CN203218796U - Operation platform for high-altitude line construction - Google Patents
Operation platform for high-altitude line construction Download PDFInfo
- Publication number
- CN203218796U CN203218796U CN 201320114792 CN201320114792U CN203218796U CN 203218796 U CN203218796 U CN 203218796U CN 201320114792 CN201320114792 CN 201320114792 CN 201320114792 U CN201320114792 U CN 201320114792U CN 203218796 U CN203218796 U CN 203218796U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- platform
- supported
- operating platform
- work high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title abstract 3
- 229910052573 porcelain Inorganic materials 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract 3
- 239000012212 insulator Substances 0.000 abstract 1
- 230000034994 death Effects 0.000 description 2
- 231100000517 death Toxicity 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000012211 strain insulator Substances 0.000 description 1
Images
Abstract
The utility model discloses an operation platform for high-altitude line construction, which comprises a left support guardrail, a right support guardrail, a back support guardrail, a pedestal platform, a rope fixing loop and hooks. The left, right and back support guardrails are respectively arranged at two sides and the back side of the pedestal platform, the rope fixing loop is arranged on the pedestal platform, and the hooks are arranged over the back support guardrail. The operation platform for high-altitude line construction is simple and firm in structure, convenient for material drawing, preparation and use, low in dead weight and high in bearing force; is not influenced by operated leads or porcelain insulators and the like; effectively improves safety of work staff while reducing operation difficulty and working intensity; and can be widely popularized and applied very easily.
Description
Technical field
The utility model relates to a kind of operating platform, particularly a kind of circuit work high above the ground operating platform.
Background technology
Set up and change at overhead transmission line in the operation such as strain insulator porcelain vase, use the flat ladder of aluminium alloy as operating platform usually.This operating platform is dangerous also to be unfavorable for operation.At first, in the circuit work high above the ground, must tighten up operation to lead, in case go wrong the danger that lead disengaging cross-arm flies out can take place.The lead huge pulling force that produces that flies out will make operating personnel's peace ladder together fly out with it, certainly will cause injures and deaths.Even if the operating personnel does not fly out with lead, but this moment, it broke away from flat ladder, only depended on the protection of two control safety rope, in case two control safety rope goes wrong, also will cause injures and deaths.Secondly, be sitting in flat terraced upward operation and often make not energetically, increased operating personnel's operation easier and working strength.
The utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, providing a kind of can all hang over circuit work high above the ground personnel's safety belt, two control safety rope and operating platform on the fixing member, and can make as though walking upon flat ground, the handy circuit work high above the ground operating platform of operating of operating personnel.
A kind of circuit work high above the ground operating platform, its structural feature is: comprise that guardrail is supported on left side support guardrail, the right side, the back is supported guardrail, base platform, lanyard ring, reached and link up with, left and right and back is supported guardrail and is divided into base platform both sides and rear side, the base platform is provided with the lanyard ring, is provided with hook above back support guardrail.
Circuit work high above the ground operating platform of the present utility model when operation, hangs over the hook of circuit work high above the ground operating platform on the fixing member such as cross-arm, on the lanyard ring, pricks a rope, draws in ground.Appropriate location on ground arranges ground anchor peg, be used for fixing under drawing from the lanyard ring rope and tighten up.After operating platform hangs up properly, in operating platform, stand on the base platform under the operating personnel, safety belt is fixed on the operating platform, two control safety ropes are hung over fixing member appropriate position, can begin operation.
Guardrail is supported on a described left side, right support guardrail is right-angled triangle.
The less angle of described right-angled triangle is between 40 °-43 °, and stile is short, and horizontal edge is long, and stile length is less than or equal to 800mm, and horizontal edge length is less than or equal to 1000mm.
In sum, the utility model following advantage compared to existing technology:
Circuit work high above the ground operating platform of the present utility model is simple in structure firmly, draws materials, making, easy to use, and is strong from heavy and light, bearing capacity; Be not subjected to the influence of operated lead or porcelain vase string etc., when effectively promoting operating personnel's fail safe, alleviated operation easier and working strength; Very easily promote, application prospect is extensive.
Description of drawings
Fig. 1 is circuit work high above the ground operating platform structure chart.
Fig. 2 is the on-the-spot schematic diagram that uses of circuit work high above the ground operating platform.
Embodiment
Be described in more detail below in conjunction with the utility model of embodiment.
