CN203356587U - Casting furnace - Google Patents
Casting furnace Download PDFInfo
- Publication number
- CN203356587U CN203356587U CN 201320455832 CN201320455832U CN203356587U CN 203356587 U CN203356587 U CN 203356587U CN 201320455832 CN201320455832 CN 201320455832 CN 201320455832 U CN201320455832 U CN 201320455832U CN 203356587 U CN203356587 U CN 203356587U
- Authority
- CN
- China
- Prior art keywords
- stalk
- heater
- molten metal
- furnace
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a casting furnace, comprising a furnace body, a furnace opening formed in the furnace body and a riser tube arranged in the furnace opening, wherein the riser tube is communicated with a casting mold and is divided into a riser tube upper part and a riser tube lower part by the furnace opening; the riser tube upper part is arranged outside the furnace body, the riser tube lower part is arranged in the furnace opening; when the riser tube upper part is filled with molten metal, the freezing rate of the molten metal is smaller than the freezing rate of the slowest freezing part of the molten metal in the casting mold. The feeding capacity of the casting furnace is strong and the casting yield of the casting furnace is high.
Description
Technical field
The utility model relates to a kind of Casting Equipment field, specifically a kind of foundry furnace.
Background technology
At present, low pressure casting method extensively applies in casting field, is existing Casting Equipment as shown in Figure 1, Figure 2, comprises body of heater 301, and body of heater 301 is provided with fire door 311, and fire door 311 is provided with stalk 100, and molten metal 401 is arranged in body of heater 301.When being cast, stalk 100 upper ends connect casting mould (not shown), from the interior pressurization of body of heater 301, molten metal 401 are passed in casting mould by stalk 100, then carry out cooling.
In casting process, stalk 100 inner metal liquids 401 are often cooling very soon, and the molten metal 401 in casting mould can produce contraction while solidifying, and when the cooling velocity of stalk 100 inner metal liquids 401 is too fast, feeding well will occur, and the generation casting is bad.
The utility model content
For the deficiencies in the prior art, the purpose of this utility model is to provide a kind of foundry furnace, and this foundry furnace, when being cast, is produced yield high.
For realizing above-mentioned utility model purpose, the technological means that the utility model adopts is as follows: a kind of foundry furnace, comprise body of heater, be arranged on the fire door on this body of heater, be arranged on the stalk in this fire door, this stalk is communicated with casting mould, this stalk be take this fire door and is divided into stalk top and stalk bottom as boundary, this stalk top is outside this body of heater, this stalk bottom is in this body of heater, this stalk upper tube inner capacities meets the following conditions: when this stalk top is full of molten metal, the setting rate of the molten metal in this stalk top is less than in this casting mould the slow hardening of this molten metal setting rate of part admittedly.
Preferably, the average diameter in above-mentioned stalk upper tube is greater than the average diameter in this stalk lower tube.This stalk bottom is normal size, and the average diameter in this stalk upper tube is greater than the average diameter in this stalk lower tube, can make stalk upper tube inner capacities increase, with the setting rate of this stalk upper tube inner metal liquid that slows down.
Preferably, above-mentioned stalk top is shaped as cylindrical tube, conical pipe or bird-caging pipe.
Preferably, the material of above-mentioned stalk is steel or pottery etc.
Preferably, above-mentioned stalk top and this stalk bottom intersection are provided with ,Gai stopper section, stopper section and are stuck in this fire door place.
Above-mentioned foundry furnace, due to the capacity increased in the stalk upper tube, while making to cast, the setting rate of stalk upper metal liquid is slower than the setting rate that the casting mould inner metal liquid solidifies slow component, before having guaranteed that the casting mould inner metal liquid solidifies fully, can obtain supplementing of molten metal by stalk always, make to cast yield and be effectively improved.
The accompanying drawing explanation
Fig. 1 is the cutaway view of the stalk 100 of the utility model prior art foundry furnace;
Fig. 2 is the partial sectional view of the utility model prior art foundry furnace;
Fig. 3 is the cutaway view of the stalk 200 of the utility model embodiment foundry furnace;
Fig. 4 is the partial sectional view of the utility model embodiment foundry furnace;
Fig. 5 is the stalk cutaway view of the utility model embodiment foundry furnace.
The specific embodiment
As requested, will disclose the specific embodiment of the present utility model here.Yet, should be understood that, disclosed embodiment is only exemplary of the present utility model here, it can be presented as various forms.Therefore, here the detail disclosed is not considered to restrictive, and be only as the basis of claim and as for instructing those skilled in the art differently to apply representational basis of the present utility model in any appropriate mode of reality, comprise employing disclosed various features in conjunction with the feature that may clearly not disclose here here.
