CN203257018U - Step provided with open trench - Google Patents
Step provided with open trench Download PDFInfo
- Publication number
- CN203257018U CN203257018U CN 201320280918 CN201320280918U CN203257018U CN 203257018 U CN203257018 U CN 203257018U CN 201320280918 CN201320280918 CN 201320280918 CN 201320280918 U CN201320280918 U CN 201320280918U CN 203257018 U CN203257018 U CN 203257018U
- Authority
- CN
- China
- Prior art keywords
- concrete
- open drain
- open trench
- granite
- cushion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses a step provided with an open trench. The step is characterized in that a broken stone hardcore is arranged on pure soil, and is 60-80 mm thick; a concrete cushion is arranged on the broken stone hardcore, and the strength of concrete used by the concrete cushion is C20; granite is paved on the concrete cushion, and is 20-30 mm thick; the step is provided with the open trench at the end part; the sidewall of the open trench is built by brick; the bottom of the open trench adopts a concrete bottom plate, and the strength of the concrete bottom plate is C25; the top of the open trench adopts a concrete cover plate.
Description
Technical field
The utility model relates to a kind of step that the open drain is set, and is applicable to building field.
Background technology
Step then usually is located at the place, building entrance and is inscribed in order to solve between the discrepancy in elevation of indoor and outdoor ground.Therefore firm, durable except satisfying, safely, be convenient to pass through, carry the loose requirement of article and personnel's sulphur, also should take into account attractive in appearance.But be prone to the mass defects such as depression owing to structure is unreasonable.
The utility model content
The technical problem that the utility model solves provides a kind of step that the open drain is set, and solves existing technical deficiency.
The utility model comprises hardcore bed, concrete cushion, granite, brick, concrete cover, concrete floor, above the element soil hardcore bed is set, hardcore bed thickness is 60~80mm, concrete cushion is set above the hardcore bed, the concrete strength that concrete cushion adopts is C20, lay granite above the concrete cushion, granite thickness is 20~30mm, step arranges the open drain in the end, the open drain sidewall adopts brick masonry, concrete floor is adopted in the bottom, open drain, and concrete floor intensity is C25, and concrete cover is adopted at the top, open drain.
The utility model is simple and practical.
Description of drawings
Fig. 1 arranges the step schematic diagram in open drain.
Reference numeral: 1, hardcore bed, 2, concrete cushion, 3, granite, 4, brick, 5, concrete cover, 6, concrete floor.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is the step schematic diagram that the open drain is set.The utility model comprises hardcore bed 1, concrete cushion 2, granite 3, brick 4, concrete cover 5, concrete floor 6, above the element soil hardcore bed 1 is set, hardcore bed 1 thickness is 70mm, concrete cushion 2 is set above the hardcore bed 1, the concrete strength that concrete cushion 2 adopts is C20, lay granite 3 above the concrete cushion 2, granite 3 thickness are 25mm, step arranges the open drain in the end, the open drain sidewall adopts brick 4 to build by laying bricks or stones, concrete floor 6 is adopted in the bottom, open drain, and concrete floor 6 intensity are C25, and concrete cover 5 is adopted at the top, open drain.
Claims (1)
1. step that the open drain is set, it is characterized in that comprising hardcore bed, concrete cushion, granite, brick, concrete cover, concrete floor, above the element soil hardcore bed is set, hardcore bed thickness is 60~80mm, concrete cushion is set above the hardcore bed, the concrete strength that concrete cushion adopts is C20, lay granite above the concrete cushion, granite thickness is 20~30mm, step arranges the open drain in the end, and the open drain sidewall adopts brick masonry, and concrete floor is adopted in the bottom, open drain, concrete floor intensity is C25, and concrete cover is adopted at the top, open drain.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320280918 CN203257018U (en) | 2013-05-11 | 2013-05-11 | Step provided with open trench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320280918 CN203257018U (en) | 2013-05-11 | 2013-05-11 | Step provided with open trench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203257018U true CN203257018U (en) | 2013-10-30 |
Family
ID=49469596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320280918 Expired - Fee Related CN203257018U (en) | 2013-05-11 | 2013-05-11 | Step provided with open trench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203257018U (en) |
-
2013
- 2013-05-11 CN CN 201320280918 patent/CN203257018U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203769274U (en) | Horizontal floor tile laying positioning device | |
CN202866306U (en) | Masonry mortar bedding device for building wall body | |
CN203257018U (en) | Step provided with open trench | |
CN203257014U (en) | Structure of granite step | |
CN205153373U (en) | Outdoor stair | |
CN203257017U (en) | Stone step | |
CN203452394U (en) | Special support for line snapping for building wall construction | |
CN203188084U (en) | In-field shoulder-stone-free secondary concrete road | |
CN206538992U (en) | A kind of civic building lays adjuster with ceramic tile | |
CN203007998U (en) | Apron slope with open trench | |
CN203284992U (en) | Outdoor step structure | |
CN203284994U (en) | Outdoor marble step | |
CN201771147U (en) | Wall and floor tiles with firm pasting | |
CN201850834U (en) | Formed enclosing wall plate of combined enclosing wall | |
CN202767408U (en) | Gravel step | |
CN203222947U (en) | Marble step structure | |
CN203284995U (en) | Step with lighting function | |
CN202249156U (en) | Novel combined fence | |
CN204435433U (en) | Sump water proof structure | |
CN204001209U (en) | The drawknot constructional device of a kind of house wall and precast plate | |
CN201649461U (en) | Tile laying structure of hipped pavilion roof tiles for pseudo-classic building | |
CN203257016U (en) | Granite step | |
CN202899482U (en) | Granitic plaster step | |
CN203890839U (en) | S-shaped grass planting concrete block brick | |
CN203097209U (en) | Marble slab of improved structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131030 Termination date: 20140511 |