CN203373757U - Sash green ecological protection structure - Google Patents

Sash green ecological protection structure Download PDF

Info

Publication number
CN203373757U
CN203373757U CN201320404625.5U CN201320404625U CN203373757U CN 203373757 U CN203373757 U CN 203373757U CN 201320404625 U CN201320404625 U CN 201320404625U CN 203373757 U CN203373757 U CN 203373757U
Authority
CN
China
Prior art keywords
sash
side slope
safeguard structure
green ecological
rectangular concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320404625.5U
Other languages
Chinese (zh)
Inventor
叶春林
周革
何文春
顾湘生
赵新益
黄太武
王亚飞
刘勇
代云山
陈华明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201320404625.5U priority Critical patent/CN203373757U/en
Application granted granted Critical
Publication of CN203373757U publication Critical patent/CN203373757U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a sash green ecological protection structure. The protection structure comprises a side slope toe wall foundation and rectangular concrete sashes arranged from the side slope toe wall foundation to the side slope surface layer of a slope crest at intervals. The sash green ecological protection structure is characterized in that geo-grids parallel with the horizontal line are fixedly arranged inside the positions from the side slope toe wall foundation to the side slope surface layer of the slope crest and a filling layer, three-dimensional ecological water draining systems are arranged at the position, between the rectangular concrete sashes, inside the side slope surface layer, and the three-dimensional ecological water draining systems further comprise ecological bag embankments which are arranged in a stacked mode. The regular rectangular concrete sashes are adopted, so that paying off, slotting, formwork erecting, pouring and other constructions are convenient. Due to the fact that the structure is divided into independent units, ecological bags in several sashes can be inlaid at the same time and are not mutually interfered, and construction and maintenance are convenient.

