CN203240990U - 一种电杆架设两用测量尺 - Google Patents
一种电杆架设两用测量尺 Download PDFInfo
- Publication number
- CN203240990U CN203240990U CN 201320240799 CN201320240799U CN203240990U CN 203240990 U CN203240990 U CN 203240990U CN 201320240799 CN201320240799 CN 201320240799 CN 201320240799 U CN201320240799 U CN 201320240799U CN 203240990 U CN203240990 U CN 203240990U
- Authority
- CN
- China
- Prior art keywords
- stick
- crossfoot
- electric pole
- perpendicular chi
- transverse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 9
- 238000005259 measurement Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型公开了一种电杆架设两用测量尺,属电杆架设施工技术领域。其特征在于:包括竖尺、横尺和拉绳;所述竖尺的下端与横尺的一端通过螺栓铰接,所述竖尺的上端与横尺的另一端之间通过拉绳连接,使竖尺和横尺的夹角为直角;竖尺和横尺为相互套装的管子。所述的管子为方管。所述横尺和竖尺的长度均为2.5m。本实用新型具有携带使用方便,测量准确快捷的特点,不受地形限制,节省作业时间,减少人力耗费,提高劳动效率。
Description
技术领域
本实用新型涉及电杆架设施工技术领域。
背景技术
在35KV及以下输配电线路施工中,经常需要在架设电杆施工中挖坑定位,架设电杆之间的坑间距离必须符合图纸设计要求,因此在施工中必须严格按照图纸尺寸挖坑,才能保证施工质量。现有的施工技术中,使用经纬仪、花杆、皮尺作为组合工具,对架设电杆施工中挖坑进行定位。通过实际操作,发现此组合工具在架设电杆施工分坑作业当中,操作繁琐,既费时又费力,有时因为地形变化受到限制,实际测量值不准确,尤其是在高低不平的斜坡地形上,在高点确定第一个坑的位置,在低点确定第二个坑的位置时,由于斜坡地形,使用上述的组合工具,不能保证两个坑之间的水平距离的准确性,不能保证施工质量,不符合35KV及以下输配电线路建设的标准。
实用新型内容
本实用新型所要解决的技术问题是提供一种能对架设的电杆之间的距离快速准确定位且结构简单、使用方便、便于携带的电杆架设两用测量尺。
为解决上述技术问题,本实用新型所采取的技术方案是:一种电杆架设两用测量尺,其特征在于:包括竖尺、横尺和拉绳;所述竖尺的下端与横尺的一端通过螺栓铰接,所述竖尺的上端与横尺的另一端之间通过拉绳连接,使竖尺和横尺的夹角为直角;竖尺和横尺为相互套装的管子。
对本实用新型所做的进一步改进是:所述的管子为方管。所述横尺和竖尺的长度均为2.5m。
采用上述技术方案所产生的有益效果在于:一是缩短了前期勘察测量工期。此工具如在35KV及以下输配电线路架设中广泛运用,最直接的效益就是加快线路投产运行进度,较早的形成投入产出的良性比;二是减少施工人员,降低施工费用约40%,三是缩短作业时间,降低了施工人员的劳动强度。四是具有携带使用方便,测量准确快捷的特点,不受地形限制,提高了劳动效率。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
图1 为本实用新型的结构示意图。
如图所示:1竖尺、2第一坑位置、3第二坑位置、4拉绳、5斜坡地形、
6横尺、7螺栓。
具体实施方式
对照图1对本实用新型的操作使用步骤作进一步说明:
实施例1:(见图1)一种电杆架设两用测量尺,其特征在于:包括竖尺1、横尺6和拉绳4;所述竖尺1的下端与横尺6的一端通过螺栓7铰接,所述竖尺1的上端与横尺6的另一端之间通过拉绳4连接,使竖尺1和横尺6的夹角为直角;竖尺1和横尺6为相互套装的管子。所述的管子为方管。
本实施例的原料采用方管,也可以用圆管,在上面涂有红白相间的标志颜色。竖尺1可以插入横尺6内,将竖尺1端部和横尺6端部通过螺栓7铰接,形成折叠式结构,拉绳4连接在竖尺1上端和横尺6右端之间,竖尺1和横尺6之间的夹角为直角,作为挖坑定位的测量尺。竖尺1和横尺6的端部套装后用螺栓7固定连接成直杆形,还可以做测量标杆使用。
实施例2:(见图1)一种电杆架设两用测量尺,其特征在于:包括竖尺1、横尺6和拉绳4;所述竖尺1的下端与横尺6的一端通过螺栓7铰接,所述竖尺1的上端与横尺6的另一端之间通过拉绳4连接,使竖尺1和横尺6的夹角为直角;竖尺1和横尺6为相互套装的管子。所述横尺6和竖尺1的长度均为2.5m。
本实施例的原料采用方管,也可以用圆管,在上面涂有红白相间的标志颜色。竖尺1可以插入横尺6内,将竖尺1端部和横尺6端部通过螺栓7铰接,形成折叠式结构,拉绳4连接在竖尺1上端和横尺6右端之间,竖尺1和横尺6之间的夹角为直角,作为挖坑定位的测量尺。竖尺1和横尺6的端部套装后用螺栓7固定连接成直杆形,横尺6和竖尺1的长度均为2.5m,适应在野外作业随身携带,还可以做测量标杆使用。
