CN203241512U - AC withstand voltage testing device for insulation boots and insulation gloves - Google Patents
AC withstand voltage testing device for insulation boots and insulation gloves Download PDFInfo
- Publication number
- CN203241512U CN203241512U CN 201320259179 CN201320259179U CN203241512U CN 203241512 U CN203241512 U CN 203241512U CN 201320259179 CN201320259179 CN 201320259179 CN 201320259179 U CN201320259179 U CN 201320259179U CN 203241512 U CN203241512 U CN 203241512U
- Authority
- CN
- China
- Prior art keywords
- stainless steel
- insulating
- steel trough
- test
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 47
- 238000009413 insulation Methods 0.000 title claims abstract description 11
- 229910001220 stainless steel Inorganic materials 0.000 claims abstract description 36
- 239000010935 stainless steel Substances 0.000 claims abstract description 36
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 8
- 230000007797 corrosion Effects 0.000 claims description 7
- 238000005260 corrosion Methods 0.000 claims description 7
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 239000003365 glass fiber Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 239000002990 reinforced plastic Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010891 electric arc Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
The utility model relates to an AC withstand voltage testing device for insulation boots and insulation gloves. The device is characterized in that: the device comprises a support (10); four universal wheels (11) are installed at the bottom of the support (10); a stainless steel water tank (7) is installed on the top of the support (10); stainless steel plates are arranged in the stainless steel water tank (7) to divide the stainless steel water tank (7) into at least two testing tanks, the bottom of which all communicate with the bottom of the stainless steel water tank (7); a water drain valve (9) is installed at the bottom of the stainless steel water tank (7); a slide groove (6) is arranged in each of the two opposite side faces of the stainless steel water tank (7); and two insulation poles (4) are installed in the two slide grooves (6). The device provided by the utility model is convenient for usage and carrying, can be used for testing in transformer stations directly, and can be used for AC withstand voltage testing on insulation boots and insulation gloves at the same time.
Description
Technical field
The utility model relates to a kind of insulating boot and insulating glove alternating-current voltage resistance test device.
Background technology
Insulating boot and insulating glove use in power supply enterprise extensively, and it is as the supplementary insulation managing security tools and instruments, in order to prevent that touch voltage, step voltage, leakage current electric arc are to electric operation personnel's injury.For (or newly putting) insulating safety tools performance change in preventing from using or there is hidden danger, often need to carry out AC voltage withstand test to insulating boot and insulating glove, but present insulating boot and the each have their own experimental facilities of insulating glove, the test period that needs is long, affects work efficiency.
The utility model content
The purpose of this utility model provides a kind of insulating boot and insulating glove alternating-current voltage resistance test device, can carry out AC voltage withstand test to insulating boot and insulating glove simultaneously, thereby increase work efficiency.
A kind of insulating boot and insulating glove alternating-current voltage resistance test device, its special feature is: comprise support, in this frame bottom four universal wheels are installed, at this top of the trellis rectangular-shaped stainless steel trough is installed, thereby in this stainless steel trough, be provided with corrosion resistant plate this stainless steel trough is divided at least 2 test flumes, and the bottom of all test flumes all interconnects with the bottom of stainless steel trough, at the stainless steel water trench bottom water drain valve is installed in addition; Two relative on stainless steel trough sides are provided with a chute separately, at these two chutes two insulating bars are installed, the top of these two insulating bars is fixedly connected with the two ends of same high-voltage conductive rod respectively, and be provided with high-voltage connection terminal at an end of this high-voltage conductive rod, test lead also is installed on high-voltage conductive rod; On stainless steel trough, also be provided with ground terminal.
Thereby wherein in stainless steel trough, be provided with corrosion resistant plate this stainless steel trough is divided into 12 insulation gloves experiment grooves and 10 insulating boot test flumes, and each test flume is rectangular parallelepiped.
Wherein insulating bar adopts reinforced plastic glass fibre or epoxy resin material.
Wherein test lead adopts bare copper wire, and an end of this bare copper wire hangs on the high-voltage conductive rod by suspension ring and its other end is connected with plummet.