Description

Sash green ecological safeguard structure
Technical field
The utility model relates to a kind of near the roadbed side slope famous scenerys such as railway, highway, water conservancy and civilian construction, Main Towns and sash green ecological safeguard structure of immersion roadbed side slope of being applicable to.
Background technology
Near slope project famous scenery, Main Towns requires vegetation coverage high, on high embankment side slope surface, should not adopt large stretch of bricklaying protection types such as mortar flag stone, dry-laid rubble, also is not suitable for planting tall and big shrub on domatic; , because soil moved in to improve the original in the skeleton bank protection spreads grass-seed and shrub etc., be grown directly upon in the soil moved in to improve the original soil body simultaneously, affected by soil property, weather etc., the compliance of plant is undesirable, poor growth, and part need to be reseeded and could be improved vegetation coverage.
Different safeguard procedures have different defects:
1) adopting soil moved in to improve the original in concrete hollow block to broadcast sowing grass-seed, to protect the domatic height of its protection limited.
2) adopt intercept water soil moved in to improve the original in skeleton of concrete arch to broadcast sowing that its plant growth rate of protection type of grass-seed, plantation shrub is slow, a survival rate is low, part need to take the measure of reseeding to reach the requirement of high coverage rate.
While 3) adopting arch to intercept water the protection of skeleton pattern, although domes are better to domatic support, drainage effect, the construction of the arcuate structure of arched framework is trouble, and work efficiency is low.
4) adopt the form protection of laying ecology bag can guarantee the survival rate of plant, can improve fast domatic vegetation coverage.But it is domatic directly to adopt ecology bag to be laid on, although can improve vegetation coverage, for high embankment side slope, along with long-term rain drop erosion, the domatic easy part of embankment slips and collapses, and globality is poor.
Summary of the invention
The purpose of this utility model is to provide a kind of sash green ecological safeguard structure, can guarantee the green high coverage rate of slope project, improves the domatic globality of embankment simultaneously.
For achieving the above object, the designed a kind of sash green ecological safeguard structure of the utility model, in the side slope top layer that this safeguard structure comprises the foundation of wall of side slope pin, push up to slope from the foundation of wall of side slope pin, the Rectangular Concrete sash is offered at interval; The side slope top layer of pushing up to slope from the foundation of wall of side slope pin is parallel to horizontal geo-grid to being fixedly installed in packed layer, in side slope top layer between the Rectangular Concrete sash, setting has three-dimensional ecological drainage system, and three-dimensional ecological drainage system also includes the ecology bag revetment of arranged stacked.
Further, on the inwall of described native sash both sides, be provided with the concrete baffle plate, it is higher than Rectangular Concrete sash top and not higher than Rectangular Concrete sash bottom.
Again further, between described ecology bag revetment, by the three-dimensional water discharge coupling button, be connected, be provided with the multilayer gutter by the nonwoven parcel between described ecology bag revetment, it is quincuncial pile, and the first half of drainage pipe end is drilled with 5 ~ 10 drain holes.
Again further, a described end below that is drilled with the gutter of drain hole is provided with the clay that thickness is 150 ~ 300mm.
Again further, a described end and the clay top that is drilled with the gutter of drain hole is provided with from the inside to the outside for sand stone layer, outer sand stone layer and nonwoven in the wrapped row water pipe mouth of pipe.
Again further, coarse gravel or rubble that described interior sand stone layer is 150 ~ 300mm by thickness form, and gravel or aggregate chips that described outer sand stone layer is 5 ~ 20mm by thickness form.
Again further, be filled with soil and plant in described ecology bag revetment.
Again further, the peripheral surrounding of the described ecology bag revetment away from Rectangular Concrete sash one side is provided with for the fixing fringing of ecology bag revetment, and the width of fringing is 0.5 ~ 0.9m.
Again further, length and width and the height of described Rectangular Concrete sash are respectively 2.8 ~ 4.5m, 1 ~ 1.5m, and 0.4 ~ 0.6m, the thickness of described concrete baffle plate is 0.1m.
The present invention also provides a kind of construction of sash green ecological safeguard structure, comprises the following steps:
1) at first side slope is filled, and builds the foundation of wall of side slope pin, in the side slope surface layering, geo-grid is set, and fills closely knit;
2) clean again domatic surface dust with water, fill up hole recessed, make domatic cardinal principle smooth;
3) the Rectangular Concrete sash build front according to sash size design pattern, the setting-out of size hanging wire, the excavation groove, groove dimensions;
4) building the Rectangular Concrete sash should, from the slope toe wall basis, build from bottom to top; The concrete sash should be with domatic closely connected, and sash flowing water face should be smooth-going with surface, careless slope; When sash basis and bottom lateral sulcus platform concrete joint, answer monobloc cast not stay gap;
5) arrange gutter, interior sand stone layer, interior sand stone layer and nonwoven between the Rectangular Concrete sash;
6) ecology bag is installed.
The utility model has the advantage of:
(1) the utility model adopts the form of rectangle frame lattice structure in conjunction with the ecology bag protection, both reinforced the embankment side slope, the code block construction of ecology bag is convenient to again in upright sash space, construction efficiency is high, and late maintaining is convenient, in conjunction with the Fill Reinforced With Geogrids layer arranged in fill stratum, makes domatic fill stratum form an integral body, good stability, the domatic height of reinforcing is higher, and the rectangle sash also can longitudinally be adjusted with slope shape, applied widely.
(2) adopt gridiron structure by the domatic independently pretective acreage of fritter that is divided into, strengthened the stability of ecology bag.Need to reform while doing for supplement when the ecology bag of single grid, not affect the ecology bag in other sash.Simultaneously because sash bricklaying area is little, the ecology bag plant growth out after, can well cover concrete, vegetation coverage is high, afforestation effect is good.
(3) the utility model adopts regular Rectangular Concrete sash unwrapping wire, fluting, formwork erection, the easy construction such as builds.Be independently unit owing to cutting apart, the ecology bag in several sashes can be paved operation simultaneously, does not interfere with each other, and construction, maintenance are conveniently.
The accompanying drawing explanation
Fig. 1 is profile of the present utility model;
Fig. 2 is front view of the present utility model;
The I-I sectional drawing that Fig. 3 is Fig. 2;
Fig. 4 is three-dimensional ecological drainage system structure chart;
