CN203298964U - Multi-pipe steel ball falling test device - Google Patents

Multi-pipe steel ball falling test device Download PDF

Info

Publication number
CN203298964U
CN203298964U CN2013203716762U CN201320371676U CN203298964U CN 203298964 U CN203298964 U CN 203298964U CN 2013203716762 U CN2013203716762 U CN 2013203716762U CN 201320371676 U CN201320371676 U CN 201320371676U CN 203298964 U CN203298964 U CN 203298964U
Authority
CN
China
Prior art keywords
whereabouts
steel ball
straight tube
falling
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203716762U
Other languages
Chinese (zh)
Inventor
吴昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Mingzhu Steel Ball Co Ltd
Original Assignee
Wuxi Mingzhu Steel Ball Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Mingzhu Steel Ball Co Ltd filed Critical Wuxi Mingzhu Steel Ball Co Ltd
Priority to CN2013203716762U priority Critical patent/CN203298964U/en
Application granted granted Critical
Publication of CN203298964U publication Critical patent/CN203298964U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a multi-pipe steel ball falling test device, which comprises a spiral elevator and three falling straight pipes, wherein the top part of the elevator is provided with a rolling platform, the spiral elevator is arranged in a tilted manner, the top end of the spiral elevator is connected with the top part of the first falling straight pipe, the second falling straight pipe and the third falling straight pipe are additionally arranged outside the first falling straight pipe in sequence, and the second and third falling straight pipes are respectively connected with the top part of the spiral elevator. The multi-pipe steel ball falling test device has the beneficial effects that the drop pipes and steel ball tracks corresponding to the sizes are arranged, the conditions of relevant drop tests are satisfied, requirements on steel balls of different specifications can be met, the bypass detection is facilitated, the success operation of the steel ball drop test can be guaranteed, the multi-pipe steel ball falling test device can be used for drop tests of steel balls with different diameter ranges and can finish the transmission through the spiral elevator, and the efficiency of conducting field tests on steel balls of different specifications is improved.

Description

A kind of multi-pipeline steel ball whereabouts proving installation
Technical field
The utility model relates to steel ball checkout equipment technical field, relates in particular to a kind of multi-pipeline steel ball whereabouts proving installation.
Background technology
Steel ball is widely used in the fields such as bearing, five metals, electronics, iron skill, plant equipment, electric power, mine, metallurgy, and its manufacture craft comprises punching press, tarry matter, quenching, hard grind, outward appearance, lappingout, cleaning, antirust, product packing.The rear operation of steel ball production is that steel ball cleans automatically, outward appearance detects (rejecting unacceptable product), antirust, counting packing, is all the key that affect steel ball quality, the detection of the aspects such as the steel ball appearance detection mainly comprises surface tear, gets rusty, pimple.it is to produce the specialized equipment as fall-down test that the enterprise of steel ball adopts be used to guaranteeing steel ball product quality and serviceable life that steel ball wherein falls equipment, existing same category of device generally adopts the conveying devices such as chain lifting, and shape and the structure of ball test support and drop pipeline have been ignored, for example, these structures can only be delivered to steel ball from the conveying equipment bottom point to be fallen at top stably, this makes all steel balls also only have a kind of detection mode, i.e. pipeline, a kind of height and identical drop number, so can't meet the testing requirement that the steel ball user is different.Simultaneously, because of equipment only by a duct test, the different and efficiency of impact test of the specification that is easy to the invar ball.Therefore, for above aspect, need to make rational improvement.
The utility model content
The purpose of this utility model is to provide a kind of steel ball that meets different size, is conducive to realize shunting detection, can guarantees the multi-pipeline steel ball whereabouts proving installation that the steel ball fall-down test is carried out smoothly, to solve many deficiencies of prior art.
The purpose of this utility model is carried out specific implementation by the following technical programs:
A kind of multi-pipeline steel ball whereabouts proving installation, comprise screw elevator and three whereabouts straight tubes, be positioned at the screw elevator top roller tray is set, described screw elevator is obliquely installed and its top and the first straight tube top, whereabouts join, and is positioned at the first straight tube outside, whereabouts and sets up successively the second whereabouts straight tube, the 3rd whereabouts straight tube and this two straight tubes and with the screw elevator top, join respectively.
The caliber that the length of described the second whereabouts straight tube and the 3rd whereabouts straight tube is 3.5m and the 3rd whereabouts straight tube equals the twice of the first whereabouts straight tube caliber, be positioned at the second whereabouts straight tube and with collecting bin, be connected respectively with the lower end of the 3rd whereabouts straight tube, be positioned at the second height spin runway and first and highly spin runway middle part be installed respectively by a gate.
The beneficial effect of multi-pipeline steel ball described in the utility model whereabouts proving installation is:
⑴ by drop pipeline and steel ball runway that correspondingly-sized is set, met the condition of relevant fall-down test, can meet different size steel ball, be conducive to realize that shunting detects, can guarantee that the steel ball fall-down test carries out smoothly, can be used in the different steel ball of diameter range and do drop test and complete and transmit action by screw elevator;
⑵ structure is convenient to install, and because the steel ball that has the every kind of specification of producing now all must put into production in enormous quantities again after fall-down test, thereby this equipment is conducive to promote the quality of steel ball product.
⑶ by the drop pipeline structure of three different tube diameters is set, and in conjunction with two collecting bins, improved the efficiency that different size carries out site test.
The accompanying drawing explanation
Below according to drawings and embodiments the utility model is described in further detail.
Fig. 1 is the structural drawing of the described multi-pipeline steel ball of the utility model embodiment whereabouts proving installation.
In figure: 1, screw elevator; 2, the second height spin runway; 3, the first height spin runway; 4, the first whereabouts straight tube; 5, the second whereabouts straight tube; 6, the 3rd whereabouts straight tube; 7, collecting bin; 8, rolling baffle plate; 9, gate.
Embodiment
as shown in Figure 1, the described multi-pipeline steel ball of the utility model embodiment whereabouts proving installation, comprise screw elevator 1 and three whereabouts straight tubes, be positioned at screw elevator 1 top roller tray is set, described screw elevator 1 is obliquely installed and its top and the first whereabouts straight tube 4 tops join, be positioned at the first whereabouts straight tube 4 outsides and set up successively the second whereabouts straight tube 5, the 3rd whereabouts straight tube 6 and this two straight tubes join with screw elevator 1 top respectively, the caliber that the second whereabouts straight tube 5 wherein and the length of the 3rd whereabouts straight tube 6 are 3.5m and the 3rd whereabouts straight tube 6 equals the twice of the first whereabouts straight tube 4 calibers.
Between the first whereabouts straight tube 4 and screw elevator 1, be provided with two spin runways, namely be arranged at the second height spin runway 2 and the first height spin runway 3 that is arranged at top at middle part, be positioned at the second whereabouts straight tube 5 and with collecting bin 7, be connected respectively with the lower end of the 3rd whereabouts straight tube 6;
Simultaneously, the roller tray outer edge that is positioned at screw elevator 1 top is installed rolling baffle plate 8, and a gate 9 is installed respectively at wherein the second height spin runway 2 and the first height spin runway 3 middle parts.

