CN203223898U - Blast furnace gas boiler superheater layout structure - Google Patents

Blast furnace gas boiler superheater layout structure Download PDF

Info

Publication number
CN203223898U
CN203223898U CN 201320176804 CN201320176804U CN203223898U CN 203223898 U CN203223898 U CN 203223898U CN 201320176804 CN201320176804 CN 201320176804 CN 201320176804 U CN201320176804 U CN 201320176804U CN 203223898 U CN203223898 U CN 203223898U
Authority
CN
China
Prior art keywords
superheater
collection case
temperature superheater
blast furnace
furnace gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320176804
Other languages
Chinese (zh)
Inventor
韦志平
何雁飞
薛金彪
孟慧
耿长萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Boiler Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN 201320176804 priority Critical patent/CN203223898U/en
Application granted granted Critical
Publication of CN203223898U publication Critical patent/CN203223898U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a blast furnace gas boiler superheater layout structure. The requirement of high-pressure high-temperature parameters can be met after superheaters and an economizer are arranged, heat produced by combustion can be fully utilized, and energy source can be saved. The blast furnace gas boiler superheater layout structure comprises a hearth, a horizontal flue, a vertical flue, the superheaters and the economizer, wherein the inlet section of the horizontal flue is arranged above the hearth; and the outlet end of the horizontal flue is communicated with the vertical flue. The blast furnace gas boiler superheater layout structure is characterized in that the superheaters comprise a high-temperature superheater, a medium-temperature superheater and a low-temperature superheater; the high-temperature superheater and the medium-temperature superheater are arranged in the horizontal flue in sequence; the low-temperature superheater is arranged in the upper section of the vertical flue; the economizer is arranged under the low-temperature superheater; saturated vapor on the top of a boiler drum is communicated to an inlet header of the low-temperature superheater through a connecting pipe; and an outlet header of the low-temperature superheater is communicated to an inlet header of the medium-temperature superheater through a pipeline after being connected to a first-stage spray type desuperheater.

Description

A kind of blast furnace gas boiler superheater arrangement
Technical field
The utility model relates to the technical field of structures of blast furnace gas boiler, is specially a kind of blast furnace gas boiler superheater arrangement.
Background technology
Because the blast furnace gas calorific capacity is extremely low, a little less than the Fire Radiation ability, radiation heat absorption capacity wretched insufficiency in the burner hearth, a large amount of caloric requirements absorb by back-end surfaces, but in order to control the boiling rate of economizer exit, can not arrange too much economizer area again; Existing blast furnace gas boiler, the superheater of its layout, economizer can not satisfy the demand of HTHP parameter, and the heat that makes burning produce can not be fully utilized, waste energy.
Summary of the invention
At the problems referred to above, the utility model provides a kind of blast furnace gas boiler superheater arrangement, and it makes superheater, the postpone of economizer cloth can satisfy the demand of HTHP parameter, and the heat that makes burning produce is fully used energy savings.
A kind of blast furnace gas boiler superheater arrangement, its technical scheme is such: it comprises burner hearth, horizontal flue, vertical flue, superheater, economizer, the top of described burner hearth is the entrance of horizontal flue, the port of export of described horizontal flue is communicated with described vertical flue, it is characterized in that: described superheater comprises high temperature superheater, medium temperature overheater, low temperature superheater, described high temperature superheater, medium temperature overheater is arranged in the described horizontal flue in turn, described low temperature superheater is arranged in the epimere of described vertical flue, the below of described low temperature superheater is provided with described economizer, the saturated vapor at drum top is communicated to the entrance collection case of described low temperature superheater by tube connector, the outlet collection case of described low temperature superheater connects behind the one-level direct-contact desuperheater by the entrance collection case of pipeline connection to described medium temperature overheater, the outlet collection case of described medium temperature overheater is introduced the entrance collection case that is communicated to described high temperature superheater behind the secondary direct-contact desuperheater by pipeline, and the outlet collection case of described high temperature superheater is by the collection vapour collection case of pipeline connection outside.
It is further characterized in that: the coiled pipe counter-flow arrangement from entrance collection case to outlet collection case of described low temperature superheater;
Following current is arranged after the coiled pipe elder generation adverse current from entrance collection case to outlet collection case of described medium temperature overheater;
Following current is arranged after the coiled pipe elder generation adverse current from entrance collection case to outlet collection case of described high temperature superheater.
After adopting structure of the present utility model, the saturated vapor at drum top is communicated to the entrance collection case of low temperature superheater by tube connector, enter low temperature superheater outlet collection case then, behind the one-level direct-contact desuperheater, enter medium temperature overheater entrance collection case, enter medium temperature overheater outlet collection case then, introduce the secondary direct-contact desuperheater by pipeline, enter high temperature superheater entrance collection case behind the desuperheat, enter high temperature superheater outlet collection case then, this moment, steam reached the export amount fixed temperature of boiler, be connected to collection vapour collection case with tube connector more at last, owing to arranged three, and low superheater is arranged in the vertical gas pass, and it makes the area of the economizer that vertical gas pass is interior reduce relatively, has controlled the boiling rate of economizer exit, a large amount of heats are absorbed by superheater, it makes superheater, the postpone of economizer cloth can be satisfied the demand of HTHP parameter, and the heat that makes burning produce is fully used energy savings.
Description of drawings
Fig. 1 is front view structural representation of the present utility model.
The specific embodiment
See Fig. 1, it comprises burner hearth 1, horizontal flue 2, vertical flue 3, superheater, economizer 4, the top of burner hearth 1 is the entrance of horizontal flue 2, the port of export of horizontal flue 2 is communicated with vertical flue 3, superheater comprises high temperature superheater 5, medium temperature overheater 6, low temperature superheater 7, high temperature superheater 5, medium temperature overheater 6 is arranged in the horizontal flue 2 in turn, low temperature superheater 7 is arranged in the epimere of vertical flue 3, the below of low temperature superheater 7 is provided with economizer 4, drum (does not draw among the figure, belonging to existing mature technology) saturated vapor at top is communicated to the entrance collection case 9 of low temperature superheater 7 by tube connector 8, the outlet collection case 10 of low temperature superheater 7 connects one-level direct-contact desuperheater 11 backs by the entrance collection case 12 of pipeline connection to medium temperature overheater 6, the outlet collection case 13 of medium temperature overheater 6 is introduced the entrance collection case 15 that is communicated to high temperature superheater 5 behind the secondary direct-contact desuperheater 14 by pipeline, and the outlet collection case 16 of high temperature superheater 5 is by the collection vapour collection case 17 of pipeline connection outside.
The coiled pipe counter-flow arrangement from entrance collection case 9 to outlet collection case 10 of low temperature superheater 7; Following current is arranged after the coiled pipe elder generation adverse current from entrance collection case 12 to outlet collection case 13 of medium temperature overheater 6; Following current is arranged after the coiled pipe elder generation adverse current from entrance collection case 15 to outlet collection case 16 of high temperature superheater 5.

Claims (4)

