CN203287018U - Position indicator for pre-embedded casing - Google Patents
Position indicator for pre-embedded casing Download PDFInfo
- Publication number
- CN203287018U CN203287018U CN2013202888526U CN201320288852U CN203287018U CN 203287018 U CN203287018 U CN 203287018U CN 2013202888526 U CN2013202888526 U CN 2013202888526U CN 201320288852 U CN201320288852 U CN 201320288852U CN 203287018 U CN203287018 U CN 203287018U
- Authority
- CN
- China
- Prior art keywords
- embedding
- sleeve pipe
- orientator
- pipe pre
- collar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a position indicator for pre-embedded casings. The position indicator is used for positioning pre-embedded vertical casings of floors, and comprises a base, an infrared emitter fixedly mounted above the base and three retractable leg supports arranged under the base. The retractable leg supports of the position indicator can adjust base directions, so that the infrared rays emitted by the infrared emitter are vertical, thereby identifying accurate positions for embedding the casings, or opening holes at the accurate positions. Consequently, the opened holes at corresponding positions of the plurality of floors are located at a straight line of the infrared ray, thereby guaranteeing an accurate positioning for the opened holes and being small in an error rate. Furthermore, just one positioning can meet demands of holes positioning of the plurality of floors, thereby greatly improving production efficiency.
Description
Technical field
The utility model relates to a kind of orientator, relates in particular to a kind of sleeve pipe pre-embedding orientator.
Background technology
Kept in the building floor work progress in the past, the mounting hole majority of drainpipe is to measure by simple, then reserve mounting hole, the defects such as the site error in floor gap hole is larger can easily appear like this, the drawbacks such as bending or distortion after the accumulation of error of the mounting hole between a plurality of floors can cause pipeline that difficulty or supplying drainage are installed installing.
The utility model content
For the deficiencies in the prior art, the technical problems to be solved in the utility model is to provide a kind of process for correspondence position between different floors being carried out perforate pinpoint sleeve pipe pre-embedding orientator is provided.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of sleeve pipe pre-embedding orientator, be used for the pre-buried vertical sleeve pipe of floor is positioned, described sleeve pipe pre-embedding orientator comprises pedestal, be fixedly installed in the infrared transmitter of described pedestal upside, be located at three telescopic heel braces of described pedestal downside.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, the launching site of described infrared transmitter is positioned at top, and the end face of described pedestal is leveling surface, and the ray that described infrared transmitter is launched is perpendicular to this leveling surface.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, the motion bar that described heel brace comprises the fixed pole affixed with described pedestal, docks with described fixed pole by the collar.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, described fixed pole is connected with described collar spiral.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, described motion bar is connected with described collar spiral.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, mutually peg graft between described fixed pole and motion bar, and by described collar locking.
As a kind of improvement of a kind of sleeve pipe pre-embedding orientator of the utility model technical scheme, the end of described heel brace is cone tip shape.
the beneficial effects of the utility model are: the scalable heel brace of sleeve pipe pre-embedding orientator of the present utility model can be adjusted pedestal direction state and make the infrared-ray that infrared transmitter is launched be in vertical state, thereby can built-in pipe be set or perforate be carried out in the position of centering process by capturing position, make the perforate of a plurality of floor correspondence position be positioned at straight line place, infrared-ray place, namely guarantee each floor corresponding aperture position consistency and at same straight line place, guarantee the perforate registration, error rate is little, and one-time positioning can meet the perforate location between multi-story, greatly enhance productivity.Simultaneously, the supplying drainage in later stage is quick and easy for installation, and after installing, pipeline is straight.
Description of drawings
Fig. 1 is the perspective view of the utility model sleeve pipe pre-embedding orientator embodiment.
Fig. 2 is the front view of the utility model sleeve pipe pre-embedding orientator.
Fig. 3 is the vertical view of the utility model sleeve pipe pre-embedding orientator.
