CN203307806U - Combined hammer head of pile hammer - Google Patents

Combined hammer head of pile hammer Download PDF

Info

Publication number
CN203307806U
CN203307806U CN2013203105754U CN201320310575U CN203307806U CN 203307806 U CN203307806 U CN 203307806U CN 2013203105754 U CN2013203105754 U CN 2013203105754U CN 201320310575 U CN201320310575 U CN 201320310575U CN 203307806 U CN203307806 U CN 203307806U
Authority
CN
China
Prior art keywords
tup
hammer head
pile
head
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203105754U
Other languages
Chinese (zh)
Inventor
陈琦
张春龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Forging Machinery Co ltd
Original Assignee
NANTONG HAIZHUO CNC EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HAIZHUO CNC EQUIPMENT Co Ltd filed Critical NANTONG HAIZHUO CNC EQUIPMENT Co Ltd
Priority to CN2013203105754U priority Critical patent/CN203307806U/en
Application granted granted Critical
Publication of CN203307806U publication Critical patent/CN203307806U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a combined hammer head of a pile hammer, and relates to the field of building construction machines. The combined hammer head comprises a main hammer head and a secondary hammer head, wherein the secondary hammer head is stacked on the main hammer head, a first vibration-absorbing elastic element is arranged between the main hammer head and the secondary hammer head, and the main hammer head and the secondary hammer head are integrally connected by an elastic connection assembly. The combined hammer head disclosed by the utility model has the advantages that without changing the hammering energy, the maximum hammering force is effectively controlled, the hammering bounce is reduced, the hammering time is prolonged, the piling depth is increased, and a concrete prefabricated pile head can be effectively protected.

Description

A kind of pile hammer combination tup
Technical field
The utility model relates to the construction machine field, is specially a kind of pile hammer combination tup.
Background technology
Along with the high stratification of urban architecture, the pile foundation load bearing requirements is more and more higher, and the pile foundation degree of depth is more and more darker, and preformed pile is longer, and the pile sinking blow energy requires higher.The hitting power that concrete prefabricated pile head bears is directly proportional to length and the quality of stake, to the blow energy of pile sinking, be directly proportional, and the limit hitting power of its carrying of concrete precast pile is directly proportional to the section area of stake, relevant with the compressive strength of its material.Play dark stake and can not break pile crown again, just need large blow energy, can not surpass again the ultimate bearing capacity hitting power of concrete precast pile, and traditional pile hammer hitting power often is directly proportional to blow energy, plays dark stake and often is difficult to adapt to.
The utility model content
The purpose of this utility model is to provide a kind ofly can effectively control maximum hitting power, reduces and hits bounce-back, extends the hammering time, improves the pile penetration of piling, can effectively protect the pile hammer combination tup of concrete prefabricated pile head.
The technical scheme that realizes above-mentioned purpose is: a kind of pile hammer combination tup, it is characterized in that: comprise main ram head and secondary tup, secondary tup overlays on the main ram head, between main ram head and secondary tup, be provided with the first absorbing flexible member, by elastic connecting component, connect into an integral body between main ram head and secondary tup.
Optimally, described secondary tup is formed by stacking from top to bottom successively by least one tup.
Preferably, between the tup of described secondary tup, can optionally be provided with as required the second absorbing flexible member.
Preferably, between the adjacent tup of described secondary tup, be respectively arranged with the second absorbing flexible member.
Guiding, the type of drive of the utility model pile hammer combination tup and the whole tup of former pile hammer are just the same, during piling, the combination tup is under deadweight and power drive effect, the savings energy, hit the contact pile cover, during strike, the main ram head acts directly on pile cover, realizes first strike, secondary tup acts on the main ram head by the absorbing flexible member, due to the effect of absorbing flexible member, the strike of secondary tup lags behind, and realizes additional strike for the second time.The more, hitting power is longer action time for the more additional cycle of secondary tup quantity of combination tup.
The combinations thereof tup, can reduce and hit bounce-back guaranteeing effectively to control maximum hitting power on the basis that blow energy is constant, extends the hammering time, improves the pile penetration of piling, can effectively protect concrete prefabricated pile head.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, the utility model comprises main ram head 1 and secondary tup 2, secondary tup 2 overlays on main ram head 1, between main ram head 1 and secondary tup 2, is provided with the first absorbing flexible member 3, by elastic connecting component 4, connects into an integral body between main ram head 1 and secondary tup 2.
Secondary tup 2 is formed by stacking by least two tups 5,6, between tup 5,6, is provided with the second absorbing flexible member 7.