Claims (3)
1.一种电杆架设两用测量尺,其特征在于:包括竖尺(1)、横尺(6)和拉绳(4);所述竖尺(1)的下端与横尺(6)的一端通过螺栓(7)铰接,所述竖尺(1)的上端与横尺(6)的另一端之间通过拉绳(4)连接,使竖尺(1)和横尺(6)的夹角为直角;竖尺(1)和横尺(6)为相互套装的管子。
2.根据权利要求1所述的一种电杆架设两用测量尺,其特征在于:所述的管子为方管。
3.根据权利要求1所述的一种电杆架设两用测量尺,其特征在于:所述横尺(6)和竖尺(1)的长度均为2.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320240799 CN203240990U (zh) | 2013-05-07 | 2013-05-07 | 一种电杆架设两用测量尺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320240799 CN203240990U (zh) | 2013-05-07 | 2013-05-07 | 一种电杆架设两用测量尺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203240990U true CN203240990U (zh) | 2013-10-16 |
Family
ID=49318278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320240799 Expired - Fee Related CN203240990U (zh) | 2013-05-07 | 2013-05-07 | 一种电杆架设两用测量尺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203240990U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103292660A (zh) * | 2013-05-07 | 2013-09-11 | 国家电网公司 | 一种电杆架设两用测量尺 |
-
2013
- 2013-05-07 CN CN 201320240799 patent/CN203240990U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103292660A (zh) * | 2013-05-07 | 2013-09-11 | 国家电网公司 | 一种电杆架设两用测量尺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206321243U (zh) | 电力系统设备支柱垂直度快速测量工具 | |
CN203965278U (zh) | 一种可移动的混凝土坍落度测试装置 | |
CN202853617U (zh) | 一种可伸缩便捷铅锤尺 | |
CN201892537U (zh) | 模板垂直度检测尺 | |
CN203240990U (zh) | 一种电杆架设两用测量尺 | |
CN202734733U (zh) | 伞形电缆弯曲半径测量工具 | |
CN202323905U (zh) | 矩形渠道机翼柱形量水槽 | |
CN203687823U (zh) | 一种矿用伸缩测量杆 | |
CN203364832U (zh) | 一种墙柱模板垂直度、平整度测量工具 | |
CN103292660A (zh) | 一种电杆架设两用测量尺 | |
CN202255398U (zh) | 一种墙、柱模板垂直度测量装置 | |
CN203083498U (zh) | 一种电杆埋深快速测量尺 | |
CN202954571U (zh) | 一种在建筑物高处画线定位的专用装置 | |
CN201706991U (zh) | 测量尺 | |
CN204944498U (zh) | 工程管理多用测量尺 | |
CN203940861U (zh) | 折叠式三角分坑尺 | |
CN210002457U (zh) | 土木建筑用定位基桩 | |
CN206583451U (zh) | 一种建筑施工用多功能靠尺 | |
CN204402563U (zh) | 用于隧/巷道的轨道式三维激光数字测量仪 | |
CN202770416U (zh) | 测量弓子线弧垂用感应式安全距离测量工具 | |
CN202853616U (zh) | 悬索钢缆测定觇标架的钢缆定心机构 | |
CN206339232U (zh) | 一种边坡测量用装置 | |
CN203681087U (zh) | 一种建筑直尺 | |
CN103175492A (zh) | 一种输电线路引流线长度测定装置及测定方法 | |
CN205066632U (zh) | 一种建筑工程测量尺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131016 Termination date: 20180507 |
|
CF01 | Termination of patent right due to non-payment of annual fee |