In figure, 1. side slope pin foundation of wall, 2. Rectangular Concrete sash, 3. geo-grid, 4. three-dimensional ecological drainage system, 41. the ecology bag revetment, 42. gutters, 43. interior sand stone layer, 44. outer sand stone layer, 45. nonwoven, 46. the three-dimensional water discharge coupling button is connected, 421. drain holes, 5. concrete baffle plate, 6. fringing.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, so that those skilled in the art understand.
A kind of sash green ecological safeguard structure shown in figure, in the side slope top layer that this safeguard structure comprises side slope pin foundation of wall 1, push up to slope from side slope pin foundation of wall 1, Rectangular Concrete sash 2 is offered at interval; The side slope top layer of pushing up to slope from side slope pin foundation of wall 1 is parallel to horizontal geo-grid 3 to being fixedly installed in packed layer, in side slope top layer between Rectangular Concrete sash 2, setting has three-dimensional ecological drainage system 4, three-dimensional ecological drainage system 4 also includes the ecology bag revetment 41 of arranged stacked, in ecology bag revetment 41, is filled with soil and plant.
Be provided with concrete baffle plate 5 on the inwall of Rectangular Concrete sash 2 both sides, it is higher than Rectangular Concrete sash 2 tops and not higher than Rectangular Concrete sash 2 bottoms.Length and width and the height of Rectangular Concrete sash 2 are respectively 3m, 1m, and 0.4m, the thickness of described concrete baffle plate 5 is 0.1m.For convenient maintenance, on Rectangular Concrete sash 2, wide 1.0m is established in appropriate location, and the stairstepping of thick 0.5m is marked time.
Be connected 46 by the three-dimensional water discharge coupling button between ecology bag revetment 41, be provided with the multilayer gutter 42 by nonwoven 45 parcels between ecology bag revetment 41, it is quincuncial pile, and the first half of gutter 42 ends is drilled with 8 drain holes 421.An end below that is drilled with the gutter 42 of drain hole is provided with the clay that thickness is 200mm.
Be drilled with the end of gutter 42 of drain hole and clay top by the interior sand stone layer 43, outer sand stone layer 44 and the nonwoven 45 that are provided with outside interior for wrapped row water pipe 42 mouths of pipe, wherein, coarse gravel or rubble that interior sand stone layer 43 is 200mm by thickness form, and gravel or aggregate chips that outer sand stone layer 44 is 10mm by thickness form.
Away from the peripheral surrounding of ecology bag revetment 41 of native sash 2 one sides, be provided with for the fixing fringing 6 of ecology bag revetment 41, the wide fringing of 0.5m is established at bank protection starting point, terminal and side and top, and the fringing of 0.8m is established in bottom.Fringing 6 and Rectangular Concrete sash 2 all adopt C25 concreting.
Implementation step:
1) field investigation
By field investigation, find out ratio of slope, the height equal section size of high embankment side slope, and weather conditions, the soil nature of fill stratum, the hydrogeological conditions of construction work point.
2) at first side slope is filled, and builds side slope pin foundation of wall 1, in the side slope surface layering, geo-grid is set, and fills closely knit;
3) clean again domatic surface dust with water, fill up hole recessed, make domatic cardinal principle smooth;
4) Rectangular Concrete sash 2 build front according to native sash size design pattern, the setting-out of size hanging wire, the excavation groove, groove dimensions;
5) building Rectangular Concrete frame 2 lattice should, from the slope toe wall basis, build from bottom to top; The Rectangular Concrete sash should be with domatic closely connected, and sash flowing water face should be smooth-going with surface, careless slope; When the sash basis is connected with bottom lateral sulcus platform concrete, answer monobloc cast not stay gap;
6) arrange gutter 41, interior sand stone layer 43, outer sand stone layer 44 and nonwoven 45 between Rectangular Concrete sash 2;
7) ecology bag is installed.
The ecology bag construction technical requirement:
(1) ecology bag technical requirements:
Take polypropylene as primary raw material, there is uvioresistant, antiacid alkali, the function such as permeable soil impervious.Adopt the nonwoven needling process to make through the single face sintering, the bag material is containing environment being had to the decomposed aromatic amine composition that endangers 23 kinds of forbiddings such as sex benzidine; Ecology bag quality of materials >=100g/m, its mechanics parameter and effective aperture index meet GB (GB/T17639-1998, vertically >=4.5KN/m, laterally >=4.5KN/m, CBR bursting strength >=800N, effective aperture φ are 0.07-0.20mm) requirement; Very friendly to plant, plant roots and stems energy free penetrating bag Fast Growth; Its model commonly used is LB-M, and specification is 815 * 440(mm), the product specification error range is ± 5%; It is 580 * 330 * 150 (mm) that bag moulding specification is commonly used; Its bagging line, tying band must be black and have anti-ultraviolet property.The black tying band of ecology bag must have uvioresistant and unidirectional self-lock structure function.
(2) three-dimensional water discharge coupling button technical requirements:
Require as follows: its material and environmental-protecting performance conform to ecology bag.Must there be the ratchet that possesses the barb characteristic its top and bottom, the ratchet sum is no less than 12, highly is not less than 25mm, by the scientific and reasonable distribution of mechanics requirement, any two ratchets all, not on same shear failure track, are brought into play the mechanical function of each ratchet to greatest extent.The vertical hole that meets plant growth and draining is no less than 32, and each hole diameter is greater than 15mm, and the hole water permeable area is not less than 45% of the coupling buckle gross area, to meet the requirement of multidirectional row's drainage and plant root growth.Its two-way groove is combined into interlaced Nonlinear Convex rib structure with vertical hole, forms the tight lock construction of internal friction with the barb ratchet of scientific and reasonable distribution, to meet the requirement that structural safety is stable.Respectively there are 6 ratchets the top and bottom of three-dimensional water discharge coupling button (model specification is 308 * 83 * 56), and the shearing force that single-pawl can bear is greater than 360N.
(3) give birth to the technical requirements of bag discharge structure:
Gutter adopts the PVC50 type, 200 grams for pipe end/flat geotextiles parcel, and the outside gradient 5% of pipe end, be plum blossom-shaped and arrange, along domatic vertical interval 2m.The outside gradient of the film that blocks water is 5%.
(4) need not carry out in advance the geo-grid laying when ecological revetment is not constructed together with the body of former slope, grid place backfill requires compaction in layers, and its degree of compaction need meet the railway bed code requirement.Should widen the backfill compacting width when ecological revetment is not constructed with roadbed to guarantee the slope compaction degree simultaneously, specifically be determined by design.
(5) ecology bag loads sandy soil, determines kind and the incorporation of fertilizer according to field condition, and the filler of ecology bag should be matched according to the specific requirement of different engineerings, slope body ground situation and vegetation kind.
(6) 1.0 meters high of every constructions are watered after pre-sedimentation to filler, then carry out next procedure.