Claims (4)

1. a pile hammer combines tup, it is characterized in that: comprise main ram head and secondary tup, secondary tup overlays on the main ram head, between main ram head and secondary tup, is provided with the first absorbing flexible member, by elastic connecting component, connects into an integral body between main ram head and secondary tup.
2. a kind of pile hammer according to claim 1 combines tup, and it is characterized in that: described secondary tup is formed by stacking from top to bottom successively by least one tup.
3. a kind of pile hammer combination tup according to claim 2, is characterized in that: between the tup of described secondary tup, be provided with the second absorbing flexible member.
4. a kind of pile hammer combination tup according to claim 2, is characterized in that: between the adjacent tup of described secondary tup, be respectively arranged with the second absorbing flexible member.
CN2013203105754U 2013-06-02 2013-06-02 Combined hammer head of pile hammer Expired - Lifetime CN203307806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203105754U CN203307806U (en) 2013-06-02 2013-06-02 Combined hammer head of pile hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203105754U CN203307806U (en) 2013-06-02 2013-06-02 Combined hammer head of pile hammer

Publications (1)

Publication Number Publication Date
CN203307806U true CN203307806U (en) 2013-11-27

Family

ID=49614024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203105754U Expired - Lifetime CN203307806U (en) 2013-06-02 2013-06-02 Combined hammer head of pile hammer

Country Status (1)

Country Link
CN (1) CN203307806U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106878A (en) * 2019-05-16 2019-08-09 徐州基桩工程公司 A kind of piling machine tup
CN113789783A (en) * 2021-09-29 2021-12-14 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106878A (en) * 2019-05-16 2019-08-09 徐州基桩工程公司 A kind of piling machine tup
CN113789783A (en) * 2021-09-29 2021-12-14 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device
CN113789783B (en) * 2021-09-29 2022-08-26 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device

Similar Documents

Publication Publication Date Title
CN103526721B (en) A kind of permeable pile foundation groynes
CN204212145U (en) A kind of precast concrete combination sheet pile
CN203307806U (en) Combined hammer head of pile hammer
CN102733377A (en) Method for constructing concrete pile
CN103114585A (en) Prestressed prefabricated pile tip structure
CN201581394U (en) Large pile toe grout-injection precast pile
CN201306333Y (en) Intelligent hydraulic impactor
CN203256748U (en) Pre-stressed concrete pipe/square pile grouting device
CN205875154U (en) Automatic pile hammer of pile driver punches a hole
CN204626777U (en) A kind of flexible shear structure connecting girder steel and concrete slab
CN104404959B (en) A kind of hydraulic pile hammer combination tup
CN2841769Y (en) Compound pile cover
CN105113507A (en) Hydraulic pile hammer
CN204311434U (en) A kind of precast concrete combination sheet pile
CN102071677A (en) Fully prestressed concrete solidly hammered picket-free square pile
CN102808419A (en) Combined pile foundation structure
CN202577289U (en) Prestressed concrete pipe pile with easiness for pile sinking
CN202247841U (en) Flat bottom multifunctional heavy hammer
CN201148617Y (en) Wrapping opening-shaped pile tip
CN205347889U (en) Concrete pile - plain concrete stake partition conbination formula composite foundation
CN204849764U (en) Continuous type static pressure stake machine
CN2828142Y (en) Wolf tooth bar building pile
CN210140827U (en) Hammer head of pile driver
CN207862932U (en) Firm hydraulic pile equipment for building
CN104929122B (en) Continuous static pile driver

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160415

Address after: 88 No. 226625 Jiangsu city of Nantong Province on economic and Technological Development Zone of Haian Road

Patentee after: CHINA FORGING MACHINERY Co.,Ltd.

Address before: 102, room 226600, unit 16, Jinhai International Garden, Haian County, Nantong, Jiangsu

Patentee before: NANTONG HAIZHUO CNC EQUIPMENT Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20131127

CX01 Expiry of patent term