CN203362182U - Tunnel waterproof board fixing and lap-jointing structure - Google Patents

Tunnel waterproof board fixing and lap-jointing structure Download PDF

Info

Publication number
CN203362182U
CN203362182U CN 201320440446 CN201320440446U CN203362182U CN 203362182 U CN203362182 U CN 203362182U CN 201320440446 CN201320440446 CN 201320440446 CN 201320440446 U CN201320440446 U CN 201320440446U CN 203362182 U CN203362182 U CN 203362182U
Authority
CN
China
Prior art keywords
splash guard
steel disc
groove rubber
fitting
lap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320440446
Other languages
Chinese (zh)
Inventor
崔骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN 201320440446 priority Critical patent/CN203362182U/en
Application granted granted Critical
Publication of CN203362182U publication Critical patent/CN203362182U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tunnel waterproof board fixing and lap-jointing structure, and relates to the technical field of underground engineering construction. The fixing and lap-jointing structure comprises an initial concrete support (1), a waterproof board (2), a pre-embedded steel sheet piece (3) and a three-way groove rubber connecting piece (4), wherein one end of the pre-embedded steel sheet piece (3) is pre-embedded in the initial concrete support (1), while the other end of the pre-embedded steel sheet piece (3) is connected into the three-way groove rubber connecting piece (4), and one end of the waterproof board is also connected into the three-way groove rubber connecting piece (4). The fixing and lap-jointing structure achieves a novel connection way which is simple in construction and materials.

Description

A kind of anchor bar of waterproof plate in tunnels is fixed and bridging arrangement
Technical field:
The utility model relates to the Construction Technique of Underground Works field, is specifically related to a kind of anchor bar of waterproof plate in tunnels and fixes and bridging arrangement.
Background technology:
In the underground engineering construction of railway, highway, subway tunnel, the most frequently used method of tunnel lining is first on the tunnel metope, to spray the sprayed mortar of 5-20 centimetre of one deck as the preliminary bracing layer, then lay the geotextiles cushion coat, splash guard is installed again, and rear mold is built the concrete secondary liner of 30-50 centimetre.
Waterproofing course is comprised of geotextiles and splash guard usually, and effect is the path between blocking groundwater and secondary lining.Usually the job practices of splash guard is for first saying that the nail nail is in supporting in the early stage, then splash guard is fastened on nail, ailhead easily punctures splash guard like this, destroy the globality of splash guard, affect result of use, and construction is trouble comparatively, inefficiency, be improved to afterwards first floor splash guard nail propped up on mask in the early stage, then with second layer splash guard, covered fixed position, be welded on first floor, in this job practices, rosin joint easily appears in welding position, and the phenomenons such as few weldering, easily cause and leak, and construction sequence is more, quality is wayward.The overlap joint of splash guard typically uses welding, rosin joint easily occurs, the situation of few weldering or destruction splash guard, and construction is comparatively complicated, and efficiency is very low.
The utility model content:
The purpose of this utility model is to provide a kind of anchor bar of waterproof plate in tunnels and fixes and bridging arrangement, and it utilizes steel disc built-in fitting and the combination of three-dimensional groove rubber connector be embedded in the concrete preliminary bracing, and fixedly splash guard and preliminary bracing, can overlap splash guard again.
In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it comprises concrete preliminary bracing 1, splash guard 2, steel disc built-in fitting 3 and three-dimensional groove rubber connector 4, one end of steel disc built-in fitting 3 is embedded in solidifying native preliminary bracing 1, the other end of steel disc built-in fitting 3 is connected in three-dimensional groove rubber connector 4, and an end of splash guard 2 is connected in three-dimensional groove rubber connector 4.
Described steel disc built-in fitting 3 is for bar shaped steel disc structure and be provided with pawl shape structure, can increase like this its contact area, has well improved the connection of two parts.
Described splash guard 2 for gapless is connected, can better be realized the effect of waterproof with three-dimensional groove rubber connector 4 like this.
The utility model operating principle: steel disc built-in fitting 3 was first fixed along the tunnel cross section hoop before sprayed mortar preliminary bracing 1, and reserve concrete preliminary bracing face 1-2 centimetre, to inject three-dimensional groove rubber connector 4 after steel disc built-in fitting 3 daubs that reserve, after glue is dry, respectively the splash guard on both sides 2 edge daubs are inserted to three-dimensional groove rubber connector 4.
The utlity model has following beneficial effect: improved the method for attachment of splash guard and tunnel metope, do not destroy the globality of splash guard fully, very high bonding strength is arranged, job practices is simple, step is few, efficiency of construction improves 2-3 doubly, and waterproofing course especially full-packaging waterproof layer is had very important significance.Improved the bridging method between splash guard simultaneously, avoided the overlap joint crack fully, good according to the waterproofing course planeness after this structure construction, tight with the laminating of tunnel metope, very high globality and planarization are arranged, facilitate the construction of secondary lining, construction technology is simple, overlap joint speed is very fast, has very high production efficiency and economic benefit.Waterproofing course with this structure overlap joint has very high scalability, can prevent from that the splash guard caused because of the secondary lining concrete deformation from destroying to cause waterproofing course to lose efficacy.
The accompanying drawing explanation:
Fig. 1 is the cross-sectional view strength of the utility model node;
Fig. 2 is the plan view of the utility model node.
The specific embodiment:
Referring to Fig. 1, Fig. 2, this specific embodiment is by the following technical solutions: it comprises concrete preliminary bracing 1, splash guard 2, steel disc built-in fitting 3 and three-dimensional groove rubber connector 4, one end of steel disc built-in fitting 3 is embedded in solidifying native preliminary bracing 1, the other end of steel disc built-in fitting 3 is connected in three-dimensional groove rubber connector 4, and an end of splash guard 2 is connected in three-dimensional groove rubber connector 4.
Described steel disc built-in fitting 3 is for bar shaped steel disc structure and be provided with pawl shape structure, can increase like this its contact area, has well improved the connection of two parts.
Described splash guard 2 with three-dimensional groove rubber connector 4 for gapless is connected, the effect that realizes waterproof that can follow like this.
This specific embodiment operating principle: steel disc built-in fitting 3 was first fixed along the tunnel cross section hoop before sprayed mortar preliminary bracing 1, and reserve concrete preliminary bracing face 1-2 centimetre, to inject three-dimensional groove rubber connector 4 after steel disc built-in fitting 3 daubs that reserve, after glue is dry, respectively the splash guard on both sides 2 edge daubs are inserted to three-dimensional groove rubber connector 4.
This specific embodiment has following beneficial effect: it is a kind of simple structure, material is simple, the simple Novel connection type of constructing, it has improved the method for attachment of splash guard and tunnel metope, does not destroy the globality of splash guard fully, and very high bonding strength is arranged, job practices is simple, step is few, and efficiency of construction improves 2-3 doubly, and waterproofing course especially full-packaging waterproof layer is had very important significance.Improved the bridging method between splash guard simultaneously, avoided the overlap joint crack fully, good according to the waterproofing course planeness after this structure construction, tight with the laminating of tunnel metope, very high globality and planarization are arranged, facilitate the construction of secondary lining, construction technology is simple, overlap joint speed is very fast, has very high production efficiency and economic benefit.Waterproofing course with this structure overlap joint has very high scalability, can prevent from that the splash guard caused because of the secondary lining concrete deformation from destroying to cause waterproofing course to lose efficacy.

