CN203271114U - PVC building formwork - Google Patents

PVC building formwork Download PDF

Info

Publication number
CN203271114U
CN203271114U CN 201320305822 CN201320305822U CN203271114U CN 203271114 U CN203271114 U CN 203271114U CN 201320305822 CN201320305822 CN 201320305822 CN 201320305822 U CN201320305822 U CN 201320305822U CN 203271114 U CN203271114 U CN 203271114U
Authority
CN
China
Prior art keywords
formwork
thickness
pvc building
pvc
building formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320305822
Other languages
Chinese (zh)
Inventor
陈立格
黄泰源
刘兴
陆剑
卢子敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Dianbai Construction Group Co ltd
Original Assignee
Guangdong Dianbai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Dianbai Construction Group Co ltd filed Critical Guangdong Dianbai Construction Group Co ltd
Priority to CN 201320305822 priority Critical patent/CN203271114U/en
Application granted granted Critical
Publication of CN203271114U publication Critical patent/CN203271114U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building formworks, in particular to a PVC building formwork. The PVC building formwork comprises a formwork body, the formwork body is composed of three layers of pressing plates and two layers of stiffening plates, each layer of stiffening plate is arranged between every two layers of pressing plates, the thickness of each pressing plate is 2-4mm, and the thickness of each stiffening plate is 2-3mm. When the PVC building formwork is used, the intensity of the PVC building formwork can be enhanced through the stiffening plates. Compared with the prior art, the PVC building formwork has the advantages that the weight is low, a large-scale hoisting device is not required when the formwork is assembled and disassembled, automatic demolding can be achieved without releasing agent in the construction process, and construction time is saved; damp-proof, waterproof and anti-corrosion purposes are achieved; the service life is long, and the use frequency is two to five times of that of the a high-quality bamboo plywood; recovery processing and secondary utilization are achieved, influence to the environment is little. In addition, the PVC building formwork further has the advantages of being reasonable in arrangement, low in manufacturing cost and the like.

