CN203334709U - Photovoltaic bus shelter - Google Patents

Photovoltaic bus shelter Download PDF

Info

Publication number
CN203334709U
CN203334709U CN2013201967889U CN201320196788U CN203334709U CN 203334709 U CN203334709 U CN 203334709U CN 2013201967889 U CN2013201967889 U CN 2013201967889U CN 201320196788 U CN201320196788 U CN 201320196788U CN 203334709 U CN203334709 U CN 203334709U
Authority
CN
China
Prior art keywords
photovoltaic
waiting booth
column
booth according
vertical supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013201967889U
Other languages
Chinese (zh)
Inventor
黄晓军
武守斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FRONTIER TECHNOLOGY GROUP Ltd
Original Assignee
FRONTIER TECHNOLOGY GROUP Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FRONTIER TECHNOLOGY GROUP Ltd filed Critical FRONTIER TECHNOLOGY GROUP Ltd
Priority to CN2013201967889U priority Critical patent/CN203334709U/en
Application granted granted Critical
Publication of CN203334709U publication Critical patent/CN203334709U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a photovoltaic bus shelter which comprises a bus shelter framework, a photovoltaic assembly, an electric control energy storage system and electric appliance equipment. The photovoltaic assembly is arranged at the top of the bus shelter framework, and the photovoltaic assembly is connected with the electric appliance equipment through the electric control energy storage system. Solar energy is converted to electricity, electric power needs in lighting, indicating, advertising and the like are met, and the photovoltaic bus shelter is environmentally friendly and simplifies electric wiring.