Claims (9)

1. sash green ecological safeguard structure, in the side slope top layer that this safeguard structure comprises side slope pin foundation of wall (1), push up to slope from side slope pin foundation of wall (1), Rectangular Concrete sash (2) is offered at interval, it is characterized in that: the side slope top layer of pushing up to slope from side slope pin foundation of wall (1) is parallel to horizontal geo-grid (3) to being fixedly installed in packed layer, in side slope top layer between Rectangular Concrete sash (2), setting has three-dimensional ecological drainage system (4), and three-dimensional ecological drainage system (4) also includes the ecology bag revetment (41) of arranged stacked.
2. sash green ecological safeguard structure according to claim 1, it is characterized in that: be provided with concrete baffle plate (5) on the inwall of described native sash (2) both sides, it is not less than Rectangular Concrete sash bottom higher than Rectangular Concrete sash top and concrete baffle plate (5) bottom concrete baffle plate (5) top.
3. sash green ecological safeguard structure according to claim 1 and 2, it is characterized in that: between described ecology bag revetment (41) by three-dimensional water discharge coupling button be connected (46), be provided with the multilayer gutter (42) by nonwoven (45) parcel between described ecology bag revetment (41), it is quincuncial pile, and the first half of gutter (42) end is drilled with 5~10 drain holes (421).
4. sash green ecological safeguard structure according to claim 3 is characterized in that: a described end below that is drilled with the gutter (42) of drain hole is provided with the clay that thickness is 150~300mm.
5. sash green ecological safeguard structure according to claim 4 is characterized in that: an end of the described gutter (42) that is drilled with drain hole and clay top are by the interior sand stone layer (43), outer sand stone layer (44) and the nonwoven (45) that are provided with outside interior for wrapped row water pipe (42) mouth of pipe.
6. sash green ecological safeguard structure according to claim 5, it is characterized in that: coarse gravel or rubble that described interior sand stone layer (43) is 150~300mm by thickness form, and gravel or aggregate chips that described outer sand stone layer (44) is 5~20mm by thickness form.
7. sash green ecological safeguard structure according to claim 3, is characterized in that: in described ecology bag revetment (41), be filled with soil and plant.
8. sash green ecological safeguard structure according to claim 1 and 2, it is characterized in that: away from the peripheral surrounding of ecology bag revetment (41) of described Rectangular Concrete sash (2) one sides, be provided with for the fixing fringing (6) of ecology bag revetment (41), the width of fringing (6) is 0.5~0.9m.
9. sash green ecological safeguard structure according to claim 1 and 2, it is characterized in that: length and width and the height of described Rectangular Concrete sash (2) are respectively 2.8~4.5m, 1~1.5m, 0.4~06m, the thickness of described native baffle plate (5) is 0.1~0.2m.
CN201320404625.5U 2013-07-08 2013-07-08 Sash green ecological protection structure Expired - Lifetime CN203373757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320404625.5U CN203373757U (en) 2013-07-08 2013-07-08 Sash green ecological protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320404625.5U CN203373757U (en) 2013-07-08 2013-07-08 Sash green ecological protection structure

Publications (1)

Publication Number Publication Date
CN203373757U true CN203373757U (en) 2014-01-01

Family

ID=49836302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320404625.5U Expired - Lifetime CN203373757U (en) 2013-07-08 2013-07-08 Sash green ecological protection structure

Country Status (1)

