CN203284873U - Blowdown system - Google Patents

Blowdown system Download PDF

Info

Publication number
CN203284873U
CN203284873U CN2013202320185U CN201320232018U CN203284873U CN 203284873 U CN203284873 U CN 203284873U CN 2013202320185 U CN2013202320185 U CN 2013202320185U CN 201320232018 U CN201320232018 U CN 201320232018U CN 203284873 U CN203284873 U CN 203284873U
Authority
CN
China
Prior art keywords
pipe
floor drain
blowdown
main body
pool body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202320185U
Other languages
Chinese (zh)
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hengtai Construction Engineering Co., Ltd.
Original Assignee
Chengdu Jiameijia Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiameijia Science and Technology Co Ltd filed Critical Chengdu Jiameijia Science and Technology Co Ltd
Priority to CN2013202320185U priority Critical patent/CN203284873U/en
Application granted granted Critical
Publication of CN203284873U publication Critical patent/CN203284873U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Abstract

The utility model discloses a blowdown system. The blowdown system comprises a water pool body. A water inlet pipe, a floor drain blowdown pipe and a siphon blowdown pipe are arranged on the water pool body respectively. Both one end of the water inlet pipe and one end of the floor drain blowdown pipe penetrate through the water pool body and stretch out of the water pool body, both the other end of the water inlet pipe and the other end of the floor drain blowdown pipe are located in the water pool body, the siphon blowdown pipe and a strong magnetic piece are arranged at the end, located in the water pool body, of the floor drain blowdown pipe respectively, one end of the siphon blowdown pipe is connected with the floor drain blowdown pipe, the other end of the siphon blowdown pipe penetrates through the water pool body and stretches out of the water pool body, a magnetic valve is arranged in the strong magnetic piece, and a vent hole is formed in the bottom of the water pool body and corresponds to the end, located in the water pool body, of the floor drain blowdown pipe. The blowdown system is easy to operate, good in blowdown effect, not prone to being blocked, and simple in construction, has the siphon blowdown function and saves water resources.

Description

Drainage
Technical field
The utility model relates to a kind of blowdown apparatus, particularly a kind of drainage.
Background technology
In industry and civilian construction, reservoir is a kind of more common building, when it is constructed, if construction quality is bad, light cause the permanent seepage of water, heavy scrap.Water in reservoir is after the long-term accumulation of process, can cause certain pollutant, general reservoir is when carrying out blowdown, need to use the manpower control of sewage disposal, and also can't reach desirable filth-discharging effect, the situation that blowdown thoroughly will not result in blockage, brought certain impact with regard to the normal life of giving people like this, and caused the waste of manpower and material resources.
The utility model content
The purpose of this utility model just is to provide a kind of drainage, can address the above problem fully.
to achieve these goals, the technical solution adopted in the utility model is such: drainage of the present utility model, comprise the pond main body, be respectively equipped with water inlet pipe on the main body of pond, floor drain pollution-discharging pipe and siphon blowing pipe, water inlet pipe and floor drain pollution-discharging Guan Yiduan all pass outside the pond main body extends in, its other end all is positioned at the pond main body, the floor drain pollution-discharging pipe is positioned on an end of pond main body and is respectively equipped with siphon blowing pipe and strong magnetic piece, siphon blowing pipe one end is connected with the floor drain pollution-discharging pipe, its other end passes outside the pond main body extends in, be provided with electromagnetic valve in strong magnetic piece, the pond bottom part body is provided with steam vent, steam vent is corresponding with the end that the floor drain pollution-discharging pipe is positioned at the pond main body.
As preferably, the delivery port of described water inlet pipe is parallel with horizontal plane.
As preferably, described electromagnetic valve surface is provided with waterproofing course.
Compared with prior art, the utility model has the advantage of: this drainage is simple to operate, and filth-discharging effect is good, is difficult for stopping up, and has the function of siphon blowdown, saved water resource, and construction is simple.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
referring to Fig. 1, drainage of the present utility model, comprise pond main body 1, be respectively equipped with water inlet pipe 2 on pond main body 1, floor drain pollution-discharging pipe 3 and siphon blowing pipe 6, water inlet pipe 2 and floor drain pollution-discharging pipe 3 one ends all pass outside pond main body 1 extends in, its other end all is positioned at pond main body 1, floor drain pollution-discharging pipe 3 is positioned on an end of pond main body 1 and is respectively equipped with siphon blowing pipe 6 and strong magnetic piece 4, siphon blowing pipe 6 one ends are connected with floor drain pollution-discharging pipe 3, its other end passes outside pond main body 1 extends in, be provided with electromagnetic valve 5 in strong magnetic piece 4, main body 1 bottom in pond is provided with steam vent 7, steam vent 7 is corresponding with the end that floor drain pollution-discharging pipe 3 is positioned at pond main body 1, the delivery port of described water inlet pipe 2 is parallel with horizontal plane, described electromagnetic valve 5 surfaces are provided with waterproofing course.
The design of floor drain pollution-discharging pipe 3 and siphon blowing pipe 6 can be carried out double pollution discharge, can reach good filth-discharging effect; Be provided with electromagnetic valve 5 in strong magnetic piece 4, can realize the pond blowdown in the situation that water level does not meet the syphon automatic pollution discharge, effectively guaranteed blowdown work; Main body 1 bottom in pond is provided with steam vent 7, and steam vent 7 is corresponding with the end that floor drain pollution-discharging pipe 3 is positioned at pond main body 1, can reach the effect of exhaust; The delivery port of water inlet pipe 2 is parallel with horizontal plane, and is reasonable in design; Electromagnetic valve 5 surfaces are provided with waterproofing course, can play the effect of waterproof.

Claims (3)

1. drainage, comprise the pond main body, it is characterized in that: be respectively equipped with water inlet pipe on the main body of pond, floor drain pollution-discharging pipe and siphon blowing pipe, water inlet pipe and floor drain pollution-discharging Guan Yiduan all pass outside the pond main body extends in, its other end all is positioned at the pond main body, the floor drain pollution-discharging pipe is positioned on an end of pond main body and is respectively equipped with siphon blowing pipe and strong magnetic piece, siphon blowing pipe one end is connected with the floor drain pollution-discharging pipe, its other end passes outside the pond main body extends in, be provided with electromagnetic valve in strong magnetic piece, the pond bottom part body is provided with steam vent, steam vent is corresponding with the end that the floor drain pollution-discharging pipe is positioned at the pond main body.
2. drainage according to claim 1, it is characterized in that: the delivery port of described water inlet pipe is parallel with horizontal plane.
3. drainage according to claim 1, it is characterized in that: described electromagnetic valve surface is provided with waterproofing course.
CN2013202320185U 2013-05-02 2013-05-02 Blowdown system Expired - Fee Related CN203284873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202320185U CN203284873U (en) 2013-05-02 2013-05-02 Blowdown system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202320185U CN203284873U (en) 2013-05-02 2013-05-02 Blowdown system

Publications (1)

Publication Number Publication Date
CN203284873U true CN203284873U (en) 2013-11-13

Family

ID=49541244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202320185U Expired - Fee Related CN203284873U (en) 2013-05-02 2013-05-02 Blowdown system

Country Status (1)

Country Link
CN (1) CN203284873U (en)

Similar Documents

Publication Publication Date Title
CN204981294U (en) Chemistry neutralization pond waste water circulation neutralization and emission PH on -line monitoring system
CN203583504U (en) Water pumping structure for concrete layer pouring
CN203284873U (en) Blowdown system
CN205455031U (en) Hold drain bar with feedwater function
CN202850186U (en) Siphon pollution discharge system
CN203329500U (en) Sewage treatment equipment
CN202850115U (en) Vortex siphon type sewage discharge mechanism
CN203777361U (en) Sterilization cabinet drainage system
CN205557760U (en) Distribution of rain and sewage system
CN204883399U (en) Quick drainage system of intelligence building
CN203782816U (en) Secondary utilization device of flushing wastewater
CN204435491U (en) One way of life sewage reutilization device
CN205365542U (en) Carwash pond circulation rinse -system
CN202844652U (en) Inorganic sewage autonomous pollution discharge system
CN204272953U (en) Freshwater aquiculture water-exchanging system
CN204311661U (en) A kind of device for roof drainage
CN203436871U (en) Reciprocating scum scraping device
CN201865158U (en) Water-saving device for wash basin
CN202193702U (en) Sewage recycling device for septic tank
CN202117108U (en) Energy-saving automatic water suction device
CN202850117U (en) Automatic drainage water-saving storage mechanism
CN202850114U (en) Sewage discharging treatment system for recycling of sanitary wastewater
CN205329788U (en) Sewage recycling device
CN203008054U (en) Water circulation device
CN202850107U (en) Environmentally friendly sewage automatic purification device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHOU LANYING

Effective date: 20141226

Owner name: LI HUA

Free format text: FORMER OWNER: CHENGDU JIAMEIJIA TECHNOLOGY CO., LTD.

Effective date: 20141226

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610000 CHENGDU, SICHUAN PROVINCE TO: 310000 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141226

Address after: 310000 No. 12 Baisha spring, Hangzhou, Zhejiang, Xihu District

Patentee after: Li Hua

Patentee after: Zhou Lanying

Address before: 610000 Sichuan Province, Qingyang District, Jinyang Road, No. 7, building 6, building 19, No. 112

Patentee before: CHENGDU JIAMEIJIA SCIENCE & TECHNOLOGY CO., LTD.

ASS Succession or assignment of patent right

Owner name: HANGZHOU HENGTAI CONSTRUCTION ENGEERING CO., LTD.

Free format text: FORMER OWNER: LI HUA

Effective date: 20150109

Free format text: FORMER OWNER: ZHOU LANYING

Effective date: 20150109

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150109

Address after: 310000, No. 297, heart North Road, Xiaoshan District, Zhejiang, Hangzhou

Patentee after: Hangzhou Hengtai Construction Engineering Co., Ltd.

Address before: 310000 No. 12 Baisha spring, Hangzhou, Zhejiang, Xihu District

Patentee before: Li Hua

Patentee before: Zhou Lanying

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131113

Termination date: 20160502

CF01 Termination of patent right due to non-payment of annual fee