Description

A kind of photovoltaic waiting booth
Technical field
The utility model relates to the bus shelter technical field, particularly a kind of photovoltaic waiting booth.
Background technology
Bus shelter (bus shelter), generally match with public transport stop board, for convenience of bus passenger sunshade while waiting, rainproof etc., AT STATION, the means of transportation built on the bay type multi-storied bus stop of road both sides or greenbelt.Due to the prosperity day by day of city bus, bus shelter has developed into the indispensable important component part in one, city, designs exquisite bus shelter and also becomes the city landscape of beauty together.
Traditional bus shelter, generally all adopt the mode of outside electric power network formula to supply with a series of electricity needs equipment such as illumination, indication, advertisement, so just need to connect electricity from other local lead-in wires, certain limitation is arranged, also will inevitably produce a large amount of costs and inconvenience, and the space of waiting is all narrower and small.
The utility model content
For the problems referred to above, the utility model provides a kind of photovoltaic waiting booth, to solve in prior art, need to connect the problem that electricity brings inconvenience from other local lead-in wires.
To achieve these goals, the technical solution of the utility model is as follows:
Photovoltaic waiting booth, is characterized in that, comprises bus shelter framework, photovoltaic module, automatically controlled energy-storage system and electric equipment, and described photovoltaic module is arranged on the top of bus shelter framework, and described photovoltaic module is connected with electric equipment by automatically controlled energy-storage system.
In a preferred embodiment of the present utility model, described automatically controlled energy-storage system comprises header box, control cabinet, inverter, battery, and photovoltaic module is connected with electric equipment by header box, inverter, control cabinet, battery.Further, described battery and electric equipment all are integrated in Electric Appliance Cabinet, and described Electric Appliance Cabinet is arranged on the two sides of bus shelter framework.
In a preferred embodiment of the present utility model, described bus shelter framework comprises two groups of forward and backward columns that are arranged on concrete pedestal, and front column and rear column upper end respectively are provided with a cross bar, on described cross bar, are provided with vertical pole.The height of described rear column, higher than the height of front column, makes vertical pole be inclined on cross bar.Be bolted to connection a welding lower margin on described concrete pedestal, on the welding lower margin, be provided with the column connecting hole, the lower end of described forward and backward column is set in the column connecting hole of welding lower margin, and passes through bolton.
Further, the upper end of described vertical pole connects a waterproof cover, prevents that rainwater is in vertical pole flows to photovoltaic waiting booth; The lower end of vertical pole is provided with the vertical pole shield.
Further, the two ends of described cross bar are provided with the cross bar shield.
In the utility model, be provided with horizontal support bar and lower horizontal support bar between two described rear columns, be arranged at intervals with some vertical supporting bars between described upper and lower transverse support bar, the zone that described upper and lower transverse support bar and vertical supporting bar define jointly is laid with transparent wind sheild.Further, described transparent wind sheild is fixed by screws on vertical supporting bar.Perhaps, described bus shelter framework also comprises a cover plate corresponding with described vertical supporting bar, be provided with male fastener on described vertical supporting bar, be provided with the mother buckle matched with described male fastener on cover plate, when transparent wind sheild is arranged on adjacent two vertical supporting bars, by cover plate is firmly pressed to vertical supporting bar, fix transparent wind sheild.
In the utility model, be provided with lateral bracing strut between described front column and rear column, described Electric Appliance Cabinet is arranged on the zone that lateral bracing strut, front column, rear column surround.Further, described Electric Appliance Cabinet is by pre-buried stone bolt fixedly on concrete pedestal.Between described front column and Electric Appliance Cabinet, between rear column and Electric Appliance Cabinet, be provided with side plate.
The utility model adopts and converts solar energy into electrical energy, and meets a series of electricity needs such as illumination, indication, advertisement, and environmental protection, simplified electrical wiring.
The utility model topology layout is reasonable, adopts aluminum alloy materials attractive in appearance and corrosion-resistant.
When mounted, scene does not need welding to bus shelter framework of the present utility model, and it is convenient to install.
Characteristics of the present utility model can be consulted the detailed description of the graphic and following better embodiment of this case and be obtained and be well understood to.
The accompanying drawing explanation
The overall structure schematic diagram that Fig. 1 is the utility model photovoltaic waiting booth.
The overall structure schematic diagram that Fig. 2 is the utility model photovoltaic waiting booth.
Fig. 3 is R place enlarged diagram in Fig. 2.
Fig. 4 is W place enlarged diagram in Fig. 1.
Fig. 5 is S place enlarged diagram in Fig. 2.
Fig. 6 is T place enlarged diagram in Fig. 2.
Fig. 7 is O place enlarged diagram in Fig. 1.
Fig. 8 is Y place enlarged diagram in Fig. 1.
Fig. 9 is transparent wind sheild scheme of installation in the utility model photovoltaic waiting booth.
Figure 10 is X place enlarged diagram in Fig. 1.
Figure 11 is photovoltaic module installation site schematic diagram in the utility model photovoltaic waiting booth.
Figure 12 is the schematic diagram of welding lower margin.
The sectional schematic diagram that Figure 13 is front column or rear column.
The schematic cross-section that Figure 14 is cover plate.
The schematic cross-section that Figure 15 is vertical supporting bar.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, further set forth the utility model below in conjunction with specific embodiment.
Referring to Fig. 1-11, photovoltaic waiting booth, mainly comprise bus shelter framework, photovoltaic module, automatically controlled energy-storage system and electric equipment.
