CN203296393U - Spreader connector for lifting - Google Patents

Spreader connector for lifting Download PDF

Info

Publication number
CN203296393U
CN203296393U CN2013202884830U CN201320288483U CN203296393U CN 203296393 U CN203296393 U CN 203296393U CN 2013202884830 U CN2013202884830 U CN 2013202884830U CN 201320288483 U CN201320288483 U CN 201320288483U CN 203296393 U CN203296393 U CN 203296393U
Authority
CN
China
Prior art keywords
connector
lifter
utility
model
spreader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202884830U
Other languages
Chinese (zh)
Inventor
王龙
魏崴
高俊岳
赵园涛
温建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Wuyang Construction Machinery Co ltd
Original Assignee
SHANGHAI YESHENG ELECTROMECHANICAL CONTROL TECHNOLOGY Co Ltd
Guangzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YESHENG ELECTROMECHANICAL CONTROL TECHNOLOGY Co Ltd, Guangzhou Construction Co Ltd filed Critical SHANGHAI YESHENG ELECTROMECHANICAL CONTROL TECHNOLOGY Co Ltd
Priority to CN2013202884830U priority Critical patent/CN203296393U/en
Application granted granted Critical
Publication of CN203296393U publication Critical patent/CN203296393U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a spreader connector for lifting and belongs to the technical field of civil engineering construction devices. The spreader connector comprises a connector body which is two metal plates which are spaced at an interval and fixed in a parallel manner. The metal plates are in the structures of right triangles. The two parallel-arranged metal plates are fixed by welding via connection plates disposed on side surfaces. Three angles of each metal plate are respectively provided with three mounting holes. According to the utility model, two lifters can be connected at the same time; when one lifter encounters an obstacle during a moving process, the other lifter can be placed at the other end of the obstacle; and the obstacle of a platform beam is easily kept away by changing a connection point of the spreader connector; and the spreader connector is simple in structure and good in mechanical performance; construction efficiency is greatly improved and the spreader connector can be broadly applied in the technical field of engineering construction technology.

Description

A kind of suspender connector that promotes use
Technical field
The utility model belongs to the Construction of Civil Engineering technical field of tools, is specifically related to a kind of suspender connector that promotes use.
Background technology
Development along with the economic civilization of China, improving constantly of social labor power cost, traditional architecture productive labor negative effect intensity, Construction Mode extensive style constantly shows especially: high-altitude working safety hidden danger is many, long in time limit, construction quality is difficult to guarantee, and engineering cost is high.
Under this background, the construction method for lifting whole work high above the ground is Ground Operation, has greatly subdued potential safety hazard, has improved operating environment, has improved construction quality, and has realized assembling, mechanization that structure is installed.Greatly improved the safety of efficiency of construction, construction quality and the work progress of such structure construction.Especially to current human cost rise, structure construction in the situation such as the duration is tight is significant.Have positive effect by the Construction Mode of the backwardness of manpower-intensive, extensive style to technology-intensive type, intensive advanced Construction Mode to changing current architecture production.
The installation of a lifter yet existing Integral lifting suspender connector is only arranged in pairs or groups, sometimes lifter runs into obstruction in moving process, and lifter is difficult to clear the jumps, and can not untie from steel hinge silk promoting thing again, this brings very large puzzlement to construction, has affected efficiency of construction.
The utility model content
The technical problems to be solved in the utility model is to provide a kind of simple in structure, the hoisting hanger connector that can change flexibly lifter.
In order to address the above problem, the utility model is achieved by following technical scheme:
A kind of lifting suspender connector described in the utility model, comprise connector body, and described connector body is two parallel fixing metal sheets with certain distance, and described two parallel metal sheets are welded and fixed connection by some junction plates of side; Described metal sheet is provided with three installing holes, the position shaping triangular structure of described installing hole.
Further, in order to save material, the metal sheet of described connector body is triangular structure, and leg-of-mutton three angles are that circular arc connects, and convenient the lifting while connecting can be rotated around drift angle.
Further, firm for structure, described junction plate is two, and is in the centre position of metal edges of boards, the space that certain allowed steel strand pass through is also left at the two ends of metal edges of boards.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is provided with three installing holes, can change flexibly lifter and promote in lifting process, and is simple in structure, firm.
Description of drawings
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail, wherein:
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the assembling schematic diagram of the utility model in lifting appliance.
In figure: 1-connector body, 2-metal sheet, 21-installing hole, 211-the first installing hole, 212-the second installing hole, 213-the 3rd installing hole, 3-junction plate, 4-steel strand, 5-the first lifter, 6-the second lifter.
The specific embodiment
As shown in FIG. 1 to 3, a kind of suspender connector that promotes use described in the utility model, comprise connector body 1, described connector body 1 is two parallel fixing metal sheets 2 with certain distance, this metal sheet 2 is the right angle trigonometry shape, these leg-of-mutton three angles are that circular arc connects, and in the position of three drift angles, respectively are provided with an installing hole 21; Described two parallel metal sheets 2 are by junction plate 3 by being welded and fixed, and this junction plate 3 is two, are separately fixed at the centre position of hypotenuse and a right-angle side of triangle metal sheet 2, and the both sides of junction plate 3 are also left and promoted the space that steel hinge line 4 passes through.
A kind of operating principle that promotes the suspender connector of use described in the utility model is:
during beginning, the first installing hole 211 is installed with the lifting object, the steel hinge line 4 of the second installing hole 212 and the first lifter 5 is installed fixing, the first lifter 5 will promote thing and promote, the first lifter 5 need to move along landing beam, the first lifter runs into obstruction on landing beam, lifter moves and is obstructed, place second lifter 6 at the other end of obstruction this moment, the steel hinge line 4 of the second lifter 6 is installed and is connected by the 3rd installing hole 213, the second lifter 6 fine settings, the load that promotes object all is transferred on the second lifter 6, then the steel hinge line of the first lifter 54 is removed from the second installing hole 212, promoting thing continues mobile and promotes under the drive of the second lifter 6, so just avoided easily the obstruction on the landing beam.The utility model is simple in structure, and good mechanical property has improved efficiency of construction.
Other structure of the described a kind of suspender connector that promotes use of the present embodiment is referring to prior art.
The above, it is only preferred embodiment of the present utility model, not the utility model is done any pro forma restriction, therefore every technical solutions of the utility model content that do not break away from,, all still belong in the scope of technical solutions of the utility model any modification, equivalent variations and modification that above embodiment does according to technical spirit of the present utility model.

