CN203254081U - Omnidirectional tangential intersecting laying-off template for pipelines - Google Patents
Omnidirectional tangential intersecting laying-off template for pipelines Download PDFInfo
- Publication number
- CN203254081U CN203254081U CN2013202893948U CN201320289394U CN203254081U CN 203254081 U CN203254081 U CN 203254081U CN 2013202893948 U CN2013202893948 U CN 2013202893948U CN 201320289394 U CN201320289394 U CN 201320289394U CN 203254081 U CN203254081 U CN 203254081U
- Authority
- CN
- China
- Prior art keywords
- fixing band
- elastic reducing
- pipeline
- template
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an omnidirectional tangential intersecting laying-off template for pipelines. The template can be applied to omnidirectional tangential intersecting welding construction of pipelines of various calibers and is used for placing samples to interfaces of offshore platform steel structures, chemical industrial device processes and various water and heat supplying pipeline processes. The template comprises movable sample rods, a flexible bottom plate and elastic fixing straps, wherein the elastic fixing straps are fixed on the flexible bottom plate, and the movable sample rods are nested in the elastic fixing straps. The template has the advantages that the structure is simple, the operation is flexible, the use is convenient, the sample placement is accurate, the material consumption is reduced effectively, the laying-off procedure is simplified, and the construction efficiency is increased remarkably; difficult construction problems of repeated interface modification and repeated trial assembly during tangential intersecting connection of irregular interfaces of various pipelines are solved; and meanwhile, the construction quality is ensured while the construction efficiency is increased and the engineering mounting cost is saved, various hidden risks caused by inaccurate laying-off and poor construction quality are eliminated, and the safety and continuity of subsequent production are guaranteed.
Description
Technical field
The utility model belongs to a kind of pipeline to be installed the comprehensive phase cut of blanking tool, particularly a kind of pipeline of transforming and passes through the blanking model, and the comprehensive phase cut that can be applicable to various bore pipelines is passed through in the welding procedure its interface setting-out.Be particularly suited in the installation of offshore platform steel structure, chemical plant installations flow process and all kinds of water supply hot duct flow processs is transformed, using.
Background technology
At present, in the installation transformation process of offshore platform steel structure, chemical plant installations flow process and all kinds of water supply hot duct flow processs, the pipeline of all kinds of different bores is tangent because connect needing, pass through mutually.Limited by the locus, planar dimension can Measurement accuracy when connecting carrying out various pipes, but the locus size inconvenience of joint is measured and can't be carried out blanking.Traditional method of attachment is repeatedly to try to connect, and repeatedly repairs the special-shaped interface of pipeline connection tangent, that pass through mutually, repeatedly assembles this abnormal shape interface.Cause the problems such as the large and assembling quality of low, the special-shaped interface defect ware of production efficiency rate is not high, for subsequent production is buried various hidden danger, as connecting not the sternly pipeline leakage of initiation, seepage, fracture etc., not only there is potential safety hazard, increased production cost, also cause environmental pollution.
Summary of the invention
The purpose of this utility model provides the comprehensive phase cut of a kind of pipeline and passes through the blanking model, a kind ofly is applicable to that various bore pipelines are tangent, the instrument of the special-shaped interface fast blanking that passes through mutually.The pipeline that solves different bores is in installing transformation process, and it is tangent, pass through interface position mutually changes blanking difficulty, the coarse problem of blank size that causes.Improve efficiency of construction, reduce production costs.
Technical solution of the present utility model is: the comprehensive phase cut of a kind of pipeline is passed through the blanking model and is comprised removable lining bar, flexible plate and elastic reducing-fixing band, and elastic reducing-fixing band is fixed on the flexible plate, and removable lining bar is set in the elastic reducing-fixing band.
The interval arranges horizontal anchor suture between described elastic reducing-fixing band and the flexible plate, and removable lining bar can be set in the elastic reducing-fixing band.