1. blast furnace gas boiler superheater arrangement, it comprises burner hearth, horizontal flue, vertical flue, superheater, economizer, the top of described burner hearth is the entrance of horizontal flue, the port of export of described horizontal flue is communicated with described vertical flue, it is characterized in that: described superheater comprises high temperature superheater, medium temperature overheater, low temperature superheater, described high temperature superheater, medium temperature overheater is arranged in the described horizontal flue in turn, described low temperature superheater is arranged in the epimere of described vertical flue, the below of described low temperature superheater is provided with described economizer, the saturated vapor at drum top is communicated to the entrance collection case of described low temperature superheater by tube connector, the outlet collection case of described low temperature superheater connects behind the one-level direct-contact desuperheater by the entrance collection case of pipeline connection to described medium temperature overheater, the outlet collection case of described medium temperature overheater is introduced the entrance collection case that is communicated to described high temperature superheater behind the secondary direct-contact desuperheater by pipeline, and the outlet collection case of described high temperature superheater is by the collection vapour collection case of pipeline connection outside.
2. a kind of blast furnace gas boiler superheater arrangement according to claim 1 is characterized in that: the coiled pipe counter-flow arrangement from entrance collection case to outlet collection case of described low temperature superheater.
3. a kind of blast furnace gas boiler superheater arrangement according to claim 1 is characterized in that: following current layout after the coiled pipe elder generation adverse current from entrance collection case to outlet collection case of described medium temperature overheater.
4. a kind of blast furnace gas boiler superheater arrangement according to claim 1 is characterized in that: following current layout after the coiled pipe elder generation adverse current from entrance collection case to outlet collection case of described high temperature superheater.
CN 201320176804 2013-04-10 2013-04-10 Blast furnace gas boiler superheater layout structure Expired - Fee Related CN203223898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320176804 CN203223898U (en) 2013-04-10 2013-04-10 Blast furnace gas boiler superheater layout structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320176804 CN203223898U (en) 2013-04-10 2013-04-10 Blast furnace gas boiler superheater layout structure

Publications (1)

Publication Number Publication Date
CN203223898U true CN203223898U (en) 2013-10-02

Family

ID=49250901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320176804 Expired - Fee Related CN203223898U (en) 2013-04-10 2013-04-10 Blast furnace gas boiler superheater layout structure

Country Status (1)

Country Link
CN (1) CN203223898U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103335299A (en) * 2013-04-10 2013-10-02 无锡华光锅炉股份有限公司 Superheater layout structure of blast-furnace gas boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103335299A (en) * 2013-04-10 2013-10-02 无锡华光锅炉股份有限公司 Superheater layout structure of blast-furnace gas boiler

Similar Documents

Publication Publication Date Title
CN203431902U (en) Smoke system reducing exhaust smoke temperature of secondary reheating boiler
CN203431914U (en) Flue gas system using air pre-heater of quartered-sector structure to reduce exhaust gas temperature of secondary reheating boiler
CN205717146U (en) A kind of ultrahigh pressure coal gas boiler
CN106288830A (en) A kind of smelting furnace waste heat boiler
CN103344124A (en) Lime kiln waste gas waste heat electricity generating system with by-product coal gas afterburning function
CN204534518U (en) Three backhaul combustion gas condensation steam boilers
CN102364244A (en) Ultra supercritical boiler with parameter of more than 700 DEG C having secondary re-heating function
CN103335299A (en) Superheater layout structure of blast-furnace gas boiler
CN103528386B (en) Multi-variant phase change waste heat boiler system
CN203549787U (en) Single-pressure saturated vapor superheated boiler
CN203223898U (en) Blast furnace gas boiler superheater layout structure
CN104406144A (en) Double-medium waste heat boiler
CN203443378U (en) Improved lime kiln waste gas residual heat power generation system with byproduct gas afterburning
CN208475293U (en) A kind of combined type afterheat utilizing system structure
CN204478002U (en) Super-pressure reheating biomass fuel boiler
CN210153757U (en) Biomass direct-combustion energy-saving steam-water circulation system of circulating fluidized bed boiler
CN209540846U (en) The horizontal side wall opposed firing boiler radiation heating-surface arragement construction of 700 DEG C of double reheats
CN108072026A (en) A kind of Novel supercritical direct current three-pressure reheat waste heat boiler
CN102252306A (en) Energy-saving boiler for combustion test
CN203686990U (en) Steam injection boiler
CN202177094U (en) Superheating device capable of regulating steam temperature of boiler
CN105180132A (en) Novel fuel oil and fuel gas steam boiler
CN203501821U (en) Multi-phase change waste heat boiler system
CN103322552A (en) Single-pressure saturated-steam superheat boiler
CN106369588A (en) Gas-fired boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002