CN203259860U - Intelligent auxiliary application system of transformer substation - Google Patents
Intelligent auxiliary application system of transformer substation Download PDFInfo
- Publication number
- CN203259860U CN203259860U CN 201320274491 CN201320274491U CN203259860U CN 203259860 U CN203259860 U CN 203259860U CN 201320274491 CN201320274491 CN 201320274491 CN 201320274491 U CN201320274491 U CN 201320274491U CN 203259860 U CN203259860 U CN 203259860U
- Authority
- CN
- China
- Prior art keywords
- subsystem
- intelligent
- application system
- transformer station
- assistance application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model discloses an intelligent auxiliary application system of a transformer substation. The system comprises an electric power communication private network, a monitoring center, a monitoring terminal, a fire protection subsystem, an environment monitoring subsystem, a video monitoring subsystem, a safety prevention subsystem, an intelligent entrance guard management subsystem, an intelligent control subsystem, a light control subsystem and a SF6 gas detection subsystem. By using the intelligent auxiliary application system of the transformer substation of the utility model, the intelligent transformer substation environment monitoring system, the safety prevention system, the fire protection alarm system, the entrance guard system, an illumination system, an air-conditioning system and the like are highly integrated in an uniform information management platform so as to reach information sharing and information interaction among subsystems. Simultaneously, the intelligent auxiliary system is integrated with other systems. Vertically, the system is responsible for unifying information interaction of an information platform with a superior. Laterally, the system is responsible for the information interaction and behavior interaction with a substation automation system. A new demand proposed by intelligent transformer substation construction to the auxiliary system can be satisfied at any time.
Description
Technical field
The utility model relates to a kind of intelligent assistance application system of transformer station.
Background technology
At present, mostly the numerous assistant subsystem of most of transformer stations are independent operating, by different passage uploading datas, even every cover system all is furnished with independently managerial personnel, these separately independently system be difficult to accomplish the comprehensive unified management of multisystem, can not well carry out global monitoring to transformer station, grasp each dynamic, when particularly running into bursty state, can not carry out timely cooperation between separate system, the monitoring cost and the personnel that have increased transformer station coordinate to contact cost, are unfavorable for the control of transformer substation system.
Summary of the invention
The technical matters that (one) will solve
For addressing the above problem, the utility model proposes a kind of intelligent assistance application system of transformer station, intelligent substation environmental monitoring system, security system, fire protection alarm system, gate control system, illuminator, air-conditioning system equal altitudes are integrated in unified information management platform, reach information sharing and information interaction between subsystems; Simultaneously, intelligent backup system is also integrated with other system: vertically upward be responsible for the information interaction with higher level's unified information platform, transversely responsible information interaction, behavior with electric substation automation system is interactive, satisfies at any time the new demand that the intelligent substation construction proposes backup system.
(2) technical scheme
The intelligent assistance application system of transformer station of the present utility model comprises power communication private network, Surveillance center, monitor terminal, fire-fighting subsystem, environmental monitoring subsystem, video monitoring subsystem, safety precaution subsystem, intelligent entrance guard ADMINISTRATION SUBSYSTEM, Based Intelligent Control subsystem, light control subsystem and SF6 gas detection subsystem; Described monitor terminal, fire-fighting subsystem, environmental monitoring subsystem, video monitoring subsystem, safety precaution subsystem, intelligent entrance guard ADMINISTRATION SUBSYSTEM, Based Intelligent Control subsystem, light control subsystem and SF6 gas detection subsystem independently access the power communication private network; Described power communication private network connects into Surveillance center.
Further, described monitor terminal is one or more in computing machine or notebook computer.
Further, described fire-fighting subsystem comprises protocol converter, fire-fighting main frame, temperature sensor and smoke transducer.
Further, described environmental monitoring subsystem comprises front end data acquisition module, door magnetic, infrared emission, infrared probe, smog, air-conditioner outdoor unit, power cable, open flame detector, outage inspection, electric current and voltage inspection and acousto-optic warning signal.
Further, described video monitoring subsystem network video server, embedded hard disc video camera and video capturing device.
Further, described safety precaution subsystem comprises pulse main frame and fence.
Further, described intelligent entrance guard ADMINISTRATION SUBSYSTEM comprises access controller and door identification apparatus.
Further, described Based Intelligent Control subsystem comprises acquisition module, intelligent control module and assistance application equipment.
Further, described light control subsystem comprises acquisition module, intelligent control module and lighting source.
Further, described SF6 gas detection subsystem comprises that SF6 gas detects main frame and gas detection sensor.
(3) beneficial effect
The utility model compared with prior art, it has following beneficial effect: the intelligent assistance application system of transformer station of the present utility model, intelligent substation environmental monitoring system, security system, fire protection alarm system, gate control system, illuminator, air-conditioning system equal altitudes are integrated in unified information management platform, reach information sharing and information interaction between subsystems; Simultaneously, intelligent backup system is also integrated with other system: vertically upward be responsible for the information interaction with higher level's unified information platform, transversely responsible information interaction, behavior with electric substation automation system is interactive, satisfies at any time the new demand that the intelligent substation construction proposes backup system.
