CN203349255U - Gas boiler blow-off pipe - Google Patents

Gas boiler blow-off pipe Download PDF

Info

Publication number
CN203349255U
CN203349255U CN 201320377424 CN201320377424U CN203349255U CN 203349255 U CN203349255 U CN 203349255U CN 201320377424 CN201320377424 CN 201320377424 CN 201320377424 U CN201320377424 U CN 201320377424U CN 203349255 U CN203349255 U CN 203349255U
Authority
CN
China
Prior art keywords
gas
blow
pipeline
drainage pipeline
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320377424
Other languages
Chinese (zh)
Inventor
梁新民
郭贵亭
李刚
韩小伟
相里军旗
李华
段晶
张丽君
郭晓茹
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI HUAFU NEW ENERGY CO Ltd
Original Assignee
SHAAN STEEL GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAAN STEEL GROUP CO Ltd filed Critical SHAAN STEEL GROUP CO Ltd
Priority to CN 201320377424 priority Critical patent/CN203349255U/en
Application granted granted Critical
Publication of CN203349255U publication Critical patent/CN203349255U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a gas boiler blow-off pipe which comprises a gas vertical pipe. The lower end of the gas vertical pipe is divided into two paths, one path is a drainage pipeline, the other path is a blow-off pipeline, and a plug board is fixed at the lower end of the blow-off pipeline. Due to the arrangement of the drainage pipeline and the blow-off pipeline, smooth accumulated water draining is facilitated, stability and safety of boiler gas combustion are guaranteed, and the phenomenon that in the prior art, the pipelines and valves are blocked because gas contains a great number of impurities and settlings is avoided. The plug board is fixed at the lower end of the blow-off pipeline and ensures the effect that gas leakage is cut off reliably, and moreover the plug board is opened for blow-off when a boiler is shut down.

Description

A kind of gas boiler blow-off pipe
Technical field
The utility model relates to a kind of blow-off pipe, is specifically related to a kind of gas boiler blow-off pipe.
Background technology
Existing boiler coal gas blowdown, draining share a blow-off line, owing to containing a large amount of impurity and deposit in coal gas, cause coal gas blowdown, drainage pipeline, valve place often to stop up.Cause large quantity of moisture in coal gas to enter burner hearth or a large amount of impurity and deposit obstruction gas piping, cause gas regulator on pipeline, motor-driven valve, fast valve or manually operated door dust stratification serious, can't normal operating, affect unstability and the security of boiler coal gas burning.
The utility model content
The purpose of this utility model is to provide a kind of gas boiler blow-off pipe, and it is blowdown smoothly, can not stop up valve and pipeline.
For achieving the above object, the utility model adopts following technical scheme:
The utility model comprises gas riser, and described gas riser lower end is divided into two-way, and a road is drainage pipeline, and a road is blow-off line, and the blow-off line lower end is fixed with closure plate.
Described drainage pipeline is arranged at the below of one deck gas-fired arm of gas boiler.
Described blow-off line is arranged at the pipeline contraction place of gas riser below and is positioned at the below of drainage pipeline.
The described drainage pipeline other end causes water seal for coal gas.
Described drainage pipeline is provided with valve,
With respect to prior art, the beneficial effect the utlity model has: the utility model is by arranging two pipelines, a blow-off line, a drainage pipeline, being conducive to like this ponding discharges smoothly, guaranteed stability and the security of boiler combustion coal gas, avoided in prior art owing to containing a large amount of impurity and deposit in coal gas, thus the phenomenon of blocking pipe and valve; The blow-off line lower end is fixed with closure plate, ensures that reliably blocking coal gas leaks, and open closure plate with blowdown when blowing out.
Further, the below of one deck gas-fired arm of gas boiler arranges drainage pipeline, is beneficial to ponding and discharges, avoided because draining is unfavorable, causing winter ignition of the boiler point not icing, the seeping phenomenon of phenomenon or one deck gas-fired arm burner, pipeline.
Higher than the blow-off line arrangement principle, drainage pipeline is installed on to one deck gas-fired arm below according to drainage pipeline, is conducive to ponding and flows out by drainage pipeline.
Drainage pipeline causes water seal for coal gas, the moisture contained in coal gas can be caused to water seal for coal gas by drainage pipe, guarantees gas-fired stability, has avoided the de-fire of gas-fired, interrupted Ignition Phenomena.
The accompanying drawing explanation
Fig. 1 is existing gas boiler blow-off pipe schematic diagram;
Fig. 2 is the utility model structural representation.
Wherein, 1 is one deck gas-fired arm; 2 is two layers of gas-fired arm; 3 is three layers of gas-fired arm; 4 is gas riser; 5 is closure plate; 6 is blow-off line; 7 is drainage pipeline.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further details.
Referring to Fig. 2, the utility model comprises gas riser 4, and gas riser 4 is communicated with three layers of gas-fired arm 3 from top to bottom successively, secondary gas-fired arm 2, one deck burning arm 1, gas riser 4 lower ends are divided into two-way, one tunnel is drainage pipeline 7, and drainage pipeline 7 is provided with valve; One tunnel is blow-off line 6, and pipeline contraction place and blow-off line 6 lower ends that blow-off line 6 is arranged at gas riser below are fixed with closure plate 5, to ensure that reliably blocking coal gas leaks, opens closure plate 5 with blowdown when blowing out.According to drainage pipeline 7 higher than blow-off line 6 arrangement principle, drainage pipeline 7 is installed on to one deck gas-fired arm below 1, be conducive to ponding and flow out by drainage pipeline 7, avoided because draining is unfavorable, causing winter ignition of the boiler point not icing, the seeping phenomenon of phenomenon or one deck gas-fired arm 1 burner, pipeline.Coal gas drainage pipeline 7 causes water seal for coal gas, to guarantee that reliably blocking coal gas leaks, has guaranteed gas-fired stability, has avoided the de-fire of gas-fired, interrupted Ignition Phenomena.Consider that northern area winter severe cold coal gas drainage pipeline freezes, the coal gas drainage pipe causes water seal for coal gas, can be incubated the coal gas drainage pipeline.
Referring to Fig. 1, in the blow-off pipe of prior art, gas riser 4 one sides set gradually three layers of gas-fired arm 3 from the top down, secondary gas-fired arm 2, one deck burning arm 1, a pipe sewage draining passage is set in the lower end of gas riser 4, be unfavorable for like this blowdown, easily cause the obstruction of blow-off line and valve, affect unstability and the security of boiler coal gas burning.With respect to the blow-off line of prior art, the utility model arranges a blow-off line and a drainage pipeline, and draining and blowdown are smooth, have guaranteed stability and the security of gas boiler.