As shown in Figure 3, Figure 4, be the cutaway view of the stalk 200 of the utility model embodiment foundry furnace and the partial sectional view of the utility model embodiment foundry furnace.The foundry furnace of the present embodiment comprises: body of heater 302, be arranged on fire door 312 on body of heater 302, be arranged on the stalk 200 in fire door 312, stalk 200 is communicated with casting mould (not shown), stalk 200 be take fire door 312 and is divided into stalk top 211 and stalk bottom 221 as boundary, stalk top 211 is outside body of heater 302, and stalk bottom 221 is within body of heater 302.Stalk top 211 and stalk bottom 221 intersections are provided with stopper section 231, and stalk top 211 is stuck in to fire door 312 places.Stalk top 211 pipe interior diameter D1 are 150mm, and stalk bottom 221 pipe interior diameter D2 are 100mm.Molten metal 402 is arranged in body of heater 302, when being cast, in the interior pressurization of body of heater 302, molten metal 402 is injected in casting mould along stalk 200, then carry out cooling, body of heater 302 continues to carry out supplementing of molten metal 402 by 200 pairs of casting moulds of stalk simultaneously, bad to prevent feeding.
As table 1, under the same conditions, the identical flange of casting size shape, the experimental data of the foundry furnace cast flange of the foundry furnace of the present embodiment and prior art.
Z | D/mm | t1/s | t2/s | n1 | n2 | n2/n1×100% |
1 | 100 | 2000 | 1600 | 6 | 6 | 100% |
2 | 100 | 2000 | 1600 | 9 | 9 | 100% |
3 | 150 | 2000 | 2500 | 2 | 1 | 50% |
4 | 150 | 2000 | 2500 | 22 | 11 | 50% |
5 | 150 | 2000 | 2500 | 46 | 5 | 10.9% |
Table 1
Wherein, Z means to test group, and table 1 has been enumerated 5 groups of experimental datas altogether.D means the diameter on stalk 100 or stalk top 211, and unit is millimeter.T1 means that this experiment when casting casting mould inner metal liquid 401 or molten metal 402 solidify the average setting time of slow component, and unit be second.T2 is illustrated in the outer stalk inner metal liquid 401 of body of heater or the average setting time of molten metal 402, and unit is second.In this experiment, molten metal 401 and molten metal 402 are identical aluminium liquid.N1 means the flange sum of this group experiment casting.N2 means the quantity that flange that the experiment of this group is cast need to be reprocessed.N2/n1 * 100% means repair rate.
As experimental data cited in table 1, this experiment is the identical flange of casting size shape under identical external condition, has carried out altogether 5 groups of experiments.Recording in advance the average setting time that this casting mould inner metal liquid solidifies slow component in experiment is 2000s.Wherein test the foundry furnaces of using prior art for the 1st, 2 groups, wherein the diameter of stalk 100 is 100mm, the foundry furnace of the utility model embodiment for the experiment of 3-5 group, and wherein the diameter D1 on stalk top 211 is 150mm.In experiment, record in the 1st, 2 groups of experiments, the average setting time of stalk 100 inner metal liquids 401 outside body of heater 301 is 1600s; In experiment, record in the experiment of 3-5 group, the average setting time of stalk top 211 inner metal liquids 402 is 2500s.Experimental result: 1st, cast respectively 6 and 9 flanges for 2 groups, wherein all produced feeding bad, both all needed to be reprocessed, repair rate reaches 100%; And the 3-5 group has been cast respectively 2,22 and 46 flanges, wherein the 3rd, 4 groups of repair rates are 50%, due to cause influences such as casting experience, numbers of samples, make the 5th group of repair rate reach 10.9%.This experimental results show that: stalk 100 diameters when stalk top 211 with respect to prior art increase, stalk top 211 inner capacities are increased, be greater than the slow hardening of casting mould inner metal liquid 402 admittedly during the average setting rate of part to reach the stalk top average setting time of 211 inner metal liquid 402, during cast flange, the feeding capacity of foundry furnace is good, the repair rate of the flange of casting is low, and the flange yield of casting is high.
As shown in Figure 5, be the stalk cutaway view of the utility model embodiment foundry furnace.Stalk in figure is shaped as the situation of change of the present embodiment stalk 200.Both stalk 200 shapes of the present embodiment can be thinkable other shapes of taper, bird-caging and this area staff.
The foundry furnace of the present embodiment, by increasing the average diameter on stalk top 211, make the capacity of stalk top 211 inner metal liquids 402, and then the setting rate that makes stalk top 211 inner metal liquids 402 is slower than the slow hardening of molten metal in casting mould 402 setting rate of part admittedly, before having guaranteed that the casting mould inner metal liquid solidifies fully, can obtain supplementing of molten metal 402 by stalk 200 always, effectively improve the feeding capacity of foundry furnace, make to cast yield and obviously improve.
