CN203339593U - Pre-embedded distribution box - Google Patents

Pre-embedded distribution box Download PDF

Info

Publication number
CN203339593U
CN203339593U CN2013203105881U CN201320310588U CN203339593U CN 203339593 U CN203339593 U CN 203339593U CN 2013203105881 U CN2013203105881 U CN 2013203105881U CN 201320310588 U CN201320310588 U CN 201320310588U CN 203339593 U CN203339593 U CN 203339593U
Authority
CN
China
Prior art keywords
distribution box
box body
strip gab
buckle
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203105881U
Other languages
Chinese (zh)
Inventor
徐仁贵
牛寿鸿
张国强
唐杰林
张学利
牛树明
赵政卫
占财兴
张卫国
戴毅
黄志平
梅宁
杨乐
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG DAXIN ENINEERING CO Ltd
Nantong Daxin Engineering Co Ltd
Original Assignee
NANTONG DAXIN ENINEERING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG DAXIN ENINEERING CO Ltd filed Critical NANTONG DAXIN ENINEERING CO Ltd
Priority to CN2013203105881U priority Critical patent/CN203339593U/en
Application granted granted Critical
Publication of CN203339593U publication Critical patent/CN203339593U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connection Or Junction Boxes (AREA)

Abstract

The utility model relates to a pre-embedded distribution box for construction. The present pre-embedded distribution box is easy to generate deformation and other problems, to overcome the disadvantages in the prior art, the utility model brings forward a pre-embedded distribution box. To solve the technology problems in the prior art, the technology scheme is employed as follows: the pre-embedded distribution box comprises a distribution box body (1) and a pinch plate (2), the distribution box body (1) is provided with a connection sheet (3) for connecting the pinch plate (2), and the connection sheet (3) is fixedly connected with the distribution box body (1); and the pre-embedded distribution box is characterized in that an X-shaped bracing frame (4) is arranged in the distribution box body (1), and four end points of the X-shaped bracing frame (4) respectively support four ribs in the distribution box body (1). The beneficial effects are provided as follows: deformation is not easy to happen, arrangement is easy, and the pinch plate is easy to connect the distribution box.

Description

Pre-buried distribution box
Technical field
The utility model relates to a kind of pre-buried distribution box for building, especially prevents distortion, easy-to-install pre-buried distribution box.
Background technology
When pre-buried distribution box refers to construction, pre-buried distribution box in wall or concrete.Existing distribution box has the following disadvantages: 1, and under concrete extruding, easily deformable.2, be difficult for being adjusted into the position of " smooth vertical and horizontal " while laying, namely tilt to install.3, also porose on the brace of porose on buckle, distribution box, still, owing to processing the reasons such as coarse, these two holes are usually to not going up, to such an extent as to can't, with connecting rod through these two holes, cause the connection appearance of buckle and distribution box unsafe, seal imperfect problem.
The utility model content
In order to solve the deficiencies in the prior art, the utility model proposes a kind of not yielding, be easy to lay, be easy to the pre-buried distribution box that allows buckle be connected with distribution box.
The utility model solves the technical scheme that its technical problem adopts: pre-buried distribution box, comprise that distribution box body, buckle and distribution box body are useful on the brace that connects buckle, and brace with the distribution box body for being fixedly connected with, it is characterized in that: the X-shaped bracing frame is arranged in the distribution box body, and four end points of X-shaped bracing frame support respectively intrinsic four ribs of distribution box.
The utility model can also be: described X-shaped bracing frame is to utilize screw rod to be formed by connecting by support end and support bar.
The utility model can also comprise L shaped support chip, and L shaped support chip is closely clamped by X-shaped bracing frame and the intrinsic rib of distribution box.
The utility model can also comprise on distribution box body vertical inner wall the weight hung, and also comprises the weight line that hangs weight, and the other end of weight line is fixedly connected with the inwall of distribution box body.
The utility model can also comprise: when the bottom surface at the weight line in vertical position and distribution box body is horizontal, and a point-like mark under the weight line, the distribution box inner body wall.
The utility model can also comprise be convenient to connecting rod through, the first strip gab and the second strip gab for connecting brace and buckle, and brace has the first strip gab, buckle has the second strip gab, and: the first strip gab is vertical with the second corresponding strip gab.
The beneficial effects of the utility model are not: yielding, be easy to lay, be easy to allow buckle be connected with distribution box.
The accompanying drawing explanation
The partial structurtes schematic diagram that Fig. 1 is the utility model embodiment mono-.
The partial elevation view that Fig. 2 is the utility model embodiment mono-.
The structural representation that Fig. 3 is the utility model embodiment bis-.
The partial elevation view that Fig. 4 is the utility model embodiment tri-.
The partial elevation view that Fig. 5 is the utility model embodiment tetra-.
The partial elevation view that Fig. 6 is the utility model embodiment five.
Fig. 7 is the utility model prior art partial structurtes schematic diagrames.
Fig. 8 is the utility model prior art partial structurtes schematic diagrames.
The partial structurtes schematic diagram that Fig. 9 is the utility model embodiment six.
The partial structurtes schematic diagram that Figure 10 is the utility model embodiment six.
The mounting structure schematic diagram that Figure 11 is the utility model embodiment six.
The partial structurtes schematic diagram that Figure 12 is the utility model embodiment seven.
1-distribution box body in figure, 2-buckle, 21-the second strip gab, 3-brace, 31-the first strip gab, 4-X shape bracing frame, 41-support end, 42-support bar, 43-screw rod, 6-weight line, 61-weight, 63-horizontal line, 7-point-like mark, 8-L shape support chip.
Embodiment
Below in conjunction with accompanying drawing, design and use of the present utility model are further illustrated.
Embodiment mono-:
Referring to accompanying drawing 1 and accompanying drawing 2, because embodiment mono-does not relate to the improvement to buckle 2 and brace 3, for making accompanying drawing, to be convenient to understand, these two accompanying drawings all do not draw buckle 2 and brace 3, only draw distribution box body 1 and X-shaped bracing frame.The utility model comprises distribution box body 1, and in distribution box body 1, X-shaped bracing frame 4 is arranged, and four end points of X-shaped bracing frame 4 support respectively four ribs in distribution box body 1.
Owing to there being the X-shaped bracing frame to support, so such design can be strengthened the intensity of distribution box body 1, so that, after the concrete compressing, the distribution box body is not yielding.
Embodiment bis-:
X-shaped bracing frame 4 is filled in the inner strength that need to be very large of distribution box body 1, and taking-up afterwards is also pretty troublesome, for this reason, can do further improvement to X-shaped bracing frame 4.
Referring to accompanying drawing 3, accompanying drawing 3 has showed the structure of X-shaped bracing frame 4.X-shaped bracing frame 4 is to utilize screw rod 43 to be formed by connecting by support end 41 and support bar 42.When need to put into, put into piecemeal, after determining position, with screw rod 43, be fixedly connected with support end 41 and support bar 42.
When taking out X-shaped bracing frame 4, take off screw rod 43, take out piecemeal support end 41 and support bar 42, just can take X-shaped bracing frame 4 fully away.
That is to say, embodiment bis-is intended to make X-shaped bracing frame 4 disassembled.
Embodiment tri-:
The sheet material of manufacturing distribution box body 1 is insufficient strength sometimes, causes the position of distribution box body 1 outside X-shaped bracing frame 4 strong points to deform.For this reason, need further to strengthen the effect supported.
Referring to accompanying drawing 4.
Accompanying drawing 4 explanations, the utility model can also comprise L shaped support chip 8, and L shaped support chip 8 is closely clamped by the rib in X-shaped bracing frame 4 and distribution box body 1.
Because L shaped support chip 8 has larger Area of bearing, so, further strengthened support effect.
Embodiment tetra-:
Usually lay the problem of inclination in order to solve pre-buried distribution box, referring to accompanying drawing 5.For making the outstanding improvements of accompanying drawing 5, accompanying drawing 5 only draws the utility model part.
Embodiment tetra-has showed: the utility model also comprises on distribution box body vertical inner wall the weight 61 hung, and also comprises the weight line 6 that hangs weight 61, and the other end of weight line 6 is fixedly connected with the inwall of distribution box body 1.
Weight 61, weight line 6 have been arranged, and the personnel that pre-buried distribution box is installed are easy to judge whether tilt to install, and this is the understandable technical scheme of various equivalent modifications.
Embodiment five:
In order to be easier to determine whether installation tilts, referring to accompanying drawing 6, when the utility model can also be included in the bottom surface of weight line 6 in vertical position and distribution box body 1 and is horizontal, a point-like mark 7 under weight line 6, distribution box body 1 inwall.
When the bottom surface of distribution box body 1 is horizontal, the bottom surface of weight line 6 and distribution box body 1 is exactly vertical.
In other words: in the time of installation, as long as allow under weight 61, face point-like mark 7, just can guarantee that the bottom surface of distribution box body 1 is horizontal.
It should be noted that: the scale of product surface is a kind of structure, and no matter scale is concavo-convex or plane, is all the technical schemes about the structure of product, belongs to the object of utility model protection.In embodiment five, point-like mark 7 plays the effect of scale, if weight 61 depart from point-like mark 7 directly over, according to situation about departing from, just can understand the degree of inclination and the direction of inclination.In other words, only have the top of weight 61 in this scale (namely the point-like mark 7), be only qualified installation.Point-like mark 7 has played the effect that solves technical problem.So point-like mark 7 is objects of utility model protection.
Embodiment six:
Accompanying drawing 7 and accompanying drawing 8 are prior aries of the present utility model, and accompanying drawing 8 is structural representations of buckle 2.Distribution box body 1 is useful on the brace 3 that connects buckle 2, and brace 3,, covers buckle 2 on distribution box body 1 in the time of use for being fixedly connected with distribution box body 1, allow the hole on brace 3 aim at the hole on buckle, through connecting rod to connect buckle 2 and distribution box body 1.
Owing to processing the reasons such as coarse, these two groups of holes are usually to not going up, to such an extent as to can't, with connecting rod through these two groups of holes, cause the connection appearance of buckle 2 and distribution box body 1 unsafe, seal imperfect problem.
For this reason, need to improve syndeton.
Referring to accompanying drawing 9 and accompanying drawing 10, accompanying drawing 9 has showed brace 3 strip gab, and the strip gab that is arranged in brace 3 is named as the first strip gab 31 at the utility model.Accompanying drawing 10 has showed buckle 2 also strip gab, and this strip gab is named as the second strip gab 21 in the utility model.
Referring to accompanying drawing 11, accompanying drawing 11 is buckle and the structural representation of distribution box body under installment state.The utility model the first strip gab 31 is vertical with the second corresponding strip gab 21.Such design, make these four need to all be easy to through the hole of connecting rod alignment.Thereby solved buckle and be connected defective tightness, safe not problem with the distribution box body.
Embodiment seven:
Referring to accompanying drawing 12, the front view that accompanying drawing 12 is this distribution box body 1, this accompanying drawing has omitted buckle, so this accompanying drawing is called as partial structurtes schematic diagram of the present utility model.For installation personnel being easy to judge whether to install whether level of distribution box, can draw a horizontal line 63 on the inwall of distribution box body 1, the installer utilizes the angular relationship of weight line 6 and horizontal line 63, easily judges installation situation.
Also it should be noted that: various equivalent modifications should be known, and the utility model also comprises the hole that allows electric wire pass.This is prior art, again because improvement of the present utility model does not relate to the hole that allows electric wire pass, so, the accompanying drawing hole that all abridged allows electric wire pass.
Also it should be noted that: buckle 2 is also referred to as cover plate, and it is the plate for closed distributing box, and it is the part of distribution box, so, to the improvement of buckle, belong to the improvement to distribution box.
Also it should be noted that: because buckle 2 is parts of distribution box, so the accompanying drawing of omission distribution box body 1 or omission buckle 2, all be called as Local map of the present utility model.
The utility model is for pre-buried distribution box provides a kind of new technical scheme, the utlity model has not yielding, be easy to lay, be easy to the beneficial effect that allows buckle be connected with distribution box.

