CN203390248U - High-position punching auxiliary device - Google Patents
High-position punching auxiliary device Download PDFInfo
- Publication number
- CN203390248U CN203390248U CN201320504636.0U CN201320504636U CN203390248U CN 203390248 U CN203390248 U CN 203390248U CN 201320504636 U CN201320504636 U CN 201320504636U CN 203390248 U CN203390248 U CN 203390248U
- Authority
- CN
- China
- Prior art keywords
- arm
- fixed
- metal tube
- auxiliary device
- transfer arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model discloses a high-position punching auxiliary device which mainly comprises a metal tube bracket and a lever frame, wherein the lower end of the metal tube bracket is provided with a universal wheel; the upper end of the metal tube bracket is provided with a support point and is connected with the lever frame by the support point; the lever frame comprises a fixed arm and a movable arm; one end of the fixed arm is provided with a connecting hole connected with the support point; the other end of the fixed arm is connected with one end of the movable arm by a connecting component; the other end of the movable arm is provided with an electric drill by a clamping device; the movable arm is driven to move back and forth relative to the fixed arm by the connecting component. The high-position punching auxiliary device has the beneficial effects due to the movable structural design of the metal tube bracket and the lever frame, a constructor is far away from a hole site, and a plurality of holes can be drilled by the high-position punching auxiliary device.
Description
Technical field
The utility model relates to engineering auxiliary appliance apparatus field, specifically, specially refers to a kind of high-order perforating auxiliary device.
Background technology
Now roof finishing is installed the punching of furred ceiling Deng Douyao roof, and present method is all then workman's boring of directly getting on of scaffold, and the deficiency of adopting is in this way:
The position of boring with people from close to, the dust of generation easily enters workmen's eyes, the precision of impact boring.2. sky of every brill all needs a mobile scaffold, and drilling efficiency is low.
In sum, for the defect of prior art, need especially a kind of high-order perforating auxiliary device, to solve above deficiency.
Utility model content
The purpose of this utility model is to provide a kind of high-order perforating auxiliary device, by adopting the portable structure of metal tube support and lever bracket to design, can allow workmen away from position, hole, and can bore a plurality of holes, overcome the deficiency in conventional art, thereby realized the purpose of this utility model.
The technical problem that the utility model solves can realize by the following technical solutions:
High-order perforating auxiliary device, it comprises:
One metal tube support, the lower end of described metal tube support is provided with universal wheel, and the upper end of described metal tube support is provided with fulcrum and connects lever bracket by this fulcrum;
One lever bracket, described lever bracket comprises fixed arm and transfer arm, one end of described fixed arm is provided with the connecting hole being connected with fulcrum, and the other end of fixed arm connects one end of transfer arm by coupling assembling, and described transfer arm can move forward and backward with respect to fixed arm under the drive of coupling assembling;
Described transfer arm comprises stiff end and mobile terminal, described stiff end inside is provided with the through hole running through, described mobile terminal is installed in the through hole of fixed arm and can moves around at through hole, described stiff end and mobile terminal are provided with the fixed bolt hole matching, and the other end of transfer arm is provided with electric drill by clamping device.
In an embodiment of the present utility model, described coupling assembling comprises the first linking arm and the second linking arm, the two ends of described the first linking arm are fixedly connected with transfer arm with fixed arm respectively, the connecting hole fitted bolt that described the second linking arm arranges with it by arm is connected and fixed respectively arm and transfer arm, and one end of described the second linking arm is set to handle.
In an embodiment of the present utility model, the clamping direction of described clamping device is horizontal direction or vertical direction.
The beneficial effects of the utility model are: by adopting the portable structure of metal tube support and lever bracket to design, can allow workmen away from position, hole, and can bore a plurality of holes.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of high-order perforating auxiliary device described in the utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with the specific embodiment, further set forth the utility model.
As shown in Figure 1, high-order perforating auxiliary device described in the utility model, it mainly comprises metal tube support 100 and lever bracket 200.
Wherein, metal tube support 100 lower end is provided with some universal wheels 110, and the quantity of universal wheel 110 does not limit at this, by said structure, designs, and can regulate freely the direction of whole device; Described metal tube support 100 upper end is provided with a fulcrum and connects lever bracket 200 by this fulcrum.
Described transfer arm 220 comprises stiff end 222He mobile terminal 221, described stiff end 222 inside are provided with the through hole running through, described mobile terminal 221 is installed in the through hole of fixed arm 210 and can moves around at through hole, by said structure, designs, and transfer arm 220 can be adjusted the length of self.Described stiff end 222He mobile terminal 221 is provided with the fixed bolt hole 223 matching, and the other end of transfer arm 220 is provided with electric drill 300 by clamping device.
Described coupling assembling comprises the first linking arm and the second linking arm, the two ends of described the first linking arm are fixedly connected with transfer arm 220 with fixed arm 210 respectively, the connecting hole fitted bolt that described the second linking arm arranges with it by arm is connected and fixed respectively arm 210 and transfer arm 220, one end of described the second linking arm is set to handle 221, and workmen can drive the relative fixed arm 210 of transfer arm 220 to move forward and backward by handle 221.
The clamping direction of described clamping device is horizontal direction or vertical direction, by adopting this design, thereby adjustment electric drill 300 that can be flexible towards, improved the wide usage of device.
The beneficial effects of the utility model are: by adopting the portable structure of metal tube support and lever bracket to design, can allow workmen away from position, hole, and can bore a plurality of holes.
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model.The technical staff of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and description, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (3)
1. high-order perforating auxiliary device, is characterized in that, it comprises:
One metal tube support, the lower end of described metal tube support is provided with universal wheel, and the upper end of described metal tube support is provided with fulcrum and connects lever bracket by this fulcrum;
One lever bracket, described lever bracket comprises fixed arm and transfer arm, one end of described fixed arm is provided with the connecting hole being connected with fulcrum, and the other end of fixed arm connects one end of transfer arm by coupling assembling, and described transfer arm can move forward and backward with respect to fixed arm under the drive of coupling assembling;
Described transfer arm comprises stiff end and mobile terminal, described stiff end inside is provided with the through hole running through, described mobile terminal is installed in the through hole of fixed arm and can moves around at through hole, described stiff end and mobile terminal are provided with the fixed bolt hole matching, and the other end of transfer arm is provided with electric drill by clamping device.
2. high-order perforating auxiliary device according to claim 1, it is characterized in that, described coupling assembling comprises the first linking arm and the second linking arm, the two ends of described the first linking arm are fixedly connected with transfer arm with fixed arm respectively, the connecting hole fitted bolt that described the second linking arm arranges with it by arm is connected and fixed respectively arm and transfer arm, and one end of described the second linking arm is set to handle.
3. high-order perforating auxiliary device according to claim 1, is characterized in that, the clamping direction of described clamping device is horizontal direction or vertical direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320504636.0U CN203390248U (en) | 2013-08-19 | 2013-08-19 | High-position punching auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320504636.0U CN203390248U (en) | 2013-08-19 | 2013-08-19 | High-position punching auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203390248U true CN203390248U (en) | 2014-01-15 |
Family
ID=49901810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320504636.0U Expired - Fee Related CN203390248U (en) | 2013-08-19 | 2013-08-19 | High-position punching auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203390248U (en) |
-
2013
- 2013-08-19 CN CN201320504636.0U patent/CN203390248U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204182974U (en) | A kind of angle steel hand drill | |
CN203390248U (en) | High-position punching auxiliary device | |
CN205577363U (en) | Wall body recessing tool is used to fitment | |
CN204585571U (en) | Multifunctional wall drilling equipment | |
CN204252623U (en) | A kind of easy-to-mount bracing wire sheath | |
CN203160689U (en) | Hole reserving device for building construction | |
CN203160074U (en) | Track locating tool in track hole drilling | |
CN205583474U (en) | Firm rig mobile power station fixes a position | |
CN204782759U (en) | Drilling rod bracket device | |
CN204899789U (en) | Rigid suspension contact net platform of perpendicularly upwards driling | |
CN203959108U (en) | A kind of telescopic coal spout | |
CN203992473U (en) | A kind of borehole drill construction | |
CN205166824U (en) | Pipeline joint crimping tool | |
CN102463390B (en) | Grinding device for joint surface between lathe sliding plate and lathe saddle | |
CN205663176U (en) | Shaped steel for building that runs through outer wall scaffold frame of encorbelmenting | |
CN209021982U (en) | A kind of tooling to assemble drill carriage buffer unit | |
CN203266600U (en) | Moving bench vice table | |
CN204012418U (en) | A kind of cable testing bridge mounting auxiliary | |
CN203096624U (en) | Cantilever pouring bridge high-attitude construction bracket | |
CN102990124A (en) | High punch auxiliary device | |
CN203621562U (en) | Supporting device of drilling machine | |
CN202970462U (en) | Drill carriage with horizontally pushed drilling mechanism | |
CN102996077A (en) | High punch positioning device | |
CN205315040U (en) | Mining rest support | |
CN204674650U (en) | Dolly device for positioning and securing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 310000 Room 501, 5 / F, 5 building, Chai house, Jianggan District, Hangzhou, Zhejiang. Patentee after: YUANCHENG ENVIRONMENT CO.,LTD. Address before: 310000 Room 501, 5 / F, 5 building, Chai house, Jianggan District, Hangzhou, Zhejiang. Patentee before: ZHEJIANG YUANCHENG LANDSCAPE GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 Termination date: 20210819 |