CN203303794U - Waste gas treatment device for hot dip galvanizing process of road member - Google Patents
Waste gas treatment device for hot dip galvanizing process of road member Download PDFInfo
- Publication number
- CN203303794U CN203303794U CN2013203371131U CN201320337113U CN203303794U CN 203303794 U CN203303794 U CN 203303794U CN 2013203371131 U CN2013203371131 U CN 2013203371131U CN 201320337113 U CN201320337113 U CN 201320337113U CN 203303794 U CN203303794 U CN 203303794U
- Authority
- CN
- China
- Prior art keywords
- hot dip
- dip galvanizing
- smoke abatement
- emission
- galvanizing process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Coating With Molten Metal (AREA)
Abstract
The utility model discloses a waste gas treatment device for a hot dip galvanizing process of a road member. The waste gas treatment device comprises a smoke removal tower and a fan, wherein a water inlet and a water outlet are arranged on the smoke removal tower; a spray nozzle is arranged at the upper part inside the smoke removal tower; a collecting tank is arranged at the lower part inside the smoke removal tower; the water inlet is connected with the spray nozzle; the water outlet is connected with the collecting tank; an exhaust chimney is arranged at the top of the smoke removal tower; a ventilating pipeline of which an opening is formed above an activating pool is arranged at the lower part of the smoke removal tower; the fan is arranged on the ventilating pipeline. After the waste gas treatment device is adopted, emission of the waste gas is less; no smoke is generated; normal life of nearby residents is not affected; the environmental requirements are met.
Description
Technical field
The utility model relates to a kind of hot dip galvanizing process, specifically a kind of emission-control equipment of the hot dip galvanizing process for road component.
Background technology
Galvanizing also claims galvanizing by dipping, is that steel component immerses a kind of method that obtains metal cladding in the zinc liquid of melting.Along with high voltage power transmission, traffic, communication career develop rapidly, more and more higher to the steel and iron parts requirement of shelter, the galvanizing demand also constantly increases.
Traditional hot dip galvanizing process process is: workpiece → degreasing → washing → pickling → wash → soak helps plating solvent → drying and forewarm → galvanizing → arrangement → cooling → rinsing → drying → check.Wherein, soak fluxing agent and can remain on before immersion plating workpiece and have certain activity and avoid secondary oxidation, be combined with matrix to strengthen coating, fluxing agent also claims solvent, can remain on before immersion plating workpiece and have certain activity and avoid secondary oxidation, is combined with matrix with enhancing coating.Drying and forewarm be for prevent workpiece when the immersion plating because temperature sharply raises and is out of shape, and remove residual moisture, prevent quick-fried zinc, cause that zinc liquid is quick-fried to be spattered, preheating is generally 80~140 ℃.During galvanizing, to control zinc liquid temperature, immersion plating time and the speed of workpiece from drawing zinc liquid well.The speed of drawing is generally 1.5 meters/min.Temperature is too low, zinc liquid poor fluidity, and coating is thick and inhomogeneous, easily produces sagging, and presentation quality is poor; Temperature is high, zinc liquid good fluidity, and zinc liquid easily breaks away from workpiece, and reduce sagging and elephant skin phenomenon and occur, strong adhesion, coating is thin, and outward appearance is good, and production efficiency is high; But excess Temperature, workpiece and zinc pot iron loss are serious, produce a large amount of cadmias, affect the zinc-impregnating layer quality and easily cause aberration to make surface color ugly, and the zinc consumption is high.Zinc coating thickness depends on zinc liquid temperature, galvanizing time, steel material and zinc liquid composition.General producer, in order to prevent the workpiece high temperature deformation and to reduce because iron loss causes cadmia, all adopts 450~470 ℃, 0.5~1.5min.Arrangement is that after plating, arrangement is mainly to remove the remaining zinc in surface and list edge to workpiece, with adopting galvanizing special use electromagnetic shaker to complete.When cooling, generally use water-cooled, but temperature can not be too low also can not be too high, generally be not less than 30 ℃ not higher than 70 ℃.The shortcoming of this hot dip galvanizing process is: in pickling with soak and help the plating solvent when (activation), toxic emission is serious, has affected near resident normal life, does not meet environmental requirement.
Summary of the invention
The problem existed in order to overcome prior art, the purpose of this utility model is to provide a kind of emission-control equipment of the hot dip galvanizing process for road component, adopt this emission-control equipment after toxic emission few, there is no smog, near not affecting, resident's normal life, do not meet environmental requirement.
The purpose of this utility model is achieved through the following technical solutions:
A kind of emission-control equipment of the hot dip galvanizing process for road component, it is characterized in that: emission-control equipment comprises smoke abatement tower and blower fan, on the smoke abatement tower, be provided with water inlet and delivery port, be provided with water fog applicator at smoke abatement tower internal upper part, bottom is provided with collecting-tank in the smoke abatement tower; Water inlet is connected with water fog applicator, and delivery port is connected with collecting-tank; At the smoke abatement top of tower, be provided with exhaust chimney; In smoke abatement tower bottom, be provided with opening and be positioned at the ventilation shaft above activating tank, blower fan is arranged on ventilation shaft.
In the utility model, water fog applicator is arranged on smoke abatement tower internal upper part zone line.Water fog applicator is circular shower nozzle.Delivery port is connected with the import of water treatment facilities by pipeline, and the outlet of water treatment facilities is connected with water inlet by pipeline.
In the utility model, emission-control equipment collects the flue gas produced in activating tank, and will discharge through the waste gas that water smoke purifies by exhaust chimney, pollutes littlely, does not affect near resident normal life, does not meet environmental requirement.Waste water can recycle by water treatment facilities simultaneously, energy-conserving and environment-protective.