Compared with prior art the utlity model has following useful effect: the utility model is simple in structure, flexible operation, easy to use, and institute's setting-out originally accurately, has effectively reduced material consumption, has simplified the blanking program, has significantly improved efficiency of construction.Solved the special-shaped interface of various pipes tangent, mutually pass through repeat in the connection to repair mouthful, the construction difficult problem of examination assembling repeatedly, simultaneously, when improving efficiency of construction, saving the project installation cost, guaranteed construction quality, eliminated that blanking is not smart, the not good various hidden danger of bringing of construction quality, guaranteed security and the continuity of subsequent production.Prove that by practical operation this tool operation is convenient, flexible, can increase work efficiency 3 to 5 times, have good result of use.
Description of drawings
Fig. 1 is deployed configuration schematic diagram of the present utility model.
Fig. 2 is use view of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed description: referring to Fig. 1 and Fig. 2, the comprehensive phase cut of a kind of pipeline is passed through the blanking model and is comprised removable lining bar 1, flexible plate 2 and elastic reducing-fixing band 3, elastic reducing-fixing band 3 is fixed on the flexible plate 2, and removable lining bar 1 is set in the elastic reducing-fixing band 3.The interval arranges horizontal anchor suture between elastic reducing-fixing band 3 and the flexible plate 2, and removable lining bar 1 can be worn wherein.Mutually do not squeeze between the removable lining bar 1 when the spacing dimension between the removable lining bar 1 is set in parcel at least by the construction pipeline and bump.Particularly when small pipe line is constructed, should note dwindling the diameter of removable lining bar 1, adjust the spacing dimension between the removable lining bar 1.Removable lining bar 1 is the identical cylinder of length or multiple edge body.Elastic reducing-fixing band 3 is the elastic cords that are provided with elastic bar, utilizes its flexible fastening effect to 1 fixation of removable lining bar.The length at flexible plate 2 two ends is at least than elastic reducing-fixing band 3 large 2cm, the length of elastic reducing-fixing band 3 at least with by the construction pipeline equal diameters, the length of elastic reducing-fixing band 3 can be longer than the pipeline diameter of being constructed, and redundance can terminate in that the place that joins need not.The another side that the flexible plate 2 one ends fronts longer than elastic reducing-fixing band 3 are provided with the nylon adhering buckle, do not establish elastic reducing-fixing band 3 is provided with the nylon stick junction, and is easy to connect during by the construction pipeline of setting-out at parcel.Also can be: the another side that the flexible plate 2 one ends fronts longer than elastic reducing-fixing band 3 are provided with the nylon stick junction, do not establish elastic reducing-fixing band 3 be provided with the nylon adhering buckle.
During use, according to by the diameter of construction pipeline, the removable lining bar 1 of respective numbers is worn in the elastic reducing-fixing band 3 on the flexible plate 2.Flexible plate 2 reclined be pressed on special-shaped interface pipeline 1 near on the interface surfaces of special-shaped interface pipeline 27.Behind the special-shaped interface pipeline 1 of flexible plate 2 parcels, make its end concordant, press nylon adhering buckle and nylon stick junction on the flexible plate 2, take tightly with the nylon adhering buckle, consist of parallel lines 5.Under the clamping action of elastic reducing-fixing band 3, promote successively removable lining bar 1, make its arrive 27 tangent with special-shaped interface pipeline, pass through the passing through on the tangent line 4 of root mutually, unclamp the interface sample that flexible plate 2 can obtain required special-shaped interface pipeline 1, according to shown in the line blanking, accurately convenient.
Claims (8)
1. the blanking model is passed through in the comprehensive phase cut of pipeline, it is characterized in that, comprise removable lining bar (1), flexible plate (2) and elastic reducing-fixing band (3), elastic reducing-fixing band (3) is fixed on the flexible plate (2), and removable lining bar (1) is set in the elastic reducing-fixing band (3).
2. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 1, it is characterized in that, the interval arranges horizontal anchor suture between elastic reducing-fixing band (3) and the flexible plate (2), and removable lining bar (1) is set in the elastic reducing-fixing band (3).
3. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 2, it is characterized in that, does not mutually squeeze between the removable lining bar (1) when the spacing dimension between the removable lining bar (1) is set in parcel at least by the construction pipeline and bumps.
