CN203308104U - 一种纤维布的预应力张拉装置 - Google Patents
一种纤维布的预应力张拉装置 Download PDFInfo
- Publication number
- CN203308104U CN203308104U CN2013202876317U CN201320287631U CN203308104U CN 203308104 U CN203308104 U CN 203308104U CN 2013202876317 U CN2013202876317 U CN 2013202876317U CN 201320287631 U CN201320287631 U CN 201320287631U CN 203308104 U CN203308104 U CN 203308104U
- Authority
- CN
- China
- Prior art keywords
- fiber cloth
- prestress
- tension device
- strut
- cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型涉及一种纤维布的预应力张拉装置,包括撑杆、液压千斤顶、钢构件、垫板,撑杆两端通过垫板固定连接有钢构件,撑杆端部与垫板之间固定有液压千斤顶,所述的钢构件上设有两个互相平行的滚轴。本实用新型的优点是:结构简单灵巧,不受场地限制,易于施工,能够充分发挥高强纤维布强度值,采用内设千斤顶施加膨胀力的方式,通过端部滚轴拉长缠绕在滚轴上的高强纤维布,达到施加预应力的目的。预应力纤维布与设备一体,可以灵活提升和安放,对场地要求较低。张拉设备可以循环使用。
Description
技术领域
本实用新型属于结构加固施工技术领域,尤其涉及一种纤维布的预应力张拉装置。
背景技术
近年来,纤维布以其轻质、高强(碳纤维强度约为钢材10倍)、耐腐蚀、施工方便等独特优点,被越来越广泛地应用于结构修复及加固领域。然而,在高强纤维布加固方法大范围推广的同时,研究人员也发现高强纤维布的常用加固方法存在着明显技术缺陷:由于高强纤维布的弹性模量不比钢材高,在受拉钢筋屈服时,其强度才发挥不到20%,只有当构件开裂严重和变形明显增大之后,才可能发挥出更多的强度值,但此时构件已经不能满足正常使用要求。因此,应该采用高强纤维布的预应力施工方法。
对于常见的高强纤维布来说,如果采用有效的预应力张拉设备进行预应力施工,就可以充分发挥高强纤维布的强度值,提高构件的开裂荷载和屈服荷载,缓解高强纤维布的应力滞后问题,有效延迟裂缝开展,减小挠度变形,显著改善结构的工作性能。
由于目前市场上还未出现易于施工的高强纤维布预应力张拉设备,因此高强纤维布预应力施工设备的开发就成为该技术推广使用的关键。
发明内容
为克服现有技术的不足,本实用新型的目的是提供一种使用灵活方便,易于施工的纤维布的预应力张拉装置,达到充分发挥高强纤维布强度值的要求。
为实现上述目的,本实用新型通过以下技术方案实现:
一种纤维布的预应力张拉装置,包括撑杆、液压千斤顶、钢构件、垫板,撑杆两端通过垫板固定连接有钢构件,撑杆端部与垫板之间固定有液压千斤顶,所述的钢构件上设有两个互相平行的滚轴。
所述的撑杆由两段或两段以上钢管通过法兰固定连接组成。
所述的撑杆两端的钢构件的滚轮平行布置。
所述的垫板宽度W为撑杆直径DN的1/5-1/3。
与现有技术相比,本实用新型的有益效果是:
结构简单灵巧,不受场地限制,易于施工,能够充分发挥高强纤维布强度值,采用内设千斤顶施加膨胀力的方式,通过端部滚轴拉长缠绕在滚轴上的高强纤维布,达到施加预应力的目的。预应力纤维布与设备一体,可以灵活提升和安放,对场地要求较低。张拉设备可以循环使用。
附图说明
图1是本实用新型的主视图。
图2是本实用新型的俯视图。
图3是本实用新型的侧视图。
图4是图1的局部放大图。
图中:1-撑杆 2-液压千斤顶 3-钢构件 4-夹紧片 5-纤维布 6-垫板 7-滚轴。
具体实施方式
下面结合说明书附图对本实用新型进行详细地描述,但是应该指出本实用新型的实施不限于以下的实施方式。
见图1-图4,一种纤维布的预应力张拉装置,包括撑杆1、液压千斤顶2、钢构件3、垫板6,撑杆1两端通过垫板6固定连接有钢构件3,撑杆1一端与垫板6之间固定有液压千斤顶2,所述的钢构件3上设有两个互相平行的滚轴7。
所述的撑杆1由两段或两段以上钢管通过法兰固定连接组成。
所述的撑杆1两端的钢构件3互相平行布置。
所述的垫板6宽度W为撑杆1直径DN的1/5-1/3。
实施例:
本装置各个部件均选用Q345等高强度钢材制作,根据常见梁板跨度确定撑杆1截面尺寸,根据常见梁宽度确定钢构件3的滚轴7长度,根据常用加载数值及施工操作空间确定钢构件3的尺寸规格。撑杆1由多个钢管通过法兰固定连接而成,应制作出多组不同的规格及长度,以适合运输和现场组装。钢垫板6用于减小液压千斤顶2卸载时端部的弯矩影响。
施工前,按照图1中所示连接方法,根据加固构件长度及纤维布的拉伸量,空间尺寸等数据来现场组合撑杆1;然后连接液压千斤顶2;再连接垫板6及带两个滚轴的端部钢构件3。设备组装完成后,把高强纤维布5绕过滚轴7缠绕一圈,并留出足够的搭接长度,再用多个钢板夹紧片4在纤维布5的搭接区域进行牢固夹紧。
以上操作可以选择合适场地进行,然后根据高强纤维布张拉力设计值对液压千斤顶2加压,达到2倍张拉力设计值时停止,把设备连同高强纤维布5一起提升至需加固部位,即可进行粘贴高强纤维布5的施工操作,待施工完毕,达到卸载条件时,可以释放液压千斤顶2的压力,拆卸本装置循环使用。
本实用新型结构简单灵巧,不受场地限制,易于施工,能够充分发挥高强纤维布强度值,采用内设千斤顶施加膨胀力的方式,通过端部滚轴拉长缠绕在滚轴上的高强纤维布,达到施加预应力的目的,端部滚轴使得张拉阻力很小。预应力纤维布与设备一体,可以灵活提升和安放,对场地要求较低。张拉设备可以循环使用。
Claims (4)
1.一种纤维布的预应力张拉装置,其特征在于,包括撑杆、液压千斤顶、钢构件、垫板,撑杆两端通过垫板固定连接有钢构件,撑杆一端与垫板之间固定有液压千斤顶,所述的钢构件上设有两个互相平行的滚轴。
