CN203229160U - Production line for large-specification wire harnesses - Google Patents
Production line for large-specification wire harnesses Download PDFInfo
- Publication number
- CN203229160U CN203229160U CN 201320216435 CN201320216435U CN203229160U CN 203229160 U CN203229160 U CN 203229160U CN 201320216435 CN201320216435 CN 201320216435 CN 201320216435 U CN201320216435 U CN 201320216435U CN 203229160 U CN203229160 U CN 203229160U
- Authority
- CN
- China
- Prior art keywords
- big specification
- workstation
- underframe
- support frame
- production line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Automatic Assembly (AREA)
Abstract
The utility model discloses a big specification pencil production water line, and provide one kind and can be adapted to the assembly line that big specification pencil production needs. Including workstation, support frame, workstation car, sideslip mechanism, the support frame includes two chassis, sliding connection between workstation car and the chassis, and sideslip mechanism installs in the one end of two chassis, installs the grudging post on every chassis respectively, and the workstation includes workstation and work panel, fixed connection between work panel and the workstation, and the leading wheel is installed respectively at the stand top of workstation, be provided with on the grudging post of support frame with leading wheel complex track. An operation platform is arranged between the two bottom frames. The utility model discloses an assembly line, at the in-process that the work panel removed, the leading wheel removes in the track, plays the supporting role, can prevent the work panel upset to realize the production of big specification pencil product, improved the production efficiency of big specification product.
Description
Technical field
The utility model relates to the wire harness production technical field, particularly relates to a kind of big specification wire harness flow production line.
Background technology
At the automotive wire bundle production field, adopt the cross slide type conveyor line to carry out the production of wire harness in order to enhance productivity.
At present, the wire harness flow production line mainly comprises bench board, bracing frame, boom truck, transverse-moving mechanism, bracing frame comprises two underframe, sliding block joint between boom truck and the underframe, transverse-moving mechanism is installed on an end of two underframe, bench board and bracing frame two ends be separately installed with the switching mechanism that matches to realize the upset of working panel on the bench board.
Along with continuous advancement in technology, develop the bunch product of big specification gradually.Because the bunch product of big specification needs bigger bench board, existing conveyor line is owing to the restriction of structure, and mainly to produce the small dimension product, the product of big specification can only adopt manual production, has influenced production efficiency.
The utility model content
The purpose of this utility model is at the technological deficiency that exists in the prior art, and a kind of conveyor line that can be adapted to the needs of big specification wire harness production is provided.
For realizing that the technical scheme that the purpose of this utility model adopts is:
A kind of big specification wire harness flow production line, comprise bench board, bracing frame, boom truck, transverse-moving mechanism, support frame as described above comprises two underframe, sliding block joint between described boom truck and the described underframe, described transverse-moving mechanism is installed on an end of two described underframe, it is characterized in that, be separately installed with stand on each described underframe, described bench board comprises falsework and working panel, captive joint between described working panel and the described falsework, the column top of described falsework is separately installed with track adjusting wheel, and the stand of support frame as described above is provided with the track that cooperates with described track adjusting wheel.
Between two described underframe the operation platform is installed.
Between described boom truck and the described underframe by guide wheel and guideway sliding block joint.
Compared with prior art, the beneficial effects of the utility model are:
1, in the conveyor line of the present utility model, working panel is captiveed joint with falsework, the column top of falsework is separately installed with track adjusting wheel, and the stand of bracing frame is provided with the track that cooperates with track adjusting wheel, in the process that working panel moves, track adjusting wheel moves along track, plays a supporting role, can prevent the working panel upset, thereby realize the production of big specification bunch product.
2, in the conveyor line of the present utility model, the operation platform is installed between two underframe, carries out the operation of lower part in a side, stand in the operation of carrying out the first half on the operation platform, thereby realize the production of big specification product, improved big specification production efficiency of products.
Description of drawings
Figure 1 shows that the scheme drawing of the big specification wire harness of the utility model flow production line.
Among the figure: 1. transverse-moving mechanism, 2. boom truck, 3. falsework, 4. working panel, 5. track adjusting wheel, 6. track, 7. stand, 8. underframe, 9. operation platform.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
The scheme drawing of big specification wire harness flow production line of the present utility model comprises bench board, bracing frame, boom truck 2, transverse-moving mechanism 1 as shown in Figure 1, and support frame as described above comprises two underframe 8, sliding block joint between described boom truck 2 and the described underframe 8.In the present embodiment, between described boom truck and the described underframe by guide wheel and guide rail sliding block joint.Described transverse-moving mechanism 1 is installed on an end of two described underframe 8, be separately installed with stand 7 on each described underframe 8, described bench board comprises falsework 3 and working panel 4, captive joint between described working panel 4 and the described falsework 3, the column top of described falsework 3 is separately installed with track adjusting wheel 5, and the stand of support frame as described above is provided with the track 6 that cooperates with described track adjusting wheel 5.
For easy to operate, operation platform 9 is installed between two described underframe 8.
During use, processed product is placed on the working panel 4, boom truck 2 is mobile at underframe 8, moves thereby drive working panel 4, and track adjusting wheel is mobile in orbit.In the process that working panel moves, at the operating personal of underframe one side the working panel lower part is operated accordingly.When boom truck 2 moves to transverse-moving mechanism 1 position, transverse-moving mechanism 1 with boom truck and on working panel together move on the underframe of opposite side, operating personal stands in operation and the working panel first half is operated accordingly on the platform.Conveyor line of the present utility model can be suitable for long more than 10 meters, and wide 1.2 meters big specification working panel has enlarged the range of capacity of conveyor line, has improved big specification production efficiency of products.
The above only is preferred implementation of the present utility model; should be noted that; for those skilled in the art; under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (3)
1. one kind big specification wire harness flow production line, comprise bench board, bracing frame, boom truck, transverse-moving mechanism, support frame as described above comprises two underframe, sliding block joint between described boom truck and the described underframe, described transverse-moving mechanism is installed on an end of two described underframe, it is characterized in that, be separately installed with stand on each described underframe, described bench board comprises falsework and working panel, captive joint between described working panel and the described falsework, the column top of described falsework is separately installed with track adjusting wheel, and the stand of support frame as described above is provided with the track that cooperates with described track adjusting wheel.
2. big specification wire harness flow production line according to claim 1 is characterized in that, between two described underframe the operation platform is installed.
3. big specification wire harness flow production line according to claim 1 and 2 is characterized in that, between described boom truck and the described underframe by guide wheel and guide rail sliding block joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320216435 CN203229160U (en) | 2013-04-25 | 2013-04-25 | Production line for large-specification wire harnesses |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320216435 CN203229160U (en) | 2013-04-25 | 2013-04-25 | Production line for large-specification wire harnesses |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203229160U true CN203229160U (en) | 2013-10-09 |
Family
ID=49285299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320216435 Expired - Fee Related CN203229160U (en) | 2013-04-25 | 2013-04-25 | Production line for large-specification wire harnesses |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203229160U (en) |
-
2013
- 2013-04-25 CN CN 201320216435 patent/CN203229160U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102976055A (en) | Detachable roller carrying frame | |
CN203698230U (en) | Simple moving vehicle washing device | |
CN201244718Y (en) | Automatic welder for thick wall pipeline | |
CN103359481B (en) | A kind of workpiece promotes gathering-device | |
CN103522038B (en) | A kind of stifle automatic assembling apparatus of lockset | |
CN203229160U (en) | Production line for large-specification wire harnesses | |
CN103400653A (en) | Lead frame | |
CN204774080U (en) | Printing device | |
CN202466322U (en) | Movable cross rail connecting device | |
CN204772476U (en) | Remove tool slide | |
CN203343736U (en) | Sawing machine base | |
CN104157369A (en) | Cable frame | |
CN203831001U (en) | Multi-station positioning positioner | |
CN204194228U (en) | Simple and easy paster point glue equipment | |
CN203527447U (en) | Moving vehicle device for supercharger repairing roll-over table | |
CN203509415U (en) | Assembling equipment used for multifunctional integrated passenger car | |
CN203410650U (en) | Profile steel collecting device | |
CN203156201U (en) | Flame cutting machine frame | |
CN206029058U (en) | Welding machines hand running gear | |
CN103909376B (en) | A kind of upper body positioner | |
CN205342289U (en) | Freight train floor pressure equipment frock | |
CN104085097A (en) | Roller-type plastic pipe traction machine | |
CN203209769U (en) | Cutting machine for cutting steel wire mesh | |
CN201639192U (en) | Control device of cable inserting and guiding mechanism | |
CN203363003U (en) | Drag chain special for port overlong transportation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 300392 Tianjin City Huayuan Industrial Zone (outer ring) three Haitai Development Road No. 8 Building No. 6, 1 to 2 Patentee after: CNC machinery (Tianjin) Co., Ltd. Address before: 300384 Tianjin Binhai Huayuan Industrial Zone in Guangdong Road No. 6 Building No. 2 2 101-2 Patentee before: Gehao wind cable Nb (Tianjin) Machinery Co. Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131009 Termination date: 20160425 |