According to claim 2 or the comprehensive phase cut of 3 described a kind of pipelines pass through the blanking model, it is characterized in that removable lining bar (1) is the identical cylinder of length or multiple edge body.
5. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 4, it is characterized in that, elastic reducing-fixing band (3) is the elastic cord that is provided with elastic bar.
6. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 1 and 2, it is characterized in that, the length at flexible plate (2) two ends is at least than the large 2cm of elastic reducing-fixing band (3), the length of elastic reducing-fixing band (3) at least with by the equal diameters of construction pipeline.
7. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 6, it is characterized in that the another side that flexible plate (2) the one ends front longer than elastic reducing-fixing band (3) be provided with the nylon adhering buckle, do not establish elastic reducing-fixing band (3) is provided with the nylon stick junction.
8. the blanking model is passed through in the comprehensive phase cut of a kind of pipeline according to claim 6, it is characterized in that the another side that flexible plate (2) the one ends front longer than elastic reducing-fixing band (3) be provided with the nylon stick junction, do not establish elastic reducing-fixing band (3) is provided with the nylon adhering buckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202893948U CN203254081U (en) | 2013-05-24 | 2013-05-24 | Omnidirectional tangential intersecting laying-off template for pipelines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202893948U CN203254081U (en) | 2013-05-24 | 2013-05-24 | Omnidirectional tangential intersecting laying-off template for pipelines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203254081U true CN203254081U (en) | 2013-10-30 |
Family
ID=49466687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202893948U Expired - Fee Related CN203254081U (en) | 2013-05-24 | 2013-05-24 | Omnidirectional tangential intersecting laying-off template for pipelines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203254081U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110076745A (en) * | 2019-06-03 | 2019-08-02 | 包头钢铁(集团)有限责任公司 | Steel pipe construction lofting tools and setting out method |
-
2013
- 2013-05-24 CN CN2013202893948U patent/CN203254081U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110076745A (en) * | 2019-06-03 | 2019-08-02 | 包头钢铁(集团)有限责任公司 | Steel pipe construction lofting tools and setting out method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204053260U (en) | Be applicable to the elbow pipe welding device of water heating pipe fittings processing | |
CN202994575U (en) | Tensile fixture for testing stretch-resisting performance of non-metal materials | |
CN203254081U (en) | Omnidirectional tangential intersecting laying-off template for pipelines | |
CN204831932U (en) | New utensil of heat exchange tube compression test | |
CN204042199U (en) | A kind of yoke configurations for fixing tube | |
CN204195165U (en) | A kind of pipeline quick-assembling positioning tool alignment device | |
CN201881761U (en) | Conducting wire clamp locator for matching holes and drawing lines | |
CN103557106B (en) | Oil injecting ring flow testing device and use method thereof | |
CN201851779U (en) | Transition pipe for deviation correction of steel pipe jacking | |
CN207163605U (en) | Gas chamber piston steel wire rope clamp force test device | |
CN201502834U (en) | Portable pipeline leakage stopper | |
CN203156379U (en) | Process unit for drilling of three-way elbow | |
CN209140749U (en) | A kind of flange positioning clamping device | |
CN205043420U (en) | Pipeline welding is to mouthpart | |
CN204771638U (en) | But return bend anchor clamps of accurate positioning | |
CN104280194B (en) | A kind of sealing device for collecting pipe component leak detection | |
CN103433910A (en) | Blanking template used for butt joint of sectional materials | |
CN204358247U (en) | A kind of astrovehicle pipe-line system is with debuging and testing apparatus | |
CN202735172U (en) | Air pressure test device | |
CN201875322U (en) | Connecting fixing device convenient to adjust angle | |
CN203184898U (en) | Instrument pipeline butt welding fixture | |
CN203317333U (en) | Dismounting tooling for valve guide oil seal | |
CN219684394U (en) | Elbow welding tool | |
CN202733243U (en) | Connecting device for a high pressure test | |
CN204843381U (en) | Welding position device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131030 Termination date: 20140524 |