The bus shelter framework adopts aluminium alloy extrusions, and each several part connects with stainless steel screw, has avoided traditional bus shelter to adopt the method for stainless steel welding.The bus shelter framework comprises the two groups of forward and backward columns (3,4) that are arranged on concrete pedestal, and the surface of front column 3 and rear column 4 all offers groove, for connecting other plates.Referring to Figure 12,13, the base plate that will weld lower margin with bolt is fastened on concrete pedestal 1, on the welding lower margin, is provided with the column connecting hole, and the side of welding lower margin has bolt connecting hole, the lower end of forward and backward column is set in the column connecting hole of welding lower margin, and passes through bolton.The upper end of forward and backward column (3,4) respectively is provided with a cross bar 14, is provided with vertical pole 15 on cross bar 14.The height of rear column 4, higher than the height of front column 3, makes vertical pole 15 be inclined on cross bar 14.The upper end of vertical pole 15 connects a waterproof cover 18, prevents that rainwater is in vertical pole flows to photovoltaic waiting booth; The lower end of vertical pole is provided with vertical pole shield 24, and the two ends of cross bar are provided with cross bar shield 23.
Be provided with lateral bracing strut 5 between front column 3 and rear column 4, Electric Appliance Cabinet 21 is arranged on the zone that lateral bracing strut 5, front column 3, rear column 4 surround.Electric Appliance Cabinet 21 is by pre-buried stone bolt fixedly on concrete pedestal.Between front column 3 and Electric Appliance Cabinet 21, between rear column 4 and Electric Appliance Cabinet 21, be provided with side plate 20, so that further fixing Electric Appliance Cabinet.
Be provided with horizontal support bar 9 and lower horizontal support bar between two rear columns 4, be arranged at intervals with three vertical supporting bars 10 between upper and lower transverse support bar, the zone that upper and lower transverse support bar and vertical supporting bar define jointly is laid with transparent wind sheild 19.
Photovoltaic module (also being solar panel) is the core in solar power system, is also most important part in solar power system.Its effect is to convert solar energy into electrical energy, or is sent in battery and stores, or promotes loaded work piece.Photovoltaic module is arranged on the vertical pole upper surface of bus shelter framework, by top board 16 and limit pressing plate, with tapping screw, fixes.Photovoltaic module is connected with electric equipment by automatically controlled energy-storage system.Lamp box advertisement, LCD liquid crystal display, LED lamp and battery all are integrated in Electric Appliance Cabinet 21.
Automatically controlled energy-storage system comprises header box, control cabinet, inverter, battery, and photovoltaic module is connected with electric equipment by header box, inverter, control cabinet, battery.The utility model adopts and converts solar energy into electrical energy, and meets a series of electricity needs such as illumination, indication, advertisement, and environmental protection, simplified electrical wiring.
The installation process of photovoltaic waiting booth is roughly:
1, pin support member 2 is fixed on the stone bolt that is embedded in 1 li of concrete pedestal; (seeing accompanying drawing 3)
2, intact Electric Appliance Cabinet 21 will be installed, be placed on concrete pedestal 1, by the fixing Electric Appliance Cabinet of pre-buried stone bolt; (seeing accompanying drawing 4)
3, front column connector 7, rear column connector 8 are individually fixed in to the upper end of forward and backward column by hex bolts; (seeing accompanying drawing 5,6)
4, front column 3 lower end ends are positioned on fixing feet, both sides are locked with hexagon socket head cap screw respectively, and rear column is installed successively; (seeing accompanying drawing 3)
5, by side plate 20 along the column surface groove, be placed between column and Electric Appliance Cabinet 21; (seeing accompanying drawing 4)
6, lateral bracing strut 5 is contained between the column of front and back, and guarantees that the top margin of side plate 20 just can stick in the groove on lateral bracing strut 5 bases, lateral bracing strut 5 two ends are fixed between front column 3 and rear column 4 by pull bar support member 6 and tapping screw; (seeing accompanying drawing 7)
7, transverse support bar 9 is fixed between two rear columns 4 by angle support member 13; (seeing accompanying drawing 8)
8, L shaped aluminium fixing feet 11 inserted the respective grooves of vertical supporting bar from the two ends of vertical supporting bar, utilized the T-shaped groove on transverse support bar 9 to coordinate T-shaped bolt to fix; Transparent wind sheild 19 is attached on vertical supporting bar 10, and edge is fixed with tapping screw respectively, finally cover plate 12 is applied to certain pressure along vertical supporting bar 10, by the buckle structure between rod member, reaches both laminatings; (seeing accompanying drawing 9).Referring to Figure 14,15, be provided with male fastener on vertical supporting bar, be provided with the mother buckle matched with described male fastener on cover plate, vertical supporting bar and cover plate can be fastened togather.When transparent wind sheild is arranged on adjacent two vertical supporting bars, by cover plate is firmly pressed to vertical supporting bar, fix transparent wind sheild.Cover plate is connected with vertical supporting bar, and connector is hidden, and plays effect attractive in appearance.Certainly, transparent wind sheild also can be fixed by screws on vertical supporting bar.
9, cross bar 14 is placed in the groove on column connecting piece 7 tops, reserves installation site, by square nut and hexagon socket head cap screw, fix cross bar; (seeing accompanying drawing 5,6)
10, according to the regulation apart from size, vertical pole 15 is fixed in to cross bar 14 upper surfaces, fix both by tapping screw; (seeing accompanying drawing 5)
11, lay photovoltaic module 25 to vertical pole 15 upper surfaces, by top board 16 and limit pressing plate, fix with tapping screw; (seeing accompanying drawing 2,11)
12, by header box fixture 22, header box 17 is fixed on to the upper right side of whole bus shelter; (seeing accompanying drawing 10)
13, the waterproof cover 18 of vertical pole 15 ends is installed, is prevented that rainwater is in vertical pole flows to the car booth.
Above demonstration and described basic principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what in above-described embodiment and manual, describe is principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these changes and improvements all fall in claimed scope of the present utility model.The protection domain that the utility model requires is defined by appending claims and equivalent thereof.

Claims (13)

1. photovoltaic waiting booth, is characterized in that, comprises bus shelter framework, photovoltaic module, automatically controlled energy-storage system and electric equipment, and described photovoltaic module is arranged on the top of bus shelter framework, and described photovoltaic module is connected with electric equipment by automatically controlled energy-storage system.
2. photovoltaic waiting booth according to claim 1, is characterized in that, described automatically controlled energy-storage system comprises header box, control cabinet, inverter, battery, and photovoltaic module is connected with electric equipment by header box, inverter, control cabinet, battery.
3. photovoltaic waiting booth according to claim 2, is characterized in that, described battery and electric equipment all are integrated in Electric Appliance Cabinet, and described Electric Appliance Cabinet is arranged on the two sides of bus shelter framework.
4. photovoltaic waiting booth according to claim 3, is characterized in that, described bus shelter framework comprises two groups of forward and backward columns that are arranged on concrete pedestal, and front column and rear column upper end respectively are provided with a cross bar, on described cross bar, are provided with vertical pole.
5. photovoltaic waiting booth according to claim 4, it is characterized in that, be bolted to connection a welding lower margin on described concrete pedestal, be provided with the column connecting hole on the welding lower margin, the lower end of described forward and backward column is set in the column connecting hole of welding lower margin, and passes through bolton.
6. photovoltaic waiting booth according to claim 5, is characterized in that, the height of described rear column, higher than the height of front column, makes vertical pole be inclined on cross bar.
7. photovoltaic waiting booth according to claim 6, is characterized in that, the upper end of described vertical pole connects a waterproof cover; The lower end of vertical pole is provided with the vertical pole shield.
8. photovoltaic waiting booth according to claim 7, is characterized in that, the two ends of described cross bar are provided with the cross bar shield.
9. photovoltaic waiting booth according to claim 8, it is characterized in that, be provided with horizontal support bar and lower horizontal support bar between two described rear columns, be arranged at intervals with some vertical supporting bars between described upper and lower transverse support bar, the zone that described upper and lower transverse support bar and vertical supporting bar define jointly is laid with transparent wind sheild.
10. photovoltaic waiting booth according to claim 9, is characterized in that, described transparent wind sheild is fixed by screws on vertical supporting bar.
11. photovoltaic waiting booth according to claim 9, it is characterized in that, also comprise a cover plate corresponding with described vertical supporting bar, be provided with male fastener on described vertical supporting bar, be provided with the mother buckle matched with described male fastener on cover plate, when transparent wind sheild is arranged on adjacent two vertical supporting bars, by cover plate is firmly pressed to vertical supporting bar, fix transparent wind sheild.
12. photovoltaic waiting booth according to claim 11, is characterized in that, between described front column and rear column, is provided with lateral bracing strut, described Electric Appliance Cabinet is arranged on the zone that lateral bracing strut, front column, rear column surround.
13. photovoltaic waiting booth according to claim 12, is characterized in that, between described front column and Electric Appliance Cabinet, between rear column and Electric Appliance Cabinet, be provided with side plate.
CN2013201967889U 2013-04-18 2013-04-18 Photovoltaic bus shelter Expired - Fee Related CN203334709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013201967889U CN203334709U (en) 2013-04-18 2013-04-18 Photovoltaic bus shelter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013201967889U CN203334709U (en) 2013-04-18 2013-04-18 Photovoltaic bus shelter