Adopt the utility model to make the hot dip galvanizing process energy-conserving and environment-protective, toxic emission meets the requirements, and reduces the impact on surrounding environment.
The utility model is applicable in the hot dip galvanizing process of the road components such as scaffold, electric pole.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
A kind of emission-control equipment of the hot dip galvanizing process for road component, see Fig. 1, emission-control equipment comprises smoke abatement tower 11 and blower fan 12, on the smoke abatement tower, be provided with water inlet 13 and delivery port 14, at smoke abatement tower internal upper part, be provided with water fog applicator 15, water fog applicator is arranged on smoke abatement tower internal upper part zone line, and water fog applicator is circular shower nozzle.Bottom is provided with collecting-tank 16 in the smoke abatement tower; Water inlet is connected with water fog applicator, and delivery port is connected with collecting-tank; At the smoke abatement top of tower, be provided with exhaust chimney 17; In smoke abatement tower bottom, be provided with opening 19 and be positioned at the ventilation shaft 18 above activating tank 3, blower fan is arranged on ventilation shaft.Delivery port is connected with the import of water treatment facilities by pipeline, and the outlet of water treatment facilities is connected with water inlet by pipeline, and waste water can recycle by water treatment facilities, energy-conserving and environment-protective.
The utility model collects the flue gas produced in activating tank, and will discharge through the waste gas that water smoke purifies by exhaust chimney, pollutes littlely, does not affect near resident normal life, does not meet environmental requirement.
Claims (4)
1. emission-control equipment for the hot dip galvanizing process of road component, it is characterized in that: this emission-control equipment comprises smoke abatement tower (11) and blower fan (12), on smoke abatement tower (11), be provided with water inlet (13) and delivery port (14), at smoke abatement tower (11) internal upper part, be provided with water fog applicator (15), bottom is provided with collecting-tank (16) in smoke abatement tower (11); Water inlet (13) is connected with water fog applicator (15), and delivery port (14) is connected with collecting-tank (16); At smoke abatement tower (11) top, be provided with exhaust chimney (17); In smoke abatement tower (11) bottom, be provided with the ventilation shaft (18) that opening (19) is positioned at activating tank (3) top, blower fan (12) is arranged on ventilation shaft (18).
2. the emission-control equipment of the hot dip galvanizing process for road component according to claim 1, it is characterized in that: water fog applicator (15) is arranged on smoke abatement tower (11) internal upper part zone line.
3. the emission-control equipment of the hot dip galvanizing process for road component according to claim 1, it is characterized in that: described water fog applicator (15) is circular shower nozzle.
4. the emission-control equipment of the hot dip galvanizing process for road component according to claim 1, it is characterized in that: delivery port (14) is connected with the import of water treatment facilities by pipeline, and the outlet of water treatment facilities is connected with water inlet (13) by pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203371131U CN203303794U (en) | 2013-06-13 | 2013-06-13 | Waste gas treatment device for hot dip galvanizing process of road member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203371131U CN203303794U (en) | 2013-06-13 | 2013-06-13 | Waste gas treatment device for hot dip galvanizing process of road member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203303794U true CN203303794U (en) | 2013-11-27 |
Family
ID=49610032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203371131U Expired - Fee Related CN203303794U (en) | 2013-06-13 | 2013-06-13 | Waste gas treatment device for hot dip galvanizing process of road member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203303794U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103263813A (en) * | 2013-06-13 | 2013-08-28 | 句容恒达金属制品有限公司 | Waste gas treatment device used in hot galvanizing process of road member |
-
2013
- 2013-06-13 CN CN2013203371131U patent/CN203303794U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103263813A (en) * | 2013-06-13 | 2013-08-28 | 句容恒达金属制品有限公司 | Waste gas treatment device used in hot galvanizing process of road member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109881133A (en) | A kind of electric power tower component hot dip galvanizing process | |
CN103938142B (en) | A kind of thinning ammonium-salt-free plating assistant agent of solvent technique heat galvanizing coating | |
CN203700474U (en) | Hot-dip galvanizing ring-type production line | |
CN203470253U (en) | Automatic Dacromet spraying curing system | |
CN104785426A (en) | Steel volute powder spraying process method | |
CN103643246A (en) | Hot-dip galvanizing production line pretreatment acid mist sealing, collecting and treating system | |
CN107740021A (en) | A kind of steel fluxing agent | |
CN107142435A (en) | Power iron fitting hot dip galvanizing process | |
CN203303794U (en) | Waste gas treatment device for hot dip galvanizing process of road member | |
CN206384832U (en) | A kind of online cyclic regeneration device of hydrochloric acid | |
CN109504928A (en) | Electric power tower steelwork hot galvanizing production method | |
CN103263813A (en) | Waste gas treatment device used in hot galvanizing process of road member | |
CN103276334A (en) | Hot galvanizing process used for road component and capable of reducing waste gas emission | |
CN102676974A (en) | Thermal spraying galvanizing method of thin plate | |
CN101928906B (en) | Method for wiping galvanized steel wire | |
CN201659058U (en) | Automated water-whirling paint-spraying system | |
CN108315677B (en) | Hot galvanizing process for communication tower | |
CN205868673U (en) | Spraying chamber | |
CN105734475A (en) | Medium solvent plating assisting method for galvanizing process | |
CN205368474U (en) | Zinc -plating flue gas recycle system | |
CN109594030A (en) | One kind exempting from pickling hot dip galvanizing process | |
CN209024621U (en) | Degreasing unit is used in a kind of metal aluminising production | |
CN107475759B (en) | A kind of zincincation of acid suppression mist | |
CN108531839A (en) | A kind of environment-friendly type hot-dip galvanizing technique | |
CN201390779Y (en) | Heat recovery system of zincification production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131127 Termination date: 20150613 |
|
EXPY | Termination of patent right or utility model |