Description

A kind of PVC construction formwork
Technical field
The utility model relates to the construction formwork technical field, particularly a kind of PVC construction formwork.
Background technology
In recent years, China every year approximately newly-built 2,000,000,000 square metres of buildings, at the bottom of expecting the year two thousand twenty, national house architectural area will increase 40,000,000,000 square metres newly, its asd number and construction speed are all unprecedented mistakes.Due to the building structure of China take cast-in-place concrete structure as main body, and the construction formwork important tool that is absolutely necessary in the cast-in-place concrete structure work progress, form work engineering is the important step in the concrete structure construction process, and construction formwork directly has influence on quality, progress and the cost of construction work.The utilization of adopting what material to make construction formwork to be related to resource, the cost of production of template and to the construction cost of building and cause influence degree to environment.
At present, the template mainly used of builing industry has steel form, wooden form, Bamboo Formwork.Steel form is mainly used in civilian height and lives outer wall template, Pier Formwork, bridge engineering plane and special-shaped part, its than great, once infusion of financial resources amount large, maintenance cost is high, use is inconvenient; Wooden form, Bamboo Formwork are mainly used in civilian commercial and residential building, plane bridge engineering, are bonding with phenolic resins or pollopas, and one has low toxicity, its two, the very thin thickness of glue-line, its three, can not bending forming, can not satisfy the requirement of curve modeling.When timber or bamboo wood immersion dilatancy, the extension at break degree of glue-line is far smaller than bamboo wood dilation, so the stratification of coming unstuck will appear in sheet material, Here it is, and the bamboo and wood template is not durable, the main cause that repeat usage is low, be generally 3-8 the application life of bamboo and wood template.
Along with quick people's exhibition of national economy, the urban traffic pressure is outstanding day by day in addition, and setting up overpass bridge is one of Main Means that slows down traffic pressure, and wherein the arc bridge extensively adopts in overpass bridge with its beautiful design.But the arc bridge is for the rectangle bridge, the installation of its modular system and reinforce more complexly, and the arc bridge does not reach the requirement of technical specification and geometric shape according to traditional fixing of the forming frame at all.Wherein, common steel form will bend to many curved profile difficult, and expense is higher; Commonly used wood glue plate, bamboo blanket template be more difficult bends shaping.
Therefore, in building and bridge construction industry,, intensity low in the urgent need to a kind of template cost of production and pliability are good, can carry out arc and process; Easy to loading and unloading, save the man-hour of constructing; Waterproof, anticorrosion, the number of turnover is many; Recyclable processing utilizes again, and the mould material little to ambient influnence to improve quality and the progress of construction project, reduces the construction cost of building and bridge construction engineering, reduces the consumption of natural resource.
The utility model content
The purpose of this utility model is for the defective of prior art and deficiency, and PVC construction formwork a kind of simple in structure, reasonable in design, easy to use is provided.
For achieving the above object, the technical solution adopted in the utility model is: a kind of PVC construction formwork, comprise template body, described template body is comprised of three laminates and two-layer stiffener, described stiffener is arranged between two laminates, the thickness of described pressing plate is 2~4mm, and the thickness of described stiffener is 2~3 mm.
Further, described stiffener is comprised of a deck panels and two-layer ribs, and two-layer ribs is separately positioned on upper surface and the soffit of panel.
Further, described ribs is the net structure distribution.
Further, the thickness of described pressing plate is 2.5~3.5mm, and the thickness of described stiffener is 2.2~2.8 mm.
Further, the thickness of described pressing plate is 2.8mm, and the thickness of described stiffener is 2.4mm.
Further, the thickness of described ribs has 0.8mm at least.
After adopting said structure, the utility model beneficial effect is: a kind of PVC construction formwork described in the utility model, comprise template body, described template body is by three laminates and two-layer stiffener, described stiffener is arranged between two laminates, the thickness of described pressing plate is 2~4mm, and the thickness of described stiffener is 2~3 mm.When using the utility model, but by stiffener Reinforced PVC construction formwork intensity, the utility model compared with prior art, it has the following advantages.
The first, template quality is light, and loading and unloading do not need Large-scale Hoisting equipment, but do not need the release agent automatic demoulding in work progress, saves the man-hour of constructing.
The second, the advantages such as protection against the tide, waterproof, anticorrosion.
The 3rd, long service life, access times are 2--5 times of high-quality bamboo offset plate.
The 4th, recyclable processing utilizes again, and is little to ambient influnence.
Five, can carry out arc processing, the alternative steel form of the arc-shaped plate after processing.
The 6th, the utlity model has simple in structurely, the advantage such as cost of manufacture is low is set rationally.
Description of drawings
Fig. 1 is left view of the present utility model.
Fig. 2 is the structural representation of stiffener.
Description of reference numerals: 1, template body; 2, pressing plate; 3, stiffener; 31, panel; 32, ribs.
The specific embodiment
Describe the utility model in detail below in conjunction with accompanying drawing and specific embodiment, illustrative examples wherein and explanation only are used for explaining the utility model, but not as to restriction of the present utility model.
As shown in Figure 1 and Figure 2, a kind of PVC construction formwork described in the utility model comprises template body 1, described template body 1 is by three laminates 2 and two-layer stiffener 3, described stiffener 3 is arranged between two laminates 2, and the thickness of described pressing plate 2 is 2~4mm, and the thickness of described stiffener 3 is 2~3 mm.
As the novel a kind of optimal way of this reality, described stiffener 3 is comprised of a deck panels 31 and two-layer ribs 32, and two-layer ribs 32 is separately positioned on upper surface and the soffit of panel 31.
As the novel a kind of optimal way of this reality, described ribs 32 is net structure.
As the novel a kind of optimal way of this reality, the thickness of described pressing plate 2 is 2.5~3.5mm, and the thickness of described stiffener 3 is 2.2~2.8 mm.
As the novel a kind of optimal way of this reality, the thickness of described pressing plate 2 is 2.8mm, and the thickness of described stiffener 3 is 2.4mm.
As the novel a kind of optimal way of this reality, the thickness of described ribs 32 has 0.8mm at least.
When using the utility model, the utility model compared with prior art, it has the following advantages:
The first, template quality is light, and loading and unloading do not need Large-scale Hoisting equipment, but do not need the release agent automatic demoulding in work progress, saves the man-hour of constructing.
The second, the advantages such as protection against the tide, waterproof, anticorrosion.
The 3rd, long service life, access times are 2--5 times of high-quality bamboo offset plate.
The 4th, recyclable processing utilizes again, and is little to ambient influnence.
Five, can carry out arc processing, the alternative steel form of the arc-shaped plate after processing.
The 6th, the utlity model has simple in structurely, the advantage such as cost of manufacture is low is set rationally.
Four, this is simple in structure, reasonable in design, low cost of manufacture.
The above is only better embodiment of the present utility model, therefore all equivalences of doing according to the described structure of the utility model patent claim, feature and principle change or modify, is included in the utility model patent claim.