Country Link
CN (1) CN203373757U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898884A (en) * 2014-03-26 2014-07-02 重庆地质矿产研究院 Method for eliminating soil medium current of terrace in landslide area
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method
CN109006324A (en) * 2018-08-08 2018-12-18 昆明春景园林绿化有限责任公司 A kind of method for greening side slope that late maintaining difficulty is effectively reduced
CN109235468A (en) * 2018-10-23 2019-01-18 中铁第四勘察设计院集团有限公司 A kind of slope protection structure for In A Crushed Rock cut slope
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN110424419A (en) * 2019-08-06 2019-11-08 中矿复绿(北京)生态科技发展有限公司 A kind of construction method of sash beam greening side slope system
CN110552322A (en) * 2019-08-28 2019-12-10 广东水利电力职业技术学院(广东省水利电力技工学校) Flat-laying type slope protection structure utilizing river channel silt cleaning materials and construction method thereof
CN110984185A (en) * 2019-11-22 2020-04-10 中国电建集团贵阳勘测设计研究院有限公司 Positioning structure for slope sash beam protection construction and construction method thereof
CN114635434A (en) * 2020-12-16 2022-06-17 中交第四公路工程局有限公司 Greening protection method for roadbed high slope of earthquake fault zone
CN115492048A (en) * 2022-09-21 2022-12-20 中铁九局集团第一建设有限公司 Three-dimensional ecological slope protection construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898884A (en) * 2014-03-26 2014-07-02 重庆地质矿产研究院 Method for eliminating soil medium current of terrace in landslide area
CN103898884B (en) * 2014-03-26 2015-11-18 重庆地质矿产研究院 Method for eliminating soil medium current of terrace in landslide area
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method
CN109006324A (en) * 2018-08-08 2018-12-18 昆明春景园林绿化有限责任公司 A kind of method for greening side slope that late maintaining difficulty is effectively reduced
CN109235468A (en) * 2018-10-23 2019-01-18 中铁第四勘察设计院集团有限公司 A kind of slope protection structure for In A Crushed Rock cut slope
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN109837916B (en) * 2019-03-13 2021-01-12 湖北工业大学 Ecological restoration method for side slope of split wooden sash
CN110424419A (en) * 2019-08-06 2019-11-08 中矿复绿(北京)生态科技发展有限公司 A kind of construction method of sash beam greening side slope system
CN110552322A (en) * 2019-08-28 2019-12-10 广东水利电力职业技术学院(广东省水利电力技工学校) Flat-laying type slope protection structure utilizing river channel silt cleaning materials and construction method thereof
CN110984185A (en) * 2019-11-22 2020-04-10 中国电建集团贵阳勘测设计研究院有限公司 Positioning structure for slope sash beam protection construction and construction method thereof
CN114635434A (en) * 2020-12-16 2022-06-17 中交第四公路工程局有限公司 Greening protection method for roadbed high slope of earthquake fault zone
CN115492048A (en) * 2022-09-21 2022-12-20 中铁九局集团第一建设有限公司 Three-dimensional ecological slope protection construction method

Similar Documents

Publication Publication Date Title
CN203373757U (en) Sash green ecological protection structure
CN107558480B (en) The construction method of the reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN202718138U (en) Self-locking type ecological retaining wall structure
CN104532857A (en) Flexible expansion reduced ecological slope protection construction
CN204849509U (en) Highway roadbed structure of antidetonation sand prevention
CN106368238B (en) A kind of honeycomb geotechnical grid retaining wall and its construction method with ecological recovery function
CN103669399A (en) Concrete panel reinforced retaining wall and construction method thereof
CN201746828U (en) Geogrid enclosed type reinforced road embankment
CN106759397A (en) Ecological lattice guest method to set up
CN114182745B (en) Ecological slope protection roadbed of high-liquid limit soil ecological retaining wall and construction method
CN111691435A (en) Expansive soil cutting slope protection method
CN204356788U (en) Flexibility subtracts swollen ecological revetment structure
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN205369297U (en) Hollow building block formula barricade with prop up and keep off and afforest function
CN107152012A (en) Sluice construction technique
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
CN105155576A (en) Retaining wall and bricks thereof
CN210066391U (en) Shock attenuation environmental protection roadbed structure
CN206887972U (en) The reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN206521949U (en) Frame module formula Polymer Geogrids Reinforced Earth safeguard structure
CN207176627U (en) Large-scale earthing concrete block
CN203808101U (en) Reinforced earth retaining wall with concrete panel
CN216445914U (en) Hydraulic engineering river course combined type ecological bank protection
CN207812462U (en) A kind of safeguard structure that ragstone slope engineering is combined with plant
CN210621724U (en) Water-retaining slope protection structure for arid area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140101

CX01 Expiry of patent term