A kind of circuit work high above the ground operating platform shown in Fig. 1-2, comprise that guardrail 2 is supported on left side support guardrail 1, the right side, the back is supported guardrail 3, base platform 4, lanyard ring 6, reached and link up with 5, left and right and back is supported guardrail and is divided into base platform both sides and rear side, guardrail is supported on a left side, the right side is supported guardrail, back support guardrail or base platform and is provided with the lanyard ring, is provided with hook above back support guardrail.Guardrail is supported on a described left side, right support guardrail is right-angled triangle.The less angle of described right-angled triangle is between 40 °-43 °, and stile is short, and horizontal edge is long, and stile length is less than or equal to 800mm, and horizontal edge length is less than or equal to 1000mm.Described lanyard ring is arranged at the medium position that the hurdle is supported in base platform next-door neighbour back.
It is same as the prior art that present embodiment is not stated part.
Claims (3)
1. circuit work high above the ground operating platform, it is characterized in that: comprise that guardrail is supported on left side support guardrail, the right side, the back is supported guardrail, base platform, lanyard ring, reached and link up with, left and right and back is supported guardrail and is divided into base platform both sides and rear side, the base platform is provided with the lanyard ring, is provided with hook above back support guardrail.
2. circuit work high above the ground operating platform according to claim 1 is characterized in that: guardrail is supported on a described left side, right to support guardrail be right-angled triangle.
3. circuit work high above the ground operating platform according to claim 2 is characterized in that: the less angle of described right-angled triangle is between 40 °-43 °, and stile is short, and horizontal edge is long, and stile length is less than or equal to 800mm, and horizontal edge length is less than or equal to 1000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320114792 CN203218796U (en) | 2013-03-13 | 2013-03-13 | Operation platform for high-altitude line construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320114792 CN203218796U (en) | 2013-03-13 | 2013-03-13 | Operation platform for high-altitude line construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203218796U true CN203218796U (en) | 2013-09-25 |
Family
ID=49208299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320114792 Expired - Fee Related CN203218796U (en) | 2013-03-13 | 2013-03-13 | Operation platform for high-altitude line construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203218796U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113889916A (en) * | 2021-10-15 | 2022-01-04 | 广东电网有限责任公司 | Multifunctional wire tightening operation platform for distribution line |
-
2013
- 2013-03-13 CN CN 201320114792 patent/CN203218796U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113889916A (en) * | 2021-10-15 | 2022-01-04 | 广东电网有限责任公司 | Multifunctional wire tightening operation platform for distribution line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203175023U (en) | Counter weight type cantilever hanging basket device | |
CN205713018U (en) | A kind of construction parapodium | |
CN203218796U (en) | Operation platform for high-altitude line construction | |
CN104037658B (en) | Pendency glass insulator strings promotes system | |
CN201843537U (en) | Portable polished rod clamp dismounting ladder | |
CN203298145U (en) | Illuminating lamp for construction site of construction engineering | |
CN204643644U (en) | A kind of novel building small-sized crane | |
CN202516192U (en) | Mobile anti-falling device | |
CN205170159U (en) | Can hang hoist that hangs in overhead traveling crane | |
CN205355632U (en) | Safe and reliable's high altitude safety hanger | |
CN204737645U (en) | Hoisting accessory | |
CN202000883U (en) | Rope ladder structure for rapid safety escape | |
CN204012462U (en) | A kind of for setting up the suspender of wire | |
CN204967120U (en) | Wire exhibition of pulling is put special steel pipe and is strideed across frame | |
CN205840757U (en) | A kind of Liftable formula portable lifesaving aerial ladder | |
CN204266607U (en) | A kind of high-voltage line protective frame | |
CN203319523U (en) | Cathode carbon block hanger for aluminum electrolysis cell | |
CN202840363U (en) | Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit | |
CN204024440U (en) | Multifunctional ladder | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN205335747U (en) | Strain insulator string device is singly gone here and there in light -duty play of folded cascade | |
CN202611560U (en) | Insulative ladder capable of hanging safety device conveniently | |
CN204002511U (en) | A kind of three-dimensional arrangement ladder | |
CN106014181B (en) | Insulation outlet flat ladder with scalable guardrail | |
CN103326274B (en) | A kind of insulated mast assembly stands up instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130925 Termination date: 20200313 |
|
CF01 | Termination of patent right due to non-payment of annual fee |