranged outside of described transfer gantry grab bucket, described No. two pump wells are connected by communicating pipe with a described pump well.
Compared with prior art; adopt the advantage the utlity model has of technique scheme to be: owing to the utlity model has two settling tanks; these two settling tank the using and the reserved; alternation; drag for ash thoroughly; not only improved and dragged for grey efficiency, also avoided the shutdown of combustion equipment, guaranteed to produce and carry out continuously.
Accompanying drawing explanation
Fig. 1 is the floor map that the two settling tanks of the coal-fired flue gas desulfurization system that provides of the utility model drag for grey facility;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the plane simplified schematic diagram of another embodiment of the utility model.
Description of reference numerals: settling tank 10; Partition wall 11; Unrestrained waterwall 12; Backwater road 13; Cross water hole 14; Water leg 15; A pump well 16; No. two pump wells 17; Water outlet 171; Communicating pipe 18; Soda acid mixing pit 20; Cross waterwall 21; Antifreeze water hole 22; Transfer gantry grab bucket 30; Potass pool 31; Track 32.
Embodiment
As shown in Figure 1 and Figure 2, the utility model provides the two settling tanks of a kind of coal-fired flue gas desulfurization system to drag for grey facility, is to comprise relying on a partition wall 11 to separate two settling tanks 10 of the using and the reserved that arrange, wherein:
Described in each, settling tank 10 has a soda acid mixing pit 20 away from one side of described partition wall 11, described soda acid mixing pit 20 is positioned at the upstream position of its corresponding settling tank 10, and be communicated with sour water deslagging transport pipe and alkaline water transport pipe (will not illustrate), the acidic aqueous liquid that coal-fired flue gas desulfurization system produces enters described soda acid mixing pit 20 by described sour water deslagging transport pipe, fully mix rear generation neutralization reaction with the alkaline water entering by alkaline water transport pipe, then flow in described settling tank 10; Wherein, the bottom of described soda acid mixing pit 20 and described settling tank 10 top join, and make the water liquid in soda acid mixing pit 20 can flow into smoothly in settling tank 10; In addition, for acid-base neutralisation is reacted completely, at each soda acid mixing pit 20, near a side of its corresponding settling tank 10, be provided with a stifled height and cross waterwall 21 lower than soda acid mixing pit 20 bodies of wall, acidic aqueous liquid first fully mixes in the inner side of crossing waterwall 21 with caustic lime breast, then mixed mixing water liquid just can cross described waterwall 21 top excessively, and flow in settling tank 10; In order to prevent that winter, water liquid was frozen in soda acid mixing pit 20, in the described bottom of crossing waterwall 21, have antifreeze water hole 22, when described soda acid mixing pit 20 is stopped using, the described mixing water liquid of crossing waterwall 21 inner sides can be discharged in time, can avoid freezing;
Described in each, in settling tank 10, near described partition wall 11 position, be also provided with one height lower than the unrestrained waterwall 12 of settling tank 10 bodies of wall and partition wall 11, flow into the mixing water liquid in described settling tank 10, can slowly flow to unrestrained waterwall 12 1 sides, the time of acid-base neutralisation reaction is extended greatly, and make the plaster in mixing water liquid slowly be precipitated to bottom, and the clear water of mixing water liquid after having neutralized is positioned at upper strata, described clear water is more and more higher and finally cross described unrestrained waterwall 12;
Between each stifled described unrestrained waterwall 12 and described partition wall 11, form a backwater road 13, every backwater Dao13 one end has Yi Geguo water hole 14, two described water holes 14 of crossing are all connected with a water leg 15 upstream, and described water leg 15 downstream is communicated to pump well 16 No. one;
Above described two settling tanks 10, be also provided with for dragging for grey transfer gantry grab bucket 30, the track 32 of transfer gantry is laid on described two settling tank 10 both sides, and described grab bucket can be moved around between described two settling tanks 10; Described transfer gantry grab bucket 30, after dragging for ash and finishing, if clean not in time, will be corroded by acidic substance, for this reason, one side of a described settling tank 10 has a potass pool 31 therein, and grab bucket is finished using, insert in the buck in potass pool 31, can neutralize acidic substance, avoid corrosion;
Because the track 32 of transfer gantry grab bucket 30 is positioned at the outside of a described pump well 16, its ground affects an outside draining of pump well 16, for this reason, No. two pump wells 17 of track 32 arranged outside in described transfer gantry grab bucket 30, described No. two pump wells 17 are connected by communicating pipe 18 with a described pump well 16, No. two pump well 17 upper end hole-openings form the mouth of a river 171, make water pass through this hole and flow into the recycle system, for described coal-fired flue gas desulfurization systemic circulation, use.
Use the utility model, can guarantee to drag for grey effect, and needn't suspend combustion equipment, its use procedure is as follows:
As shown in Figure 1, suppose that the settling tank 10 that is arranged in Tu Zhong right side accumulated abundant plaster, the soda acid mixing pit 20 on Ze Tuzhong right side is stopped using, make the settling tank 10 that is arranged in figure left side in use state simultaneously, acidic aqueous liquid is with after alkaline milk of lime mixes in corresponding soda acid mixing pit 20, as shown in the direction of arrow in figure, flow through backwater road 13, water leg 15, pump well 16 and No. two pump wells 17, the water outlet 171 by No. two pump well 17 upper ends flow into the recirculation of coal-fired flue gas desulfurization system and uses;
Meanwhile, described transfer gantry grab bucket 30 starts to enable, first a water pump is hung to the clear water degree of depth in right side settling tank 10, the clear water of surface location in right side settling tank 10 is drawn in the settling tank 10 of left side, by the time, after clear water extracts substantially, can start described transfer gantry grab bucket 30 and drag for ash; Certainly, if the inadequate thickness still of the plaster in right side settling tank 10 now, can also harden with the plaster that truck is thrown in settling tank 10 in the lime-ash ,Shi right side settling tank 10 of dry combustion equipment sintering to the right, can make the grey efficiency of dragging for of transfer gantry grab bucket 30 further improve.
Owing to the utlity model has two settling tanks 10, these two settling tank 10 the using and the reserved, alternation, drags for ash thoroughly, has not only improved and has dragged for grey efficiency, also avoids combustion equipment to shut down, and makes to produce and carries out continuously.
Shown in Fig. 3, the utility model also can provide another kind of embodiment, that two settling tanks 10 are set up in parallel, described in each, one side of settling tank 10 has a soda acid mixing pit 20 that is positioned at described settling tank 10 upstreams, and described in each, soda acid mixing pit 20 is communicated with sour water deslagging transport pipe and alkaline water transport pipe;
Described in each, in settling tank 10, with respect to one side of described soda acid mixing pit 20, be provided with one height lower than the unrestrained waterwall 12 of settling tank 10 bodies of wall, each stifled described unrestrained waterwall 12 forms a backwater road 13 away from a side of described soda acid mixing pit 20, article two, described backwater road 13, every backwater Dao13 one end has Yi Geguo water hole 14, two described water holes 14 of crossing are all connected with a water leg 15 upstream, and described water leg 15 downstream is communicated to pump well 16 No. one;
The same transfer gantry that is provided with above described two settling tanks 10 grabs bucket 30, one side of a described settling tank 10 has a potass pool 31 therein, at No. two pump wells 17 of track 32 arranged outside of described transfer gantry, described No. two pump wells 17 are connected by communicating pipe 18 with a described pump well 16.
Adopt this kind of structure, can realize goal of the invention of the present utility model equally.
More than illustrate the utility model just illustrative; and nonrestrictive, those of ordinary skills understand, in the situation that do not depart from the spirit and scope that claim limits; can make many modifications, variation or equivalence, but within all falling into protection domain of the present utility model.