Through probationary certificate, test unit of the present utility model uses, carries all very convenient, can directly enter transformer station and test, and can carry out AC voltage withstand test to insulating boot and insulating glove simultaneously, thereby greatly shorten test period, increases work efficiency.
Description of drawings
Accompanying drawing 1 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, the utility model is a kind of insulating boot and insulating glove alternating-current voltage resistance test device, comprise support 10, be specially four legs, in these support 10 bottoms four universal wheels 11 are installed, be to install one on every leg, at these support 10 tops rectangular-shaped stainless steel trough 7 is installed, thereby in this stainless steel trough 7, be provided with corrosion resistant plate this stainless steel trough 7 is divided at least 2 test flumes, and the bottom of all test flumes all interconnects with the bottom of stainless steel trough 7, and namely all test flumes bottoms are not all sealed.In stainless steel trough 7 bottoms water drain valve 9 is installed in addition, thereby can after test, water be emitted, and can adopt welding between corrosion resistant plate and the stainless steel trough 7 or be fixedly connected with securing member.
Two relative on stainless steel trough 7 sides are provided with a chute 6 separately, at these two chutes 6 two insulating bars 4 are installed, thereby these two insulating bars 4 can be moved along two chutes 6, are convenient to adjust testing position.The top of these two insulating bars 4 is fixedly connected with the two ends of same high-voltage conductive rod 1 respectively, and is provided with high-voltage connection terminal at an end of this high-voltage conductive rod 1, is used for connecing high pressure (electricity) source.Test lead also is installed on high-voltage conductive rod 1, and test lead adopts bare copper wire 3, and an end of this bare copper wire 3 hangs on the high-voltage conductive rod 1 by suspension ring 2 and its other end is connected with plummet 5, thereby under the Action of Gravity Field of plummet 5 that bare copper wire 3 is stretching downwards.On stainless steel trough 7, also be provided with ground terminal 8, reliable ground when being used for test.
Thereby wherein in stainless steel trough 7, be provided with corrosion resistant plate this stainless steel trough 7 is divided into 12 insulation gloves experiment grooves and 10 insulating boot test flumes, and each test flume is rectangular parallelepiped.Insulating bar 4 adopts reinforced plastic glass fibre or epoxy resin material.
Using method of the present utility model is:
As shown in Figure 1, take insulating boot as example, in stainless steel trough 7, pour first the high clear water of 20cm before using into, then insulating boot to be tested is put in the test flume of appointment, a test flume is put an insulating boot, adds the clear water of height 20cm in each insulating boot, then plummet 5 is put into the water of insulating boot, high-voltage connection terminal on the high-voltage conductive rod 1 connects high-voltage power supply and can test, and the clear water in this batch insulating boot directly can be poured in the next group insulating boot to be tested after the test.
Claims (4)
1. an insulating boot and insulating glove alternating-current voltage resistance test device, it is characterized in that: comprise support (10), in this support (10) bottom four universal wheels (11) are installed, at this support (10) top rectangular-shaped stainless steel trough (7) is installed, at this stainless steel trough (7) thus in be provided with corrosion resistant plate this stainless steel trough (7) be divided at least 2 test flumes, and the bottom of all test flumes all interconnects with the bottom of stainless steel trough (7), in stainless steel trough (7) bottom water drain valve (9) is installed in addition; Be provided with separately a chute (6) in upper two the relative sides of stainless steel trough (7), at these two chutes (6) two insulating bars (4) are installed, the top of these two insulating bars (4) is fixedly connected with the two ends of same high-voltage conductive rod (1) respectively, and be provided with high-voltage connection terminal at an end of this high-voltage conductive rod (1), test lead also is installed on high-voltage conductive rod (1); On stainless steel trough (7), also be provided with ground terminal (8).
2. insulating boot as claimed in claim 1 and insulating glove alternating-current voltage resistance test device, it is characterized in that: wherein at stainless steel trough (7) thus in be provided with corrosion resistant plate this stainless steel trough (7) be divided into 12 insulation gloves experiment grooves and 10 insulating boot test flumes, and each test flume is rectangular parallelepiped.