Claims (5)

1. a gas boiler blow-off pipe, is characterized in that, comprises gas riser, and described gas riser (4) lower end is divided into two-way, and a road is drainage pipeline (7), and a road is blow-off line (6), and blow-off line (6) lower end is fixed with closure plate (5).
2. a kind of gas boiler blow-off pipe according to claim 1, is characterized in that, described drainage pipeline (7) is arranged at the below of one deck gas-fired arm (1) of gas boiler.
3. a kind of gas boiler blow-off pipe according to claim 1, is characterized in that, described blow-off line (6) is arranged at the pipeline contraction place of gas riser (4) below and is positioned at the below of drainage pipeline (7).
4. a kind of gas boiler blow-off pipe according to claim 1, is characterized in that, described drainage pipeline (7) other end causes water seal for coal gas.
5. a kind of gas boiler blow-off pipe according to claim 1, is characterized in that, described drainage pipeline (7) is provided with valve.
CN 201320377424 2013-06-27 2013-06-27 Gas boiler blow-off pipe Expired - Lifetime CN203349255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320377424 CN203349255U (en) 2013-06-27 2013-06-27 Gas boiler blow-off pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320377424 CN203349255U (en) 2013-06-27 2013-06-27 Gas boiler blow-off pipe

Publications (1)

Publication Number Publication Date
CN203349255U true CN203349255U (en) 2013-12-18

Family

ID=49749152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320377424 Expired - Lifetime CN203349255U (en) 2013-06-27 2013-06-27 Gas boiler blow-off pipe

Country Status (1)

Country Link
CN (1) CN203349255U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143725A (en) * 2017-07-20 2017-09-08 山东钢铁集团日照有限公司 A kind of equipment for reducing gas piping and valve erosion
CN109028013A (en) * 2018-07-18 2018-12-18 淮阴工学院 Steam generator blowdown device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143725A (en) * 2017-07-20 2017-09-08 山东钢铁集团日照有限公司 A kind of equipment for reducing gas piping and valve erosion
CN109028013A (en) * 2018-07-18 2018-12-18 淮阴工学院 Steam generator blowdown device

Similar Documents

Publication Publication Date Title
CN203349255U (en) Gas boiler blow-off pipe
CN203628280U (en) Natural gas vent device
CN209742963U (en) Self-weight slag and water discharging device
CN203561095U (en) Anti-freezing system of solar water heater
CN200993026Y (en) Coal mine underground explosion-suppression water trough level fully-automatic supply device
CN207583427U (en) Gas discharge in mine negative pressure automatic drainage device
CN204570877U (en) A kind of automatic water replenishing type trapped well
CN201588292U (en) Isolation device of water drain pipes in oil tank area
CN205535896U (en) Flue gas liquid seal device based on S type pipeline
CN207130858U (en) Vaporization prevention integrated water is shunt in a well
CN204491723U (en) A kind of building water system
CN205402247U (en) That takes gaseous sustained -release devices prevents letting out coal leaking gas drainer
CN202747666U (en) Water inlet and outlet device of solar water heater
CN205000413U (en) Multisource water supply pressure boost fire water tank system
CN202769276U (en) Gas hemispheric water-sealed valve device with safe high-level water tank
CN203561094U (en) Anti-freezing system of solar water heater
CN203657249U (en) Solar water heater water in-out pipe anti-freezing anti-blocking device
CN203963985U (en) Liquid fuel safe storage
CN202469477U (en) Coke oven gas and torch safety system
CN215636577U (en) Pipeline gas water seal and condensate water discharge device
CN203023802U (en) Pressure regulating tank for slurry pipeline
CN103924633A (en) Adjusting water tank
CN201359198Y (en) Overpressure self-closing gas drainer
CN2883870Y (en) Auto controller of low pressure gas storage tank
CN101029708A (en) Solar diverter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170821

Address after: 715405 Longmen Town, Hancheng, Shaanxi

Patentee after: SHAANXI HUAFU NEW ENERGY Co.,Ltd.

Address before: 710018 No. 5, North Second Ring Road, Xi'an, Shaanxi

Patentee before: SHAANXI IRON AND STEEL (GROUP) Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131218