Description of drawings
Fig. 1 is system chart of the present utility model.
1-power communication private network; 2-Surveillance center; The 3-monitor terminal; 4-fire-fighting subsystem; 5-environmental monitoring subsystem; 6-video monitoring subsystem; 7-safety precaution subsystem; 8-intelligent entrance guard ADMINISTRATION SUBSYSTEM; 9-Based Intelligent Control subsystem; 10-light control subsystem; 11-SF6 gas detection subsystem.
Embodiment
The intelligent assistance application system of a kind of transformer station as shown in Figure 1 comprises power communication private network 1, Surveillance center 2, monitor terminal 3, fire-fighting subsystem 4, environmental monitoring subsystem 5, video monitoring subsystem 6, safety precaution subsystem 7, intelligent entrance guard ADMINISTRATION SUBSYSTEM 8, Based Intelligent Control subsystem 9, light control subsystem 10 and SF6 gas detection subsystem 11; Described monitor terminal 3, fire-fighting subsystem 4, environmental monitoring subsystem 5, video monitoring subsystem 6, safety precaution subsystem 7, intelligent entrance guard ADMINISTRATION SUBSYSTEM 8, Based Intelligent Control subsystem 9, light control subsystem 10 and the independent access power communication of SF6 gas detection subsystem 11 private network 1; Described power communication private network 1 connects into Surveillance center 2.
Wherein, described monitor terminal 3 is one or more in computing machine or notebook computer; Described fire-fighting subsystem 4 comprises protocol converter, fire-fighting main frame, temperature sensor and smoke transducer; Described environmental monitoring subsystem 5 comprises front end data acquisition module, door magnetic, infrared emission, infrared probe, smog, air-conditioner outdoor unit, power cable, open flame detector, outage inspection, electric current and voltage inspection and acousto-optic warning signal; Described video monitoring subsystem 6 network video servers, embedded hard disc video camera and video capturing device; Described safety precaution subsystem 7 comprises pulse main frame and fence; , described intelligent entrance guard ADMINISTRATION SUBSYSTEM 8 comprises access controller and door identification apparatus; Described Based Intelligent Control subsystem 9 comprises acquisition module, intelligent control module and assistance application equipment; Described light control subsystem 10 comprises acquisition module, intelligent control module and lighting source; Described SF6 gas detection subsystem 11 comprises that SF6 gas detects main frame and gas detection sensor.
The intelligent assistance application system of transformer station of the present utility model, intelligent substation environmental monitoring system, security system, fire protection alarm system, gate control system, illuminator, air-conditioning system equal altitudes are integrated in unified information management platform, reach information sharing and information interaction between subsystems; Simultaneously, intelligent backup system is also integrated with other system: vertically upward be responsible for the information interaction with higher level's unified information platform, transversely responsible information interaction, behavior with electric substation automation system is interactive, satisfies at any time the new demand that the intelligent substation construction proposes backup system.
Embodiment recited above is described preferred implementation of the present utility model, is not that design of the present utility model and scope are limited.Under the prerequisite that does not break away from the utility model design concept; various modification and improvement that this area ordinary person makes the technical solution of the utility model; all should drop into protection domain of the present utility model; the technology contents that the utility model is asked for protection all is documented in claims.
Claims (10)
1. the intelligent assistance application system of a transformer station, is characterized in that: comprise power communication private network, Surveillance center, monitor terminal, fire-fighting subsystem, environmental monitoring subsystem, video monitoring subsystem, safety precaution subsystem, intelligent entrance guard ADMINISTRATION SUBSYSTEM, Based Intelligent Control subsystem, light control subsystem and SF6 gas detection subsystem; Described monitor terminal, fire-fighting subsystem, environmental monitoring subsystem, video monitoring subsystem, safety precaution subsystem, intelligent entrance guard ADMINISTRATION SUBSYSTEM, Based Intelligent Control subsystem, light control subsystem and SF6 gas detection subsystem independently access the power communication private network; Described power communication private network connects into Surveillance center.
2. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described monitor terminal is one or more in computing machine or notebook computer.
3. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described fire-fighting subsystem comprises protocol converter, fire-fighting main frame, temperature sensor and smoke transducer.
4. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described environmental monitoring subsystem comprises front end data acquisition module, door magnetic, infrared emission, infrared probe, smog, air-conditioner outdoor unit, power cable, open flame detector, outage inspection, electric current and voltage inspection and acousto-optic warning signal.
5. the intelligent assistance application system of transformer station according to claim 1, is characterized in that: described video monitoring subsystem network video server, embedded hard disc video camera and video capturing device.
6. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described safety precaution subsystem comprises pulse main frame and fence.
7. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described intelligent entrance guard ADMINISTRATION SUBSYSTEM comprises access controller and a door identification apparatus.
8. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described Based Intelligent Control subsystem comprises acquisition module, intelligent control module and assistance application equipment.
9. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described light control subsystem comprises acquisition module, intelligent control module and lighting source.
10. the intelligent assistance application system of transformer station according to claim 1, it is characterized in that: described SF6 gas detection subsystem comprises that SF6 gas detects main frame and gas detection sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320274491 CN203259860U (en) | 2013-05-20 | 2013-05-20 | Intelligent auxiliary application system of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320274491 CN203259860U (en) | 2013-05-20 | 2013-05-20 | Intelligent auxiliary application system of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203259860U true CN203259860U (en) | 2013-10-30 |
Family
ID=49472410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320274491 Expired - Fee Related CN203259860U (en) | 2013-05-20 | 2013-05-20 | Intelligent auxiliary application system of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203259860U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103970098A (en) * | 2014-04-28 | 2014-08-06 | 烟台磐能电气控制系统有限公司 | Intelligent substation auxiliary system integrated monitoring platform |
CN104460598A (en) * | 2014-11-03 | 2015-03-25 | 国家电网公司 | Substation intelligent auxiliary information monitoring system serving operation and maintenance staff |
CN105871071A (en) * | 2016-06-08 | 2016-08-17 | 上海南华兰陵电气有限公司 | Open type digital integrated automation system applied to transformer substation |
CN112670877A (en) * | 2020-12-11 | 2021-04-16 | 国网四川省电力公司资阳供电公司 | Transformer substation auxiliary safety operation and maintenance system |
CN113241856A (en) * | 2021-06-23 | 2021-08-10 | 国家电网有限公司 | Intelligent substation system |
WO2021179420A1 (en) * | 2020-03-10 | 2021-09-16 | 南京高立工程机械有限公司 | Intelligent integrated management system for lift-type buried ring main unit, and control method |
-
2013
- 2013-05-20 CN CN 201320274491 patent/CN203259860U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103970098A (en) * | 2014-04-28 | 2014-08-06 | 烟台磐能电气控制系统有限公司 | Intelligent substation auxiliary system integrated monitoring platform |
CN104460598A (en) * | 2014-11-03 | 2015-03-25 | 国家电网公司 | Substation intelligent auxiliary information monitoring system serving operation and maintenance staff |
CN105871071A (en) * | 2016-06-08 | 2016-08-17 | 上海南华兰陵电气有限公司 | Open type digital integrated automation system applied to transformer substation |
WO2021179420A1 (en) * | 2020-03-10 | 2021-09-16 | 南京高立工程机械有限公司 | Intelligent integrated management system for lift-type buried ring main unit, and control method |
CN112670877A (en) * | 2020-12-11 | 2021-04-16 | 国网四川省电力公司资阳供电公司 | Transformer substation auxiliary safety operation and maintenance system |
CN113241856A (en) * | 2021-06-23 | 2021-08-10 | 国家电网有限公司 | Intelligent substation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203259860U (en) | Intelligent auxiliary application system of transformer substation | |
CN203101995U (en) | Machine room comprehensive environment monitoring and early warning system | |
CN207395796U (en) | A kind of environment in mobile stations monitoring management system based on narrowband Internet of Things | |
CN206649329U (en) | A kind of power distribution room intelligent environment monitoring equipment | |
CN104052151A (en) | Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation | |
CN103779960A (en) | Intelligent switching station integrated monitoring system | |
CN103499965A (en) | Intelligent assisting monitoring system for substation internet of things | |
CN102723782A (en) | Substation integrated information processing platform based on hardware superposition technique | |
CN201749547U (en) | Unattended communication room safety management system | |
CN108928700A (en) | Hospital elevator security stereo monitors cloud platform, system and method, elevator device | |
CN207571545U (en) | A kind of intelligent power distribution room condition test-control system | |
CN211720329U (en) | Intelligent monitoring system for power distribution room | |
CN103106765A (en) | Wind-power cabin fire hazard early-stage monitoring system and monitoring method thereof | |
CN205121321U (en) | Intelligent building monitored control system | |
CN207397051U (en) | A kind of intelligent distribution network integrates auxiliary system | |
CN112634579A (en) | Transformer substation security early warning linkage system | |
CN112994230A (en) | Environment monitoring system for intelligent substation auxiliary system and use method thereof | |
CN203522338U (en) | Power distribution room electric power environment monitoring system | |
CN202837964U (en) | Intelligent unified security-protection platform of transformer station | |
CN203054587U (en) | Integrated information and environment monitor system for machine room | |
CN203849600U (en) | Transformer station monitoring device | |
CN214202124U (en) | Intelligent monitoring screen cabinet of power distribution room | |
CN203040828U (en) | Electric power mobile monitoring device | |
CN109358243A (en) | A kind of auxiliary monitoring system suitable for tractive power supply system | |
CN205334190U (en) | Computer electric classroom device management system based on thing networking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131030 Termination date: 20150520 |
|
EXPY | Termination of patent right or utility model |