A kind of linkage structure of steel skeleton composite
Technical field
The utility model belongs to tubing manufacturing technical field, relates to a kind of linkage structure of steel skeleton composite.
Background technique
Steel skeleton composite is widely used in the association areas such as municipal engineering, chemical industry, colliery, agricultural, manufacturing industry as a kind of novel anticorrosion pipeline, the steel skeleton composite adopted at present generally is comprised of plastic layer and the Steel Wire Braid that is clipped between plastic layer, in use, the connection between tube and tube mainly adopts the electric heating sleeve to be connected with lap joint flange.As shown in Figure 1, between two steel skeleton composites 1, adopt electric heating sleeve 2 to be connected, and be provided with wiring terminal 3 on electric heating sleeve 2, adopt this Placement to need at the construction field (site) to have electricity, due to requirement being arranged heating time, therefore installation personnel must have construction experience, need carry out special training to installation personnel, and can't dismantle after installing, produce to leak when construction and be difficult for being found, once find that water has leaked all to amputate and reuse electrothermal sleeve and constructed, to construction with larger trouble, not only affect construction speed, but also greatly increased construction cost.As Fig. 2 connects for the employing lap joint flange, this Placement is that the end at steel skeleton composite 1 is fixed with joint 11, again lap joint flange 4 is enclosed within steel skeleton composite 1 from the back of joint 11, and then adopts bolt 5 that two steel skeleton composites 1 are linked together.Adopting this Placement is an integral body due to joint 11 and steel skeleton composite 1, while therefore connecting, cannot adjust, in concrete using process, need could use in position just two steel skeleton composite accurate Calculation, therefore use comparatively inconvenience, joint 11 needs special the making simultaneously, and manufacturing efficiency is lower, therefore in Specific construction, seldom use, and must again change steel skeleton composite as calculated or point tolerance being installed, cause waste of material, increase construction cost.
The model utility content
For addressing the above problem, the utility model provides a kind of linkage structure of steel skeleton composite, thereby greatly enhances productivity, and reduces construction cost.
The utility model is achieved through the following technical solutions:
A kind of linkage structure of steel skeleton composite comprises steel skeleton composite, flange and is arranged on the connected element of steel skeleton composite one end that described connected element is screwed sleeve pipe, and described sleeve pipe is connected with steel skeleton composite by screw thread.
Described sleeve pipe one end is provided with flange.
Described screw thread is outside thread.
The internal diameter of described externally threaded size and steel skeleton composite is complementary.
The beneficial effects of the utility model are:
Compared with prior art, the utility model is by increase connected element on steel skeleton composite, and connected element adopts threaded sleeve pipe and steel skeleton composite to realize being flexibly connected, flexible for installation in construction, be convenient to dismounting, simple to operate, without installation personnel is carried out to special training.The utility model is simple in structure, is convenient to manufacture, and produces to leak to dismantle in Specific construction and is keeped in repair, can rationally regulate simultaneously, made up in concrete using process because of the out of use deficiency of error of calculations, greatly reduced construction cost, accelerating construction progress.
The accompanying drawing explanation
Fig. 1 is that tradition adopts the electric heating sleeve to connect the structural representation of steel skeleton composite;
Fig. 2 is that tradition adopts lap joint flange to connect the structural representation of steel skeleton composite;
Fig. 3 is the utility model steel skeleton composite linkage structure schematic diagram;
Fig. 4 is the sleeve structure schematic diagram in the utility model;
The schematic diagram of Fig. 5 for adopting sleeve pipe described in the utility model that two steel skeleton composites are linked together.
In figure: 1-steel skeleton composite, 2-electrothermal sleeve, 3-wiring terminal, 4-lap joint flange, 5-bolt, 6-connected element, 7-flange, 11-joint, 61-screw thread, 62-flange.
Embodiment
Further describe the technical solution of the utility model below in conjunction with accompanying drawing, but that claimed scope is not limited to is described.
As shown in Figures 3 to 5, the linkage structure of a kind of steel skeleton composite described in the utility model, comprise steel skeleton composite 1, flange 7 and be arranged on the connected element 6 of steel skeleton composite 1 one ends, described connected element 6 is for being threaded 61 sleeve pipe, and described sleeve pipe is connected with steel skeleton composite 1 by screw thread 61.Adopt the technical program, can dismantle flexibly and easily the steel skeleton composite 1 connected, if leakage is arranged in construction, can for convenience detachly place under repair, avoided traditional Placement easily stuck in work progress, and leaked and need to amputate the trouble that whole pipes re-start construction.Accelerating construction progress, reduce construction cost greatly.
Described sleeve pipe one end is provided with flange 62.So in actual applications, flange 62 can block flange 7, increases the join strength of steel skeleton composite 1, prevents that flange 7 from producing obscission.
Described screw thread (61) is outside thread.
The internal diameter of described externally threaded size and steel skeleton composite 1 is complementary.Be convenient to like this Thread Forming TF and form good coordinating with the inside of steel skeleton composite 1, prevent from producing and leaking in work progress.
As shown in Figure 4, Figure 5, the utility model in use, sleeve pipe in connected element 6 is shot in steel skeleton composite 1 certainly by screw thread 61, make the end face laminating of flange 62 with framework composite tube 1 mounting sleeve one end of sleeve pipe, after checking its good seal, flange 7 is sleeved on steel skeleton composite 1, then by bolt 5, will be arranged on flange 7 on steel skeleton composite 1 and be connected and fixed and gets final product.The utility model is installed simple, easy to operate, can be in various anti-corrosion pipeline interconnection techniques field wide popularization and application.