CN203308074U - Novel scaffold floor - Google Patents

Novel scaffold floor Download PDF

Info

Publication number
CN203308074U
CN203308074U CN2013203505579U CN201320350557U CN203308074U CN 203308074 U CN203308074 U CN 203308074U CN 2013203505579 U CN2013203505579 U CN 2013203505579U CN 201320350557 U CN201320350557 U CN 201320350557U CN 203308074 U CN203308074 U CN 203308074U
Authority
CN
China
Prior art keywords
scaffold floor
lock pin
self
scaffold
novel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203505579U
Other languages
Chinese (zh)
Inventor
张明文
陈合富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SINO TRANSPORT TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG SINO TRANSPORT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SINO TRANSPORT TECHNOLOGY Co Ltd filed Critical ZHEJIANG SINO TRANSPORT TECHNOLOGY Co Ltd
Priority to CN2013203505579U priority Critical patent/CN203308074U/en
Application granted granted Critical
Publication of CN203308074U publication Critical patent/CN203308074U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a scaffold floor used for construction of buildings, and discloses a novel scaffold floor. The novel scaffold floor comprises a scaffold floor main plate. The two ends of the scaffold floor are respectively provided with a hook. A self-lock pin is arranged at the position, apart from one hook, of one end of the scaffold floor main plate, and a manual lock pin is arranged at the other end of the scaffold floor main plate. According to the novel scaffold floor, except for meeting an original basic function, a horizontal fixing limiting mode improves the integral rigidity of the scaffold floor, the horizontal stability is enhanced, the construction safety of the scaffold floor in the entire engineering is improved, building is convenient and fast, and the strength is high.

Description

A kind of Novel scaffold board
Technical field
The utility model relates to the working scaffold floor of building, has related in particular to a kind of Novel scaffold board.
Background technology
At present, what China's building scaffold floor field scaffold floor great majority used adopted is to link up with the mode that simply buckles, mainly by metal plate and the metal hanger that is welded in two ends, formed, this kind mode can only meet the basic function that the constructor walks in the above, and stability and the rigidity of whole scaffold floor is helped without any raising.
Summary of the invention
The utility model has mainly solved the problem of existing scaffold floor function singleness, and a kind of Novel scaffold board is provided.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
A kind of Novel scaffold board, comprise the scaffold floor mainboard, and the scaffold floor two ends are respectively equipped with hook, and position scaffold floor mainboard one end except hook is provided with self-lock pin, and the other end is provided with manual lock pin.Two ends are respectively equipped with two hooks at least, and hook is mainly used to the buckle steel pipe.
As preferably, self-lock pin one end is provided with the first anticreep projection, and other end edge one side is provided with the first afterbody anticreep projection.Self-lock pin is stuck with working steel pipe, and edge arranges the first anticreep projection and the first afterbody anticreep projection and prevents that steel pipe is from the scaffold floor mainboard loss that comes off.
As preferably, manually lock pin one end is provided with the second anticreep projection, and other end both sides of edges is provided with the second afterbody anticreep projection.Self-lock pin is stuck with working steel pipe, and edge arranges the second anticreep projection and the second afterbody anticreep projection and prevents that steel pipe is from the scaffold floor mainboard loss that comes off.
As preferably, scaffold floor mainboard one end side surface edge is provided with and matching used the first through hole of self-lock pin, and other end lateral edge is provided with and matching used the second through hole of manual lock pin.Be used for fixing the position of self-lock pin and manual lock pin.
As preferably, scaffold floor mainboard panel is provided with and the matching used square through hole of self-lock pin.Square through hole is to be used for fixing the first afterbody anticreep projection.
The utility model, owing to having adopted above technical scheme, has significant technique effect:
The utility model has met outside original basic function basis, and the spacing raising scaffold floor integral rigidity that level is fixing, increase its horizontal stability, improves the whole scaffold floor construction safety of engineering, and build convenient and swift, intensity is high.
The accompanying drawing explanation
Fig. 1 is lateral view of the present utility model.
Fig. 2 is top view of the present utility model.
The toponym that in accompanying drawing, each number designation refers to is as follows: 1-scaffold floor mainboard, 2-hook, 3-self-lock pin, 4-manual lock pin, the 5-the first through hole, the 6-the second through hole, 7-square through hole, the 31-the first anticreep projection, the 32-the first afterbody anticreep projection, the 41-the second anticreep projection, the 42-the second afterbody anticreep projection.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail.
Embodiment 1
A kind of Novel scaffold board, as shown in Figure 1, comprise scaffold floor mainboard 1, and the scaffold floor two ends are respectively equipped with hook 2, and position scaffold floor mainboard 1 one ends except hook 2 are provided with self-lock pin 3, and the other end is provided with manual lock pin 4.Scaffold floor mainboard two ends are respectively equipped with two hooks 2 at least, and hook 2 is mainly used to the working steel pipe of buckle.
Self-lock pin 3 one ends are provided with the first anticreep projection 31, and other end edge one side is provided with the first afterbody anticreep projection 32.Self-lock pin 3 is stuck with working steel pipe, and self-lock pin 3 edges arrange first anticreep projection the 31 and first afterbody anticreep projection 32 and prevent that steel pipe is from scaffold floor mainboard 1 loss that comes off.
Manually lock pin 4 one ends are provided with the second anticreep projection 41, and other end both sides of edges is provided with the second afterbody anticreep projection 42.Manually lock pin 4 is stuck with working steel pipe, and edge arranges second anticreep projection the 41 and second afterbody anticreep projection 42 and prevents that steel pipe is from scaffold floor mainboard 1 loss that comes off.
Scaffold floor mainboard 1 one end side surface edges are provided with and matching used the first through hole 5 of self-lock pin 3, and other end lateral edge is provided with and matching used the second through hole 6 of manual lock pin 4.The first through hole 5 and the second through hole 6 are used for fixing the position of self-lock pin 3 and manual lock pin 4.Scaffold floor mainboard 1 panel is provided with and the matching used square through hole 7 of self-lock pin 3, and square through hole 7 is used for fixing the first afterbody anticreep projection 32.
Implementation process: scaffold floor mainboard 1 one ends are provided with self-lock pin 3, the other end is provided with manual lock pin 4, when self-lock pin 3 drops on the working steel pipe of setting up at hook 2, steel pipe is by self-lock pin 3 jack-up, while along with scaffold floor mainboard 1, continuing to fall to touching steel pipe, the self-lock pin 3 of jack-up rises to certain altitude and walks around steel pipe and automatically fall, and now self-lock pin 3 has been encircled locking function with hook 2 by steel pipe; Manually lock pin 4 is along with steel pipe is inserted in hook 2 fully, now advances gently manual lock pin 4 to paste after firm steel pipe downside to strike jail with hand hammer to complete locked; Now, scaffold floor main body 1 has the integral body of some strength by the locked formation of steel pipe, thereby has greatly strengthened integral rigidity and the stability of scaffold floor.
In a word, the foregoing is only preferred embodiment of the present utility model, all equalizations of doing according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (5)