3. insulating boot as claimed in claim 1 and insulating glove alternating-current voltage resistance test device is characterized in that: wherein insulating bar (4) adopts reinforced plastic glass fibre or epoxy resin material.
4. such as the described insulating boot of any one in the claims 1 to 3 and insulating glove alternating-current voltage resistance test device, it is characterized in that: wherein test lead adopts bare copper wire (3), and an end of this bare copper wire (3) hangs over by suspension ring (2) that high-voltage conductive rod (1) is gone up and its other end is connected with plummet (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320259179 CN203241512U (en) | 2013-05-08 | 2013-05-14 | AC withstand voltage testing device for insulation boots and insulation gloves |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320245737 | 2013-05-08 | ||
CN201320245737.0 | 2013-05-08 | ||
CN 201320259179 CN203241512U (en) | 2013-05-08 | 2013-05-14 | AC withstand voltage testing device for insulation boots and insulation gloves |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203241512U true CN203241512U (en) | 2013-10-16 |
Family
ID=49318794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320259179 Expired - Fee Related CN203241512U (en) | 2013-05-08 | 2013-05-14 | AC withstand voltage testing device for insulation boots and insulation gloves |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203241512U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103235247A (en) * | 2013-05-08 | 2013-08-07 | 国家电网公司 | Alternating current (AC) voltage withstand test device for insulating boot and insulating gloves |
CN108008265A (en) * | 2017-12-05 | 2018-05-08 | 国网江西省电力有限公司赣州供电分公司 | A kind of insulating boot does examination steel ball filling case |
-
2013
- 2013-05-14 CN CN 201320259179 patent/CN203241512U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103235247A (en) * | 2013-05-08 | 2013-08-07 | 国家电网公司 | Alternating current (AC) voltage withstand test device for insulating boot and insulating gloves |
CN103235247B (en) * | 2013-05-08 | 2016-01-20 | 国家电网公司 | Insulating boot and insulating glove alternating-current voltage resistance test device |
CN108008265A (en) * | 2017-12-05 | 2018-05-08 | 国网江西省电力有限公司赣州供电分公司 | A kind of insulating boot does examination steel ball filling case |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103235247B (en) | Insulating boot and insulating glove alternating-current voltage resistance test device | |
CN205427116U (en) | Insulating gloves and insulating boot pressure resistance test installation | |
CN203350292U (en) | Wiring apparatus used for breaker characteristic test | |
CN204177913U (en) | A kind of insulating glove, insulating boot batch Withstand test device | |
CN203241512U (en) | AC withstand voltage testing device for insulation boots and insulation gloves | |
CN103852601A (en) | Alternating-current withstand voltage support of insulating rods | |
CN104007375A (en) | Facility for alternating current voltage withstand tests for 200kV and 330kV insulation tools and instruments | |
CN203705592U (en) | Floor type safety tool withstand voltage test special-purpose device | |
CN203365531U (en) | Novel alternating-current and direct-current high-voltage electroscope | |
CN102879657B (en) | Method for checking phase sequences of lines | |
CN204834374U (en) | Multi -functional portable insulator spindle | |
CN102707172B (en) | Test device for simulating icing of power transmission line | |
CN203759056U (en) | AC voltage-resistant support of insulating rod | |
CN203811630U (en) | Support for insulating bar voltage-withstanding tests | |
CN202041553U (en) | Combined wiring device for transformer test | |
CN204832265U (en) | Following circuit breaker of 35KV and generating line loop resistance rapid survey termination | |
CN201765868U (en) | Elastic lead | |
CN104035011B (en) | A kind of Withstand test device of insulating protection apparatus | |
CN204497572U (en) | A kind of HGIS equipment | |
CN102590664A (en) | Low-voltage large-current testing platform of direct-current ice melting device | |
CN203250629U (en) | Mutual inductor secondary winding connection box | |
CN204142823U (en) | A kind of measurement and protective device being applied to 10kV electric system | |
CN203965486U (en) | High-Voltage Insulation Work tool test-bed | |
CN203909225U (en) | Voltage-withstanding test device for insulated protection device | |
CN203720308U (en) | Multi-type 126kV insulating stand voltage withstanding type tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131016 Termination date: 20160514 |