Publications (1)

Publication Number Publication Date
CN203334709U true CN203334709U (en) 2013-12-11

Family

ID=49703389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013201967889U Expired - Fee Related CN203334709U (en) 2013-04-18 2013-04-18 Photovoltaic bus shelter

Country Status (1)

Country Link
CN (1) CN203334709U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952204A (en) * 2016-06-28 2016-09-21 江苏礼德铝业有限公司 Solar car shed
CN106602437A (en) * 2017-02-21 2017-04-26 南京信息职业技术学院 Independent partition heat-dissipation type power distribution device
CN106760678A (en) * 2017-02-13 2017-05-31 深圳市华人世纪科技有限公司 Multifunctional bus station booth
CN106894653A (en) * 2017-02-24 2017-06-27 南宁市生润科技有限公司 Solar powered formula intelligent bus station waiting booth

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952204A (en) * 2016-06-28 2016-09-21 江苏礼德铝业有限公司 Solar car shed
CN106760678A (en) * 2017-02-13 2017-05-31 深圳市华人世纪科技有限公司 Multifunctional bus station booth
CN106602437A (en) * 2017-02-21 2017-04-26 南京信息职业技术学院 Independent partition heat-dissipation type power distribution device
CN106894653A (en) * 2017-02-24 2017-06-27 南宁市生润科技有限公司 Solar powered formula intelligent bus station waiting booth

Similar Documents

Publication Publication Date Title
CN203334709U (en) Photovoltaic bus shelter
CN204836050U (en) Angularly adjustable solar cell panel mounting bracket
CN102709369B (en) Tile solar photovoltaic module
CN202663872U (en) Movable type solar greenhouse
CN201593741U (en) Wind and photovoltaic hybrid power lamp road with monitoring equipment
CN202905734U (en) Photovoltaic array with assemblies mounted in east-west direction and mounting support thereof
CN202284393U (en) Outdoor solar parking shed
CN108758526A (en) A kind of LED solar street lights simple Installation Method
CN204754006U (en) Building balustrade for balcony
CN203334713U (en) Upright fixing structure of bus shelter
CN203334714U (en) Wind shield fixing structure of bus shelter
CN201065655Y (en) Solar energy cell integral photovoltaic bus shelter
CN204794841U (en) Rotatable solar cell panel mounting bracket
CN201964295U (en) Rectangular flower-shaped solar energy street lamp
CN201117199Y (en) Large-scale solar energy power-supply billboard
CN204947958U (en) A kind of solar panels supporting structure
CN101430847A (en) Large advertisement board with solar power supply
KR20100126201A (en) Bus stop or bike stand with photo voltage module
CN102312583A (en) Solar cell integrated photovoltaic bus shelter
CN204728591U (en) Balcony building guardrail
CN210955997U (en) Multifunctional rolling advertisement lamp box for station
CN202678361U (en) Tile solar photovoltaic module
CN209114967U (en) It is a kind of can solar power generation building site guardrail
CN201661862U (en) Mobile solar LED lighting device
CN201460294U (en) Solar photovoltaic power generation bus stop kiosk

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20160418