1. a Novel scaffold board, comprise scaffold floor mainboard (1), it is characterized in that: the scaffold floor two ends are respectively equipped with hook (2), and position scaffold floor mainboard (1) one end except hook (2) is provided with self-lock pin (3), and the other end is provided with manual lock pin (4).
2. a kind of Novel scaffold board according to claim 1 is characterized in that: self-lock pin (3) one ends are provided with the first anticreep projection (31), and other end edge one side is provided with the first afterbody anticreep projection (32).
3. a kind of Novel scaffold board according to claim 1 is characterized in that: manually lock pin (4) one ends are provided with the second anticreep projection (41), and other end both sides of edges is provided with the second afterbody anticreep projection (42).
4. a kind of Novel scaffold board according to claim 1, it is characterized in that: scaffold floor mainboard (1) one end side surface edge is provided with and matching used the first through hole of self-lock pin (3) (5), and other end lateral edge is provided with and matching used the second through hole of manual lock pin (4) (6).
5. a kind of Novel scaffold board according to claim 1, it is characterized in that: scaffold floor mainboard (1) panel is provided with and the matching used square through hole of self-lock pin (3) (7).
CN2013203505579U 2013-06-17 2013-06-17 Novel scaffold floor Expired - Fee Related CN203308074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203505579U CN203308074U (en) 2013-06-17 2013-06-17 Novel scaffold floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203505579U CN203308074U (en) 2013-06-17 2013-06-17 Novel scaffold floor

Publications (1)

Publication Number Publication Date
CN203308074U true CN203308074U (en) 2013-11-27

Family

ID=49614292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203505579U Expired - Fee Related CN203308074U (en) 2013-06-17 2013-06-17 Novel scaffold floor

Country Status (1)

Country Link
CN (1) CN203308074U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481132A (en) * 2014-12-12 2015-04-01 柳州铁道职业技术学院 Novel composite material scaffold board
CN104790649A (en) * 2015-05-12 2015-07-22 江苏博林机械制造有限公司 Steel spring board with joint structure
CN108691411A (en) * 2017-04-07 2018-10-23 天津九为实业有限公司 A kind of coupling type foot pedal of self-locking
CN111255223A (en) * 2020-01-21 2020-06-09 天津安建脚手架有限公司 Hook pedal

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481132A (en) * 2014-12-12 2015-04-01 柳州铁道职业技术学院 Novel composite material scaffold board
CN104481132B (en) * 2014-12-12 2017-02-22 柳州铁道职业技术学院 Composite material scaffold board
CN104790649A (en) * 2015-05-12 2015-07-22 江苏博林机械制造有限公司 Steel spring board with joint structure
CN108691411A (en) * 2017-04-07 2018-10-23 天津九为实业有限公司 A kind of coupling type foot pedal of self-locking
CN111255223A (en) * 2020-01-21 2020-06-09 天津安建脚手架有限公司 Hook pedal

Similar Documents

Publication Publication Date Title
CN203308074U (en) Novel scaffold floor
CN104088227A (en) Rear pull rod
CN103343614A (en) Scaffold unloading steel wire rope setting method
CN204645570U (en) One can have enough to meet the need elevator shaft protective platform
CN203617636U (en) Vertical face connecting piece of cable ladder
CN205369835U (en) Receive limit ornamental strip mounting structure
CN205063032U (en) Wall connection node structure
CN205742975U (en) A kind of direct plugging type scaffold
CN202596150U (en) Scaffold pedal
CN204059856U (en) Novel unit formula floor
CN207727960U (en) A kind of construction exterior rack plate
CN206495496U (en) A kind of aluminum alloy mould plate shear wall top bracing means
CN205677444U (en) A kind of window frame stator of bridge-cut-off horizontal drawing window
CN205000640U (en) Outer wall mold sheet composition reinforcerment system
CN208981753U (en) Key slot type scaffold is fixedly connected device
CN209585589U (en) A kind of climbing frame Dense mesh screen horse
CN204940859U (en) Shear wall formwork inner corner trim rapid reinforcement part
CN205012632U (en) A baseboard for scaffold
CN205276768U (en) Mushroom slate fixing system
CN205740047U (en) Self-locking girder steel hoisting device
CN204780619U (en) Rhombus connecting box for false work for bridge
CN204645633U (en) A kind of wall form bracing means
CN204213608U (en) A kind of profile shapes
CN204357098U (en) Overarm scaffold floor
CN208650786U (en) A kind of novel hanging ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131127

Termination date: 20190617