Embodiment
Further illustrate embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of sleeve pipe pre-embedding orientator of the utility model, it is used for the pre-buried vertical sleeve pipe of floor is positioned, and described sleeve pipe pre-embedding orientator comprises pedestal 10, be fixedly installed in the infrared transmitter 12 of described pedestal 10 upsides, be located at three telescopic heel braces 15 of described pedestal 10 downsides.The scalable heel brace 15 of sleeve pipe pre-embedding orientator can be adjusted pedestal 10 direction states and make the infrared-ray that infrared transmitter is launched be in vertical state, thereby can built-in pipe be set or perforate be carried out in the position of centering process by capturing position, make the perforate of a plurality of floor correspondence position be positioned at straight line place, infrared-ray place, namely guarantee each floor corresponding aperture position consistency and at same straight line place, guarantee that perforate registration, error rate are little, and one-time positioning can meet the perforate location between multi-story, greatly enhances productivity.Simultaneously, the supplying drainage in later stage is quick and easy for installation, and after installing, pipeline is straight.
More preferably, the launching site of described infrared transmitter 12 is positioned at top, and the end face of described pedestal 10 is leveling surface 11, and the ray that described infrared transmitter 12 is launched is perpendicular to this leveling surface 11.Just can guarantee that 12 divergent-rays of infrared transmitter are in vertical state after calibrating this leveling surface 11, make infrared ray as vertical datum line, thereby carry out perforate or built-in pipe according to this infrared ray, make the installation of later stage supplying drainage that all accurate and little through-flooring holes of error of position and angle are provided.
More preferably, described heel brace 15 motion bar 19 that comprises the fixed pole 16 affixed with described pedestal 10, dock with described fixed pole 16 by the collar 18.The collar 18 connects fixed pole 16 and motion bar 19, thereby the scalable adjusting of motion bar makes this device also can be adjusted to its pedestal 10 on out-of-level ground and keeps horizontality, can guarantee that ray vertically provides accurate vertical direction location, provides position and directional reference to perforation.
More preferably, described fixed pole 16 is connected with the described collar 18 spirals.The rotation collar 18 can make fixed pole and motion bar move along its axial stretching each other, thereby makes heel brace have flexible ability and be adapted to arrange on out-of-flatness or out-of-level ground this device and also can adjust ray and launch for vertical.Motion bar and the collar can be affixed, can be also that spiral connects.When spiral connects can be two head threads of the collar in the same way, can be also reverse.In the time of in the same way, need to have a mind to make motion bar to produce rotation; Need only the rotation collar in the time of oppositely, thereby realize the fine setting of heel brace length.
More preferably, described motion bar 19 is connected with the described collar 18 spirals, and fixed pole 16 and the collar can affixed or loose joints, and when affixed, the rotary moveable bar can be regulated flexiblely, and during loose joint, adjustment collar and motion bar carry out telescopic adjustment simultaneously.
More preferably, mutually peg graft between described fixed pole 16 and motion bar 19, and by the collar 18 lockings, a bar such as fixed pole were established screw thread and were connected with collar thread therein this moment, the collar is that the conical surface contacts with the body of rod, the collar can lock or unclamp during along the moving axially of bar, from but with the collar, it is locked after the flexible fixed length of fixed pole and motion bar.
More preferably, the end of described heel brace 15 is cone tip shape, and making itself and ground is that point contacts, thereby is convenient to supporting and location and Level tune.
Above disclosed is only preferred embodiment of the present utility model, certainly can not limit with this interest field of the utility model, and the equivalent variations of therefore according to the utility model claim, doing, still belong to the scope that the utility model is contained.
Claims (7)
1. sleeve pipe pre-embedding orientator, be used for the pre-buried vertical sleeve pipe of floor is positioned, it is characterized in that: described sleeve pipe pre-embedding orientator comprises pedestal, be fixedly installed in the infrared transmitter of described pedestal upside, be located at three telescopic heel braces of described pedestal downside.