2.根据权利要求1所述的一种纤维布的预应力张拉装置,其特征在于,所述的撑杆由两段或两段以上钢管通过法兰固定连接组成。
3.根据权利要求1所述的一种纤维布的预应力张拉装置,其特征在于,所述的撑杆两端的钢构件互相平行布置。
4.根据权利要求1所述的一种纤维布的预应力张拉装置,其特征在于,所述的垫板宽度W为撑杆直径DN的1/5-1/3。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202876317U CN203308104U (zh) | 2013-05-21 | 2013-05-21 | 一种纤维布的预应力张拉装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202876317U CN203308104U (zh) | 2013-05-21 | 2013-05-21 | 一种纤维布的预应力张拉装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203308104U true CN203308104U (zh) | 2013-11-27 |
Family
ID=49614322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202876317U Withdrawn - After Issue CN203308104U (zh) | 2013-05-21 | 2013-05-21 | 一种纤维布的预应力张拉装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203308104U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266774A (zh) * | 2013-05-21 | 2013-08-28 | 中冶焦耐工程技术有限公司 | 一种纤维布的预应力张拉装置及使用方法 |
CN110318558A (zh) * | 2019-07-31 | 2019-10-11 | 南方工程检测修复技术研究院 | 一种预应力frp加固柱形结构的预应力施加装置及其施工方法 |
-
2013
- 2013-05-21 CN CN2013202876317U patent/CN203308104U/zh not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266774A (zh) * | 2013-05-21 | 2013-08-28 | 中冶焦耐工程技术有限公司 | 一种纤维布的预应力张拉装置及使用方法 |
CN103266774B (zh) * | 2013-05-21 | 2015-11-18 | 中冶焦耐工程技术有限公司 | 一种纤维布的预应力张拉装置及使用方法 |
CN110318558A (zh) * | 2019-07-31 | 2019-10-11 | 南方工程检测修复技术研究院 | 一种预应力frp加固柱形结构的预应力施加装置及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
He et al. | Comparison of glulam post-to-beam connections reinforced by two different dowel-type fasteners | |
CN203320978U (zh) | 预应力碳纤维片材加固大跨混凝土结构的张拉锚固装置 | |
CN102425105B (zh) | 纵向不抗剪螺杆式抗拔连接件的施工方法 | |
CN104110086A (zh) | 弦支穹顶与平面预应力组合结构、张拉工装及施工方法 | |
CN102936941A (zh) | 复合管混凝土组合结构 | |
CN102493660A (zh) | 一种碳纤维增强复合材料预应力筋的锚固方法及锚具 | |
CN106835936A (zh) | 一种frp约束钢管混凝土拱结构 | |
CN203308104U (zh) | 一种纤维布的预应力张拉装置 | |
CN203782591U (zh) | 一种复合板材预应力的自动张拉锚固系统 | |
CN110130234B (zh) | 一种新型桥梁加固体系及其施工方法 | |
CN101614053A (zh) | 大柔度先压法预应力钢筋及其实现方法 | |
CN203007855U (zh) | 预应力纤维复合板材的张拉锚固系统 | |
CN210421995U (zh) | 一种矩形截面rc柱主动约束加固装置 | |
CN204676920U (zh) | 一种力纤维布加固结构 | |
CN103266774B (zh) | 一种纤维布的预应力张拉装置及使用方法 | |
CN107503527B (zh) | 一种预应力碳纤维板可拆卸锚具 | |
CN202543911U (zh) | 预应力增强塑料棒材、预应力钢绞索复合结构支护悬臂桩 | |
CN111455819B (zh) | 一种预压钢管混凝土肋间支撑 | |
CN206418410U (zh) | 一种预应力钢丝锚固系统 | |
CN205276129U (zh) | 一种纤维增强复合材料-竹组合桥面板 | |
CN101281119B (zh) | Frp布加固试验用持续荷载加载器及方法 | |
CN109138154B (zh) | 一种织物混凝土预制构件节点连接方法 | |
CN204000644U (zh) | 热带季风气候下大跨径预应力混凝土桥梁加固装置 | |
CN203783156U (zh) | 预应力碳纤维布施工自平衡张拉装置 | |
CN202543915U (zh) | 设有增强塑料箍筋的支护悬臂桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20131127 Effective date of abandoning: 20151118 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |