CN203284786U - Side slope anti-slide and pre-warning system with underground water collection and utilization function - Google Patents

Side slope anti-slide and pre-warning system with underground water collection and utilization function Download PDF

Info

Publication number
CN203284786U
CN203284786U CN2013202913710U CN201320291371U CN203284786U CN 203284786 U CN203284786 U CN 203284786U CN 2013202913710 U CN2013202913710 U CN 2013202913710U CN 201320291371 U CN201320291371 U CN 201320291371U CN 203284786 U CN203284786 U CN 203284786U
Authority
CN
China
Prior art keywords
side slope
hollow
warning system
antislide pile
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202913710U
Other languages
Chinese (zh)
Inventor
陈红军
张永兴
王桂林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN2013202913710U priority Critical patent/CN203284786U/en
Application granted granted Critical
Publication of CN203284786U publication Critical patent/CN203284786U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model provides a side slope anti-slide and pre-warning system with an underground water collection and utilization function. The side slope anti-slide and pre-warning system comprises a plurality of hollow anti-slide piles, a plurality of anchor rods and a water discharge pipe, wherein the anti-slide piles and the anchor rods are inserted into a side slope body; the bodies of the anchor rods are provided with steel bar stress meters; the steel bar stress meters are arranged at different depths; each hollow anti-slide pile is a hollow cylinder with an opened upper end and a closed lower end, that is to say, the hollow anti-slide pile is provided with an opened inner cavity, the upper end of the opened inner cavity is an opened end, and the lower end of the opened inner cavity is a closed end; the hollow cylinder is encircled by a cavity wall; the cavity wall has a plurality of drainage holes; after the construction is completed, the closed end is buried under the soil layer of a side slope and anchored with a bed rock inside the side slope; one end of the water discharge pipe is connected with a water pump, and the other end of the water discharge pipe is inserted into the inner cavity of the hollow cylinder through the opened end; water pumped from the water discharge pipe is delivered into a water reservoir, can be used for irrigation and can also be used as the drinking water of nearby residents after being purified.

Description

Possess underground water and collect side slope antiskid and the early warning system of utilizing function
Technical field
The invention relates to slope stabilization and landslide-proofing field, is specifically related to side slope antiskid and early warning.
Background technology
Antislide pile is to pass sliding mass to penetrate with the pile of sliding bed,, in order to a sliding force of gear gliding mass, plays stable side slope, is applicable to shallow-layer and medium-bedded landslide, is the major measure that a kind of antiskid is processed.Use antislide pile, earth volume is little, and construction need have supporting machinery equipment, and the duration is short, is a kind of Skid Resistance Measures that extensively adopts.
, according to sliding mass thickness, thrust size, waterproof requirement and execution conditions etc., usually select timber, piling bar, concrete pile or reinforcing bar (rail) concrete pile etc.Antislide pile is to utilize antislide pile to insert good ground below slide plane to the thrust of drag (anchored force) the balance slide mass of stake to the effect of sliding mass, increases its stability.Be subject to the impedance of antislide pile when sliding mass glides, make a front gliding mass reach stable state.Select timber, piling bar, concrete and reinforced concrete pile according to thickness, thrust size, waterproof requirement and the execution conditions etc. of gliding mass.Antislide pile is imbedded the following degree of depth in stratum, and by universal experience, in soft rock stratum, anchorage depth is 1/3rd of designing pile length; It is 1/4th of designing pile length in hard rock; Be 1/2nd of designing pile length in the sliding bed of soil property.When soil layer slided along bedrock surface, anchorage depth also had 2~5 times that adopt the stake footpath.The arrangement form of antislide pile has interconnective row of piles, apart from one another by row of piles, the row of piles that interval, bottom, top connect, apart from one another by anchor pile etc., the pile spacing is generally got 3~5 times an of footpath.
At present, antislide pile is all to guarantee that sliding mass does not skid off between stake be principle, and pile body adopts some anticorrosive measures to guarantee that self does not weather, and there is no the function of draining and early warning.
Summary of the invention
The purpose of this utility model is the device that has firm side slope and landslide is carried out early warning by a kind of.
For realizing that the technical scheme that the utility model purpose adopts is such, a kind of possess underground water and collect side slope antiskid and the early warning system utilize function, comprises hollow antislide pile and the anchor pole of some insertion side slope bodies, and gutter.The reinforcement stresses meter is installed on the body of rod of described anchor pole.Described reinforcement stresses meter is arranged in different depth.Described hollow antislide pile is that upper end is uncovered, the hollow cylinder of lower end closed.Be that hollow antislide pile has a uncovered inner chamber, its upper end is opening end, and lower end is blind end.Described hollow cylinder is surrounded by the chamber wall, has some weep holes (through hole) on the wall of described chamber.The opening end of described hollow antislide pile is positioned on the side slope surface.After construction was completed, described blind end was embedded under the side slope soil layer, and the slide plane that its degree of depth may exist greater than side slope, namely with the basement rock anchoring of side slope inside.One end of described gutter connects water pump, the other end is inserted in the inner chamber of described hollow cylinder through described opening end.The water that gutter is extracted out is sent in reservoir, can act on the use of irrigation, also can through after purification as near resident drinking water.
Further, near on the chamber wall of intracavity bottom, there is no weep hole, weep hole exists only near on the chamber wall of inner chamber upper end, and namely the intracavity bottom of hollow antislide pile forms a water storage well.In system duty cycle described in the utility model, the infiltration in side slope constantly penetrates into intracavity bottom by weep hole.After carrying out draining by described gutter, prevented that effectively the soil body is soft because of water logging, guaranteed to a certain extent the stability of side slope.The water that described gutter is released can guide to settlement, villages and small towns reservoir via drainage, utilizes after purified treatment.
Further, the opening end of described hollow antislide pile is installed cover plate.The upper end of the body of rod of described anchor pole 2 is equipped with backing plate.
At present, general antislide pile adopts multiple material to make, and as preferably, chamber described in the utility model wall 4 is built and formed by steel concrete, and namely described hollow antislide pile has reinforcing steel bar mechanism, and purpose is to be convenient to, at described chamber wall, the reinforcement stresses meter is installed.
Owing to along different depth, the reinforcement stresses meter being set in anchor pole and hollow antislide pile, its stress of results of regular determination.When anchor stress surpasses warning value, illustrate that slope stability is in understable state, need take measures.When hollow antislide pile stress surpasses warning value, illustrate that side slope is in the hole.
Owing to having adopted technique scheme, the utility model has been realized the several functions such as slope reinforcement, landslide early warning, groundwater use.
Description of drawings
Device of the present utility model can further illustrate by the non-limiting embodiment that accompanying drawing provides.
Fig. 1 is side elevational view of the present utility model;
Fig. 2 is the structural representation of hollow antislide pile;
Fig. 3 is the structural representation of grouted anchor bar;
Fig. 4 is the structural representation of an embodiment of the utility model;
Fig. 5 is the utility model front elevation view.
In figure: the hollow antislide pile of 1-, 2-anchor pole, 3-cover plate, 4-chamber wall, 5-weep hole, 7-gutter, 8-anchored end, 9-backing plate, 10 Anchor Agents, 11-anchoring section, 12-inner chamber.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but should not be construed the above-mentioned subject area of the utility model, only limits to following embodiment.In the situation that do not break away from the above-mentioned technological thought of the utility model,, according to ordinary skill knowledge and customary means, make various replacements and change, all should be included in the utility model scope.
A kind of possess underground water and collect side slope antiskid and the early warning system utilize function, comprises hollow antislide pile 1 and the anchor pole 2 of some insertion side slope bodies, and gutter 7.The reinforcement stresses meter is installed on the body of rod of described anchor pole 2.Described hollow antislide pile 1 is that upper end is uncovered, the hollow cylinder of lower end closed.Described hollow cylinder is surrounded by chamber wall 4, has some weep holes 5 on described chamber wall 4.The opening end of described hollow antislide pile 1 is positioned on the side slope surface.One end of described gutter 7 connects water pump, the other end is inserted in the inner chamber 12 of described hollow cylinder through described opening end.
In the present embodiment, described hollow antislide pile 1 can further make the basement rock anchoring of hollow antislide pile 1 lower end and side slope body interior for being inserted into the side slope body interior after prefabricated, and namely hollow antislide pile 1 lower end is anchored end 8.Another kind of implementation is to bore some deep holes on the side slope body, and its degree of depth reaches the basement rock place of side slope inside.Place the reinforcing cage that forms hollow antislide pile 1 body in described deep hole, at the inner masterplate of placing of described reinforcing cage.Build, after maintenance, side slope inside namely forms the hollow antislide pile 1 with said structure.
Further, the opening end of described hollow antislide pile 1 is installed cover plate 3.The upper end of the body of rod of described anchor pole 2 is equipped with backing plate 9.
In the present embodiment, described anchor pole 2 can be the reinforcing bar that inserts side slope inside., as preferably, can first bore some boltholes on side slope.The diameter of described bolthole is greater than the diameter of anchor pole 2, and the degree of depth of bolthole reaches the degree of depth of basement rock equally.Insert anchor pole 2 in bolthole after, to the hole between hole wall and anchor pole 2, inject Anchor Agent 10.After described Anchor Agent 10 solidifies, the body of rod of anchor pole 2 and slope anchorage, its anchor pole 2 one section formation anchoring section 11 from lower end.
In the present embodiment optimal way, described chamber wall 4 is built and is formed by steel concrete, and described chamber wall 4 is installed the reinforcement stresses meters, namely forms on the reinforcing cage of hollow antislide pile 1 body the reinforcement stresses meter is installed.In embodiment, no matter be mounted on hollow antislide pile 1 or anchor pole 2 on the reinforcement stresses meter all can adopt type vibration wire reinforcement stresses meter, adopt the vibratory string Theoretical Design, be convenient to the inner stress-strain measurement such as concrete, anchor structure.When anchor stress surpasses warning value, illustrate that slope stability is in understable state, need take measures.When hollow antislide pile stress surpasses warning value, illustrate that side slope is in the hole.
In embodiment, described hollow antislide pile 1 equidistantly inserts side slope, inserts some anchor poles 2 between described hollow antislide pile 1.In order to reach better antiskid effect, the arrangement of hollow antislide pile 1 and anchor pole 2 can adopt the mode of Fig. 4, the some anchor poles 2 that are about between some hollow antislide piles 1 are arranged to arch in the plane, utilize soil arching effect further to resist soil pressure in side slope.

Claims (5)

1. one kind possesses underground water and collects side slope antiskid and the early warning system utilize function, it is characterized in that: comprise hollow antislide pile (1) and the anchor pole (2) of some insertion side slope bodies, and gutter (7); The reinforcement stresses meter is installed on the body of rod of described anchor pole (2); Described hollow antislide pile (1) is that upper end is uncovered, the hollow cylinder of lower end closed; Described hollow cylinder is surrounded by chamber wall (4), has some weep holes (5) on described chamber wall (4); The opening end of described hollow antislide pile (1) is positioned on the side slope surface; One end of described gutter (7) connects water pump, the other end is inserted in the inner chamber (12) of described hollow cylinder through described opening end.
2. according to claim 1 possess underground water and collect side slope antiskid and the early warning system utilize function, and it is characterized in that: the opening end of described hollow antislide pile (1) is installed cover plate (3).
3. according to claim 1 possess underground water and collect side slope antiskid and the early warning system utilize function, and it is characterized in that: the upper end of the body of rod of described anchor pole (2) is equipped with backing plate (9).
4. according to claim 1 possess underground water and collect side slope antiskid and the early warning system utilize function, and it is characterized in that: described chamber wall (4) is built and formed by steel concrete, and described chamber wall (4) is installed the reinforcement stresses meter.
5. according to claim 1 possess underground water and collect side slope antiskid and the early warning system utilize function, and it is characterized in that: described hollow antislide pile (1) equidistantly inserts side slope, inserts some anchor poles (2) between described hollow antislide pile (1).
CN2013202913710U 2013-05-27 2013-05-27 Side slope anti-slide and pre-warning system with underground water collection and utilization function Expired - Fee Related CN203284786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202913710U CN203284786U (en) 2013-05-27 2013-05-27 Side slope anti-slide and pre-warning system with underground water collection and utilization function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202913710U CN203284786U (en) 2013-05-27 2013-05-27 Side slope anti-slide and pre-warning system with underground water collection and utilization function

Publications (1)

Publication Number Publication Date
CN203284786U true CN203284786U (en) 2013-11-13

Family

ID=49541158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202913710U Expired - Fee Related CN203284786U (en) 2013-05-27 2013-05-27 Side slope anti-slide and pre-warning system with underground water collection and utilization function

Country Status (1)

Country Link
CN (1) CN203284786U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674802A (en) * 2015-01-26 2015-06-03 重庆大学 Prestressed gravel anchoring pile and landslide control construction method thereof
CN105821889A (en) * 2016-04-05 2016-08-03 中国地质调查局西安地质调查中心 Loess platform landslip comprehensive treatment method based on underground water level control
CN106988325A (en) * 2017-05-05 2017-07-28 中国地质大学(武汉) A kind of apparatus and method for realizing friction pile piles with different spacing for side slope
CN107246004A (en) * 2017-06-28 2017-10-13 中铁第四勘察设计院集团有限公司 A kind of thick bamboo tube pilework and its solid slope method for side slope protection
CN114032931A (en) * 2021-12-13 2022-02-11 四川路桥建设集团交通工程有限公司 Fixing structure and method for protecting slope vegetation by using plant fiber blanket
CN115075228A (en) * 2022-05-11 2022-09-20 中铁时代建筑设计院有限公司 Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674802A (en) * 2015-01-26 2015-06-03 重庆大学 Prestressed gravel anchoring pile and landslide control construction method thereof
CN105821889A (en) * 2016-04-05 2016-08-03 中国地质调查局西安地质调查中心 Loess platform landslip comprehensive treatment method based on underground water level control
CN106988325A (en) * 2017-05-05 2017-07-28 中国地质大学(武汉) A kind of apparatus and method for realizing friction pile piles with different spacing for side slope
CN107246004A (en) * 2017-06-28 2017-10-13 中铁第四勘察设计院集团有限公司 A kind of thick bamboo tube pilework and its solid slope method for side slope protection
CN114032931A (en) * 2021-12-13 2022-02-11 四川路桥建设集团交通工程有限公司 Fixing structure and method for protecting slope vegetation by using plant fiber blanket
CN115075228A (en) * 2022-05-11 2022-09-20 中铁时代建筑设计院有限公司 Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method

Similar Documents

Publication Publication Date Title
CN203284786U (en) Side slope anti-slide and pre-warning system with underground water collection and utilization function
CN103510528B (en) For the blind drainage structure of underground structure anti-floating
CN103526773B (en) Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN106759274B (en) A kind of semi-hollow stake and its construction method with draining AsA -GSH cycle
CN101560770B (en) Novel deep building foundation pit supporting system
CN202787281U (en) Hydrophobic anti-slide structure
CN109826667A (en) The I-shaped checkdam of coal mine underground reservoir
CN104674802B (en) Prestressing force rubble anchorage pile and landslide control construction method thereof
CN103233473A (en) Polymer multi-edge pile grouting method
CN103924602A (en) Deep soft soil foundation pit construction method
CN112854260B (en) Ecological concrete rock-soil slope protection structure and construction method
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN102304915B (en) New method for controlling top quality of drilled pile
CN207260183U (en) A kind of external hanging type baffle prestress anchorage cable peg board retaining wall
CN204151796U (en) A kind of reinforcement eco-concrete bank protection
CN209585066U (en) A kind of Mine production slope drainage system
CN111173006A (en) Ecological slope protection method for reinforcing hilly soil by combining permeable retaining wall and sounding type bar planting belt
RU118649U1 (en) PILE
CN208039273U (en) A kind of mountain area high ferro slope surface supporting and retaining system safeguard structure
CN210369069U (en) Joint anti structure of floating of karst area foundation ditch
CN205399503U (en) Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN208899521U (en) A kind of peg board formula concrete retaining wall of Anti-inclining
CN204703189U (en) A kind of cutting barricade being applicable to crevice water, diving growth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131113

Termination date: 20160527