Claims (5)

1. PVC construction formwork, comprise template body (1), it is characterized in that: described template body (1) is by three laminates (2) and two-layer stiffener (3), described stiffener (3) is arranged between two laminates (2), the thickness of described pressing plate (2) is 2~4mm, and the thickness of described stiffener (3) is 2~3 mm.
2. PVC construction formwork according to claim 1, it is characterized in that: described stiffener (3) is comprised of a deck panels (31) and two-layer ribs (32), and two-layer ribs (32) is separately positioned on upper surface and the soffit of panel (31).
3. PVC construction formwork according to claim 2 is characterized in that: described ribs (32) is net structure and distributes.
4. PVC construction formwork according to claim 1, it is characterized in that: the thickness of described pressing plate (2) is 2.5~3.5mm, the thickness of described stiffener (3) is 2.2~2.8 mm.
5. PVC construction formwork according to claim 1, it is characterized in that: the thickness of described pressing plate (2) is 2.8mm, the thickness of described stiffener (3) is 2.4mm.
CN 201320305822 2013-05-30 2013-05-30 PVC building formwork Expired - Lifetime CN203271114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320305822 CN203271114U (en) 2013-05-30 2013-05-30 PVC building formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320305822 CN203271114U (en) 2013-05-30 2013-05-30 PVC building formwork

Publications (1)

Publication Number Publication Date
CN203271114U true CN203271114U (en) 2013-11-06

Family

ID=49501554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320305822 Expired - Lifetime CN203271114U (en) 2013-05-30 2013-05-30 PVC building formwork

Country Status (1)

Country Link
CN (1) CN203271114U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912319A (en) * 2015-05-28 2015-09-16 福建海源新材料科技有限公司 High-strength and high-rigidity composite pattern plate and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912319A (en) * 2015-05-28 2015-09-16 福建海源新材料科技有限公司 High-strength and high-rigidity composite pattern plate and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN209397803U (en) A kind of removable steel bar girder laminated floor slab of UHPC ultra-high performance concrete
CN208844773U (en) A kind of ultra-high performance concrete steel bar girder laminated floor slab
CN203393896U (en) Sound-isolation and heat-insulation waved plate
CN101775897A (en) PVC (Polyvinyl Chloride) building template
CN203271114U (en) PVC building formwork
CN203145444U (en) Novel three-layer composite hollow plastic building template
CN209308409U (en) It is a kind of for pouring the quick assembling steel form of steel reinforced concrete rectangular column
CN203716484U (en) Plastic-steel composite building engineering template
CN104047421B (en) Finished product assembly type plastic composition turnover mould board construction method
CN203361646U (en) Hollow plastic corner sectional material for construction formwork system
CN209429538U (en) A kind of shear wall formwork support steel lumps of wood keel
CN203924698U (en) Floor template for integrated splicing building
CN201554222U (en) Reproductive plastic polymer compound hard board
CN201713982U (en) Reinforced polyvinyl chloride (PVC) hard board
CN101538938A (en) Template composition for cast-in-situ concrete columns and wall bodies
CN101716841A (en) Regenerated plastic polymer compound hard board
CN201714069U (en) Reinforced polyvinyl chloride hard board
CN202544393U (en) Veneering wood template used for floor supporting
CN201687196U (en) PVC building template
CN201714071U (en) PVC concrete pouring template
CN201428189Y (en) Reinforced concrete curved-shearing wall body structure by adopting phosphogypsum as wall body material and with hard upper part and soft lower part
CN206289955U (en) A kind of building concrete lightweight fast-assembling edge sealing Bamboo Formwork
CN201391086Y (en) Template assembly for cast-in-place concrete pillars and wall bodies
CN204626947U (en) A kind of construction formwork core and sandwich composite construction formwork
CN110230392A (en) A kind of thin template of aluminum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131106