Claims (10)

1. pre-buried distribution box, comprise that distribution box body (1), buckle (2) and distribution box body (1) are useful on the brace (3) that connects buckle (2), and brace (3) with distribution box body (1) for being fixedly connected with, it is characterized in that: X-shaped bracing frame (4) is arranged in distribution box body (1), and four end points of X-shaped bracing frame (4) support respectively four ribs in distribution box body (1).
2. pre-buried distribution box as claimed in claim 1, it is characterized in that: described X-shaped bracing frame (4) is to utilize screw rod (43) to be formed by connecting by support end (41) and support bar (42).
3. pre-buried distribution box as claimed in claim 1 or 2, is characterized in that: also comprise L shaped support chip (8), and L shaped support chip (8) is closely clamped by the rib in X-shaped bracing frame (4) and distribution box body (1).
4. pre-buried distribution box as claimed in claim 1 or 2, it is characterized in that: also comprise the weight (61) hung on distribution box body (1) vertical inner wall, also comprise the weight line (6) that hangs weight (61), the other end of weight line (6) is fixedly connected with the inwall of distribution box body (1).
5. pre-buried distribution box as claimed in claim 3, it is characterized in that: also comprise the weight (61) hung on distribution box body (1) vertical inner wall, also comprise the weight line (6) that hangs weight (61), the other end of weight line (6) is fixedly connected with the inwall of distribution box body (1).
6. pre-buried distribution box as claimed in claim 4, it is characterized in that: when also being included in the bottom surface of weight line (6) in vertical position and distribution box body (1) and being horizontal, a point-like mark (7) under weight line (6), distribution box body (1) inwall.
7. pre-buried distribution box as claimed in claim 5, it is characterized in that: when also being included in the bottom surface of weight line (6) in vertical position and distribution box body (1) and being horizontal, a point-like mark (7) under weight line (6), distribution box body (1) inwall.
8. pre-buried distribution box as claimed in claim 1 or 2, it is characterized in that: also comprise be convenient to connecting rod through, the first strip gab (31) and the second strip gab (21) for connecting brace (3) and buckle (2), and brace (3) has the first strip gab (31), buckle (2) has the second strip gab (21), and: the first strip gab (31) is vertical with corresponding the second strip gab (21).
9. pre-buried distribution box as claimed in claim 3, it is characterized in that: also comprise be convenient to connecting rod through, the first strip gab (31) and the second strip gab (21) for connecting brace (3) and buckle (2), and brace (3) has the first strip gab (31), buckle (2) has the second strip gab (21), and: the first strip gab (31) is vertical with corresponding the second strip gab (21).
10. pre-buried distribution box as claimed in claim 4, it is characterized in that: also comprise be convenient to connecting rod through, the first strip gab (31) and the second strip gab (21) for connecting brace (3) and buckle (2), and brace (3) has the first strip gab (31), buckle (2) has the second strip gab (21), and: the first strip gab (31) is vertical with corresponding the second strip gab (21).
CN2013203105881U 2013-06-02 2013-06-02 Pre-embedded distribution box Expired - Fee Related CN203339593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203105881U CN203339593U (en) 2013-06-02 2013-06-02 Pre-embedded distribution box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203105881U CN203339593U (en) 2013-06-02 2013-06-02 Pre-embedded distribution box

Publications (1)

Publication Number Publication Date
CN203339593U true CN203339593U (en) 2013-12-11

Family

ID=49708250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203105881U Expired - Fee Related CN203339593U (en) 2013-06-02 2013-06-02 Pre-embedded distribution box

Country Status (1)

Country Link
CN (1) CN203339593U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107221867A (en) * 2017-07-31 2017-09-29 成都市第四建筑工程公司 The pre-buried installation method of distribution box on a kind of concrete wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107221867A (en) * 2017-07-31 2017-09-29 成都市第四建筑工程公司 The pre-buried installation method of distribution box on a kind of concrete wall
CN107221867B (en) * 2017-07-31 2018-12-21 成都建工第四建筑工程有限公司 The pre-buried installation method of distribution box on a kind of concrete wall

Similar Documents

Publication Publication Date Title
CN103899227B (en) Window shutter
CN206189683U (en) Horizontal bright multi -angle glass curtain wall system that conceals of erecting
CN203339593U (en) Pre-embedded distribution box
CN214531437U (en) Suspended ceiling structure for building engineering construction
CN203701355U (en) Open curtain wall joint device with full-size inter-grasping structure
CN205530909U (en) Piece is hung in city furred ceiling installation combination
CN104806131A (en) Anti-theft integrated window
CN204534047U (en) A kind of suspension and support avoided at roofing or floor punching
CN110242015A (en) A kind of hung and buckled no screw corner end cap of co-extrusion wood moulding
CN205061216U (en) Limit stop device of elevator
CN204940773U (en) A kind of absorption type dry-hang aluminum plate
CN206053724U (en) A kind of moistureproof water seepage-preventing window frame structure
CN206814195U (en) Support anti-slipping mechanism
CN203719096U (en) Air conditioner outdoor unit support frame
CN209297205U (en) Intelligent property control device with heat dissipation effect
CN206406332U (en) A kind of rotational molding machine support frame
CN206467972U (en) Raised floor structure at edge of hollowed-out area
CN216948600U (en) Self-supporting water tank frame
CN111075071A (en) Mixed loading type curtain wall system
CN203233810U (en) Greenhouse rolling membrane window-opening upper frame structure
CN208223142U (en) A kind of liner and the separately installed structure of tuyere
CN204059574U (en) Separate type lock slot device
CN209609011U (en) A kind of electronic engineering control cabinet mounting base
CN208299350U (en) A kind of extension fixed structure of Metro Cable gantry
CN207045305U (en) A kind of nozzle support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20160602