Claims (3)

1. suspender connector that promotes use, it is characterized in that: comprise connector body, described connector body is two parallel fixing metal sheets with certain distance, and described two parallel metal sheets are welded and fixed connection by some junction plates of side; Described metal sheet is provided with three installing holes, the position shaping triangular structure of described installing hole.
2. promote according to claim 1 the suspender connector of use, it is characterized in that: the metal sheet of described connector body is triangular structure, and leg-of-mutton three angles are that circular arc connects.
3. promote according to claim 1 the suspender connector of use, it is characterized in that: described junction plate is two, and is in the centre position of metal edges of boards, and the space that certain allowed steel strand pass through is also left at the two ends of metal edges of boards.
CN2013202884830U 2013-05-23 2013-05-23 Spreader connector for lifting Expired - Fee Related CN203296393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202884830U CN203296393U (en) 2013-05-23 2013-05-23 Spreader connector for lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202884830U CN203296393U (en) 2013-05-23 2013-05-23 Spreader connector for lifting

Publications (1)

Publication Number Publication Date
CN203296393U true CN203296393U (en) 2013-11-20

Family

ID=49572414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202884830U Expired - Fee Related CN203296393U (en) 2013-05-23 2013-05-23 Spreader connector for lifting

Country Status (1)

Country Link
CN (1) CN203296393U (en)

Similar Documents

Publication Publication Date Title
CN202299465U (en) Quick adjustment device for steel beam hoisting
CN204282842U (en) A kind of segmentation steel column is installed and is connected hoisting structure
CN203296393U (en) Spreader connector for lifting
CN202992391U (en) Side edge rotating trench type vertical tee-joint for cable bridge
CN202923862U (en) Bottom support cement pier for segmentation of ship
CN203558700U (en) Novel lifting hanger
CN204344130U (en) Shield machine support boots erecting device connecting rack and this erecting device
CN203255866U (en) Lifting tool
CN202643074U (en) Tail shaft polishing lifting tool
CN203285038U (en) Working platform for cross arms of electric transmission line steel tube tower
CN204980791U (en) Shrouding about door of detachable elevator glass layer
CN203474215U (en) Marine high-strength hanger
CN203296397U (en) Base of pushing device
CN204022293U (en) A kind of crane beam constructional device
CN203474216U (en) Marine high-strength hanger
CN202769051U (en) Groove type right angular rotating cross for cable bridge
CN203903820U (en) Fixed electric hoist semi-portal crane
CN204022355U (en) A kind of crawler crane arm head
CN203269425U (en) Movable lifting equipment
CN204057749U (en) A kind of mono beam crane in bridge type
CN202990153U (en) Steel plate combined shear wall with wall passing node
CN204235035U (en) A kind of arch hexagon steel box-girder makes mold
CN203850780U (en) Cable tray connecting member
CN203653046U (en) Large-area flexible plate turning fixture
CN203541871U (en) Novel steel plate cutting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170331

Address after: 510520 Tianhe District, Guangzhou, Guang Shan Road, No. two, No. 88, No.

Patentee after: GUANGZHOU WUYANG CONSTRUCTION MACHINERY Co.,Ltd.

Address before: 510030 Yuexiu District, Guangdong Province, Guang Wei Road, No. 4, No.

Patentee before: GUANGZHOU CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee before: SHANGHAI YESHENG ELECTROMECHANICAL CONTROL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

CF01 Termination of patent right due to non-payment of annual fee