Claims (3)

1. an anchor bar of waterproof plate in tunnels is fixed and bridging arrangement, it is characterized in that it comprises concrete preliminary bracing (1), splash guard (2), steel disc built-in fitting (3) and three-dimensional groove rubber connector (4), one end of steel disc built-in fitting (3) is embedded in solidifying native preliminary bracing (1), the other end of steel disc built-in fitting (3) is connected in three-dimensional groove rubber connector (4), and an end of splash guard (2) is connected in three-dimensional groove rubber connector (4).
2. a kind of anchor bar of waterproof plate in tunnels according to claim 1 is fixed and bridging arrangement, it is characterized in that described steel disc built-in fitting (3) for bar shaped steel disc structure and is provided with pawl shape structure.
3. a kind of anchor bar of waterproof plate in tunnels according to claim 1 is fixed and bridging arrangement, it is characterized in that described splash guard (2) is connected for gapless with three-dimensional groove rubber connector (4).
CN 201320440446 2013-07-23 2013-07-23 Tunnel waterproof board fixing and lap-jointing structure Expired - Fee Related CN203362182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320440446 CN203362182U (en) 2013-07-23 2013-07-23 Tunnel waterproof board fixing and lap-jointing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320440446 CN203362182U (en) 2013-07-23 2013-07-23 Tunnel waterproof board fixing and lap-jointing structure

Publications (1)

Publication Number Publication Date
CN203362182U true CN203362182U (en) 2013-12-25

Family

ID=49809968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320440446 Expired - Fee Related CN203362182U (en) 2013-07-23 2013-07-23 Tunnel waterproof board fixing and lap-jointing structure

Country Status (1)

Country Link
CN (1) CN203362182U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111396099A (en) * 2020-03-30 2020-07-10 中交第二航务工程局有限公司 Water seepage prevention construction method for two-lining connecting joint in tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111396099A (en) * 2020-03-30 2020-07-10 中交第二航务工程局有限公司 Water seepage prevention construction method for two-lining connecting joint in tunnel
CN111396099B (en) * 2020-03-30 2021-06-11 中交第二航务工程局有限公司 Water seepage prevention construction method for two-lining connecting joint in tunnel

Similar Documents

Publication Publication Date Title
CN105041337B (en) The seam splicing construction and waterproof method of a kind of Tunnel Boring tunnel lining segment
CN203809018U (en) Sucking disc device for construction of waterproof board
CN106593465B (en) A kind of structure and construction method improving tunnel-liner antidetonation shock attenuation ability
CN103669292A (en) Concrete joint water stop structure and construction method thereof
CN203200792U (en) Waterproof structure for construction joint of basement concrete wall
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN101787892A (en) Method for constructing maintainable tunnel waterproof system
CN202039387U (en) Epoxy resin pile head waterproof sealing and secondary-grouting leaking stoppage structure
CN204551548U (en) Rubber and plastic self-adhering-type waterstop
CN103628895A (en) Large-deformation ground fissure section tunnel lining joint structure and construction method thereof
CN203939010U (en) A kind of steel limit self-adhering rubber waterstop
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN203684167U (en) Concrete joint waterstop device
JP4108460B2 (en) Construction method of tunnel still water structure
CN203362182U (en) Tunnel waterproof board fixing and lap-jointing structure
CN103835379A (en) Combined water stop system of waterproof concrete wall
CN203614112U (en) Tunnel lining joint structure of large deformation ground fissure section
CN105780940A (en) Building expansion joint anti-seeping structure
CN104060576B (en) Concrete for hydraulic structure member expansion joint waterstop repairs attachment structure and method for repairing and connecting
CN203960811U (en) Concrete for hydraulic structure member expansion joint waterstop syndeton
CN203716116U (en) Pulp stopping structure used in diversion tunnel concrete end plug vault backfill grouting
CN204982977U (en) Basement bottom plate and waterproofing membrane integration waterproof construction
CN202644587U (en) Subway station main body structure plate deformation gap water-proof structure
CN204386625U (en) A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20140723

EXPY Termination of patent right or utility model