Claims (9)

1. the two settling tanks of coal-fired flue gas desulfurization system drag for a grey facility, it is characterized in that: comprise two settling tanks of the using and the reserved of adjacent setting, wherein:
Described in each, one side of settling tank has a soda acid mixing pit that is positioned at described settling tank upstream, and described in each, soda acid mixing pit is communicated with sour water deslagging transport pipe and alkaline water transport pipe;
Described in each, with respect to one side of described soda acid mixing pit, be provided with one height lower than the unrestrained waterwall of settling tank body of wall in settling tank, each stifled described unrestrained waterwall forms a backwater road away from a side of described soda acid mixing pit, and two described backwater roads are all communicated to pump well No. one.
2. the two settling tanks of coal-fired flue gas desulfurization system according to claim 1 drag for grey facility, it is characterized in that: described two settling tanks rely on a partition wall to separate setting, described soda acid mixing pit is all arranged on described settling tank away from one side of described partition wall, described unrestrained waterwall is all arranged on described settling tank near one side of described partition wall, the height of described unrestrained waterwall, lower than the height of described partition wall, forms a described backwater road between each stifled described unrestrained waterwall and described partition wall.
3. the two settling tanks of coal-fired flue gas desulfurization system according to claim 2 drag for grey facility, it is characterized in that: every backwater Dao one end has Yi Geguo water hole, two described water holes of crossing are all connected with the upstream of a water leg, and the downstream of described water leg is communicated to a described pump well.
4. the two settling tanks of coal-fired flue gas desulfurization system according to claim 1 and 2 drag for grey facility, it is characterized in that: the bottom of described soda acid mixing pit and the top of described settling tank join.
5. the two settling tanks of coal-fired flue gas desulfurization system according to claim 1 and 2 drag for grey facility, it is characterized in that: at each soda acid mixing pit, near a side of its corresponding settling tank, be provided with a stifled height lower than the waterwall of crossing of soda acid mixing pit body of wall.
6. the two settling tanks of coal-fired flue gas desulfurization system according to claim 5 drag for grey facility, it is characterized in that: in the described bottom of crossing waterwall, have antifreeze water hole.
7. the two settling tanks of coal-fired flue gas desulfurization system according to claim 1 and 2 drag for grey facility, it is characterized in that: above described two settling tanks, be also provided with for dragging for grey transfer gantry grab bucket.
8. the two settling tanks of coal-fired flue gas desulfurization system according to claim 7 drag for grey facility, it is characterized in that: one side of a described settling tank has a potass pool therein.
9. the two settling tanks of coal-fired flue gas desulfurization system according to claim 7 drag for grey facility, it is characterized in that: at No. two pump wells of track arranged outside of described transfer gantry grab bucket, described No. two pump wells are connected by communicating pipe with a described pump well.
CN201320486666.3U 2013-08-09 2013-08-09 Ash-fishing facility with double settling ponds of fire coal flue gas desulphurization system Expired - Fee Related CN203392962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320486666.3U CN203392962U (en) 2013-08-09 2013-08-09 Ash-fishing facility with double settling ponds of fire coal flue gas desulphurization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320486666.3U CN203392962U (en) 2013-08-09 2013-08-09 Ash-fishing facility with double settling ponds of fire coal flue gas desulphurization system