2. sleeve pipe pre-embedding orientator according to claim 1, it is characterized in that: the launching site of described infrared transmitter is positioned at top, and the end face of described pedestal is leveling surface, and the ray that described infrared transmitter is launched is perpendicular to this leveling surface.
3. sleeve pipe pre-embedding orientator according to claim 1 is characterized in that: the motion bar that described heel brace comprises the fixed pole affixed with described pedestal, docks with described fixed pole by the collar.
4. sleeve pipe pre-embedding orientator according to claim 3, it is characterized in that: described fixed pole is connected with described collar spiral.
5. sleeve pipe pre-embedding orientator according to claim 3, it is characterized in that: described motion bar is connected with described collar spiral.
6. sleeve pipe pre-embedding orientator according to claim 3, is characterized in that: mutually peg graft between described fixed pole and motion bar, and by the described collar, lock.
7. according to claim 1 or 3 described sleeve pipe pre-embedding orientators, it is characterized in that: the end of described heel brace is cone tip shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202888526U CN203287018U (en) | 2013-05-24 | 2013-05-24 | Position indicator for pre-embedded casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202888526U CN203287018U (en) | 2013-05-24 | 2013-05-24 | Position indicator for pre-embedded casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203287018U true CN203287018U (en) | 2013-11-13 |
Family
ID=49543376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202888526U Expired - Fee Related CN203287018U (en) | 2013-05-24 | 2013-05-24 | Position indicator for pre-embedded casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203287018U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798010A (en) * | 2018-07-04 | 2018-11-13 | 中冶建工集团有限公司 | A kind of service sleeve locating mounting method |
CN108798009A (en) * | 2018-07-04 | 2018-11-13 | 中冶建工集团有限公司 | A kind of service sleeve positioning installation apparatus |
-
2013
- 2013-05-24 CN CN2013202888526U patent/CN203287018U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798010A (en) * | 2018-07-04 | 2018-11-13 | 中冶建工集团有限公司 | A kind of service sleeve locating mounting method |
CN108798009A (en) * | 2018-07-04 | 2018-11-13 | 中冶建工集团有限公司 | A kind of service sleeve positioning installation apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203287018U (en) | Position indicator for pre-embedded casing | |
CN207864978U (en) | A kind of civil engineering surveying apparatus | |
CN105215890B (en) | Fixing device for detecting global deformation of ancient timber structure | |
CN211528899U (en) | Digital media teaching device | |
CN207880331U (en) | A kind of easy-to-dismount Surveying Engineering tripod | |
CN212456039U (en) | Water transport engineering surveyor's level for measurement | |
CN204085522U (en) | Automatic leveling line laser line marker | |
KR101356754B1 (en) | Tripod fixing apparatus for geodetic surveying instrument | |
CN116006854B (en) | Surveying and mapping device for geological exploration | |
CN105137706A (en) | Panoramic holder | |
CN203902061U (en) | Teaching compasses for conveniently drawing concentric circles | |
CN215803300U (en) | Ground leveling auxiliary device for building construction | |
CN205642377U (en) | Full topography circular arc line projector | |
CN204883156U (en) | Pan and tilt head | |
CN206113922U (en) | Automatic perpendicular laser height finding levelling rod | |
CN206002094U (en) | A kind of level gauge | |
CN207487681U (en) | A kind of centering rod for engineering survey | |
CN211691478U (en) | Building templates link for civil engineering | |
CN106592989B (en) | A kind of tower crane built-in fitting positioning installation apparatus and its installation method | |
CN106782672A (en) | A kind of multipurpose leveling retaining mechanism | |
CN205333071U (en) | Support for surveying instrument | |
CN208670521U (en) | A kind of portable assembly mapping tripod | |
CN207432091U (en) | A kind of positioner of differential mechanism | |
CN208381711U (en) | A kind of vertical and horizontal pattern switching quick-locking device of camera shooting stabilizer | |
CN113289817A (en) | Fixing device for water-saving irrigation spray nozzle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131113 Termination date: 20190524 |