Technology contents of the present utility model and technical characterstic have disclosed as above; yet be appreciated that; under creative ideas of the present utility model; those skilled in the art can make various changes and improve said structure and material; comprise here and to disclose separately or the combination of claimed technical characterictic, comprise significantly other combination of these features.These distortion and/or combination all fall in the related technical field of the utility model, and fall into the protection domain of the utility model claim.
Claims (5)
1. a foundry furnace, comprise body of heater, be arranged on the fire door on described body of heater, be arranged on the stalk in described fire door, described stalk is communicated with casting mould, it is characterized in that: described stalk be take described fire door and is divided into stalk top and stalk bottom as boundary, described stalk top is outside described body of heater, described stalk bottom is positioned at described body of heater, described stalk upper tube inner capacities meets the following conditions: when described stalk top is full of molten metal, the setting rate of the molten metal in described stalk top is less than in described casting mould the slow hardening of the described molten metal setting rate of part admittedly.
2. foundry furnace as claimed in claim 1 is characterized in that: the average diameter in described stalk upper tube is greater than the average diameter in described stalk lower tube.
3. foundry furnace as claimed in claim 1 is characterized in that: described stalk top be shaped as cylindrical tube or conical pipe or bird-caging pipe.
4. foundry furnace as claimed in claim 1, it is characterized in that: the material of described stalk is steel or pottery.
5. foundry furnace as claimed in claim 1, it is characterized in that: described stalk top and described stalk bottom intersection are provided with stopper section, and described stopper section is stuck in described fire door place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320455832 CN203356587U (en) | 2013-07-26 | 2013-07-26 | Casting furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320455832 CN203356587U (en) | 2013-07-26 | 2013-07-26 | Casting furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203356587U true CN203356587U (en) | 2013-12-25 |
Family
ID=49804409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320455832 Expired - Lifetime CN203356587U (en) | 2013-07-26 | 2013-07-26 | Casting furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203356587U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103406529A (en) * | 2013-07-26 | 2013-11-27 | 江苏神马电力股份有限公司 | Foundry furnace |
CN104493136A (en) * | 2014-11-25 | 2015-04-08 | 柳州金特机械有限公司 | Foundry furnace |
-
2013
- 2013-07-26 CN CN 201320455832 patent/CN203356587U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103406529A (en) * | 2013-07-26 | 2013-11-27 | 江苏神马电力股份有限公司 | Foundry furnace |
CN104493136A (en) * | 2014-11-25 | 2015-04-08 | 柳州金特机械有限公司 | Foundry furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104128567A (en) | Brake disc body and casting method and device for manufacturing same | |
CN102319891B (en) | Gating system capable of effectively controlling air entrainment and slag entrainment and design method thereof | |
CN204052857U (en) | A kind of aircraft cabin body vertical slitting gate system | |
CN204209071U (en) | A kind of brake disc disk body and casting device thereof | |
CN105328127A (en) | Open type top shower gating system for air cylinder cover | |
CN104827000B (en) | A kind of casting method of gear ring | |
CN203356587U (en) | Casting furnace | |
CN106077494A (en) | A kind of pouring procedure casting VHP main beating cap | |
CN104174819A (en) | Casting technology for three-stage planetary frame of ocean platform climbing machine | |
CN203565812U (en) | Tundish flow stabilizer | |
CN110918923B (en) | Casting process of sequential directional solidification double-layer conical shell structure casting | |
CN105269766A (en) | Mold gate for pouring insulating cylinder | |
CN107876736A (en) | Counter-pressure casting pouring gate structure and the casting counter-pressure casting method with the pouring gate structure | |
CN103406529A (en) | Foundry furnace | |
CN103658629B (en) | Molten steel Argon pouring procedure | |
CN204396816U (en) | A kind of quick change cold burden frame | |
CN206104816U (en) | Edulcoration the gating system | |
CN103990762A (en) | Casting device specially used for annular long casting part | |
CN103611893B (en) | A kind of method and device thereof of filling ingot mold air gap | |
CN204700292U (en) | The submersed nozzle of large discharge current stabilization speed | |
CN104874741B (en) | A kind of metallic magnesium refining pot manufacturing process | |
CN207188742U (en) | Casting mold for casting | |
CN206316323U (en) | Trapezoidal apparatus for pouring | |
CN206509482U (en) | High-performance dish valve casting | |
CN203843108U (en) | Pouring equipment special for annular long casting part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20131225 |
|
CX01 | Expiry of patent term |