Publications (1)

Publication Number Publication Date
CN203392962U true CN203392962U (en) 2014-01-15

Family

ID=49904508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320486666.3U Expired - Fee Related CN203392962U (en) 2013-08-09 2013-08-09 Ash-fishing facility with double settling ponds of fire coal flue gas desulphurization system

Country Status (1)

Country Link
CN (1) CN203392962U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105084632B (en) * 2015-08-31 2018-08-14 张家港市清源水处理有限公司 A kind of salt recovery method of sewage treatment plant
CN112499843A (en) * 2021-02-06 2021-03-16 山东亚邦化工科技有限公司 Calcium ion removing device for calcium sulfate wastewater treatment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105084632B (en) * 2015-08-31 2018-08-14 张家港市清源水处理有限公司 A kind of salt recovery method of sewage treatment plant
CN112499843A (en) * 2021-02-06 2021-03-16 山东亚邦化工科技有限公司 Calcium ion removing device for calcium sulfate wastewater treatment

Similar Documents

Publication Publication Date Title
CN104888599A (en) Spray drying desulfurizer used for cement plant and process method
CN203392962U (en) Ash-fishing facility with double settling ponds of fire coal flue gas desulphurization system
CN103191636A (en) Desulfurizing tower device
CN205440296U (en) Simple and easy automatic vehicle washing system
CN100448512C (en) Coal burning boiler flue gas desulfurization method and device
CN104016523B (en) A kind for the treatment of unit of pickling iron content waste water and treatment process
CN207451781U (en) A kind of multistage reflux air floatation machine
CN201760226U (en) Wet flue gas dust-removal desulphurization device
CN211690688U (en) Silt-proof ground-accumulating groove device
CN204121959U (en) A kind of desulfurizing tower based on spinning disk desulfurization method
CN208599237U (en) A kind of sewage plant horizontal sedimentation tank pond face dross scrapes collection cleaning supplying system
CN209393010U (en) A kind of carbide slag-gypsum wet flue gas desulfurizing device
CN204933239U (en) Flue gas desulphurization system
CN102824825A (en) Multi-effect U-shaped tube type dedusting and desulfurization integrated device of coal-fired boiler and dedusting and desulfurization method thereof
CN202951295U (en) Pulse type cyclone washing device of desulfurization sedimentation basin
CN207903969U (en) A kind of desulfurizing tower recycle water recovery device
CN202690413U (en) Deashing pump and combined type boiler flue gas desulfurization tower employing same
CN206081729U (en) Defecation formula extraction tank of pipeline device is rinsed in area
TW201904651A (en) Device to prevent and control air pollution make the pollutant solution be dissolved in water and lime water and flow into the funnel-shaped trough and then flow through the sedimentation tank and the filter tank
CN104193030A (en) Device for flocculating and separating calcium-magnesium precipitate in formation water through alkaline flooding
CN205683830U (en) A kind of flue gas desulphurization system with pH value measurement apparatus
CN204513431U (en) Flue gas processing equipment of boiler
CN202844653U (en) Desulfurization, dust removal and self-cleaning system of residue-fired boiler
CN204485655U (en) Novel desulfurizing dust removing treatment system
CN206064128U (en) A kind of furnace gas washing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140115

Termination date: 20160809

CF01 Termination of patent right due to non-payment of annual fee