Claims (4)

1. multi-pipeline steel ball whereabouts proving installation, comprise screw elevator and three whereabouts straight tubes, it is characterized in that: be positioned at the screw elevator top roller tray is set, described screw elevator is obliquely installed and its top and the first straight tube top, whereabouts join, and is positioned at the first straight tube outside, whereabouts and sets up successively the second whereabouts straight tube, the 3rd whereabouts straight tube and this two straight tubes and with the screw elevator top, join respectively.
2. a kind of multi-pipeline steel ball as claimed in claim 1 whereabouts proving installation is characterized in that: the caliber that the length of described the second whereabouts straight tube and the 3rd whereabouts straight tube is 3.5m and the 3rd whereabouts straight tube equals the twice of the first whereabouts straight tube caliber.
3. a kind of multi-pipeline steel ball as claimed in claim 1 whereabouts proving installation, is characterized in that: be positioned at the second whereabouts straight tube and with collecting bin, be connected respectively with the lower end of the 3rd whereabouts straight tube.
4. a kind of multi-pipeline steel ball as claimed in claim 1 whereabouts proving installation, is characterized in that: in the middle part of being positioned at the second height spin runway and the first height spin runway, a gate is installed respectively.
CN2013203716762U 2013-06-26 2013-06-26 Multi-pipe steel ball falling test device Expired - Fee Related CN203298964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203716762U CN203298964U (en) 2013-06-26 2013-06-26 Multi-pipe steel ball falling test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203716762U CN203298964U (en) 2013-06-26 2013-06-26 Multi-pipe steel ball falling test device

Publications (1)

Publication Number Publication Date
CN203298964U true CN203298964U (en) 2013-11-20

Family

ID=49574969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203716762U Expired - Fee Related CN203298964U (en) 2013-06-26 2013-06-26 Multi-pipe steel ball falling test device

Country Status (1)

Country Link
CN (1) CN203298964U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323203A (en) * 2013-06-26 2013-09-25 无锡明珠钢球有限公司 Multi-pipeline steel ball falling test device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323203A (en) * 2013-06-26 2013-09-25 无锡明珠钢球有限公司 Multi-pipeline steel ball falling test device

Similar Documents

Publication Publication Date Title
CN203298964U (en) Multi-pipe steel ball falling test device
CN203298960U (en) Steel ball free falling test equipment
CN203298967U (en) Dual-pipe steel ball free falling test equipment
CN203298971U (en) Combined type steel ball test platform
CN203323988U (en) Steel ball falling testing apparatus with characteristic of convenient dismounting
CN203298966U (en) Steel ball falling and impact test device
CN203298969U (en) Steel ball testing device with V-shaped falling steel pipe
CN203298958U (en) Bidirectional single-pipe steel ball test device
CN103323208B (en) A kind of steel ball drop and collision test device
CN103323203A (en) Multi-pipeline steel ball falling test device
CN203298963U (en) Steel ball falling detection device having pyramid-shaped structure
CN203652728U (en) Shorter carbon block conveyer
CN203422208U (en) Steel ball dropping test device
CN203298970U (en) Bidirectional inclined steel ball tumbling test device
CN203298959U (en) Bidirectional transmission type steel ball falling test device
CN103335901A (en) Steel ball free fall device
CN203298968U (en) Steel ball falling test device with bidirectional multiple test point
CN203298962U (en) Steel ball test device capable of conducting corrosion resisting test
CN203405317U (en) Novel steel ball testing apparatus
CN203298961U (en) H-shaped bracket type steel ball testing device
CN103353384A (en) Steel ball drop test apparatus convenient for assembly and disassembly
CN103323205A (en) Device used for steel ball drop test
CN203479490U (en) Steel-ball drop test device with various test heights
CN103335811A (en) Steel ball falling test device with bidirectional multiple testing points
CN203455150U (en) Device used for free fall of steel balls

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20140626

EXPY Termination of patent right or utility model