CN203217410U - Temperature and humidity control device of cement/concrete curing chamber - Google Patents

Temperature and humidity control device of cement/concrete curing chamber Download PDF

Info

Publication number
CN203217410U
CN203217410U CN 201320218899 CN201320218899U CN203217410U CN 203217410 U CN203217410 U CN 203217410U CN 201320218899 CN201320218899 CN 201320218899 CN 201320218899 U CN201320218899 U CN 201320218899U CN 203217410 U CN203217410 U CN 203217410U
Authority
CN
China
Prior art keywords
temperature
humidity control
control device
humidity
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320218899
Other languages
Chinese (zh)
Inventor
蒋飞平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU TRANSPORTATION SUPERVISION&CONSULTANTS Co Ltd
Original Assignee
CHANGZHOU TRANSPORTATION SUPERVISION&CONSULTANTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU TRANSPORTATION SUPERVISION&CONSULTANTS Co Ltd filed Critical CHANGZHOU TRANSPORTATION SUPERVISION&CONSULTANTS Co Ltd
Priority to CN 201320218899 priority Critical patent/CN203217410U/en
Application granted granted Critical
Publication of CN203217410U publication Critical patent/CN203217410U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a temperature and humidity control device of a cement/concrete curing chamber. The temperature and humidity control device has the innovation points that: the temperature and humidity control device comprises a temperature and humidity controller, a temperature and humidity sensor arranged in the curing chamber, an ultrasonic humidifier provided with a spray pump, a refrigerating/heating machine and a water tank, wherein the temperature and humidity sensor, the ultrasonic humidifier and the refrigerating/heating machine are respectively in telecommunication connection with the temperature and humidity controller, a water suction opening of the ultrasonic humidifier is arranged below the liquid level in the water tank, and a heat exchange coil of the refrigerating/heating machine is arranged at the bottom part of the water tank. The temperature and humidity control device has the advantages of low manufacturing cost, energy conservation and environment protection, and the like.

Description

The temperature and humidity control device of cement/concrete curing chamber
Technical field
The utility model relates to a kind of temperature and humidity control device, is specifically related to a kind of temperature and humidity control device that is applicable to cement/concrete curing chamber.
Background technology
The existing employed cement of civil engineering, concrete sample need to do standard curing in advance under a constant temperature, damp condition, and wherein, temperature will be controlled in 20 ± 2 ℃ of scopes, and humidity will be controlled in 〉=90% scope.
The Temperature and Humidity Control of the cement/concrete curing chamber of each test mechanism mainly contains two kinds of structures at present: first kind, comprise air-conditioning, heating water tank, ultrasonic humidifier and cooperate temperature and humidity control device, this structure has certain disadvantages: temperature and humidity is controlled respectively, and meeting phase mutual interference between the equipment, if starting of air conditioner refrigeration or heating function, the capital reduces air humidity, and heating water tank power is generally 3KW, rely on the raising water temperature to regulate the interior temperature and humidity of fog room, thermal effect is very low, poor effect.Wherein, what air-conditioning adopted is 1 or 1.5, and working equipment is many, the equipment manufacturing cost height, and general power is big, and all devices substantially all is in the long-term operation state, and energy consumption is big, and the Temperature and Humidity Control weak effect; Second kind, regulate the operation of temperature and humidity by adopting sprinkling equipment, but employed water pipe is expendable consumed product, the cost height, injection flow rate is big, and energy consumption is big.
Summary of the invention
The purpose of this utility model is, provides a kind of cost low, and the temperature and humidity control device of the cement/concrete curing chamber of energy-conserving and environment-protective, to overcome the deficiencies in the prior art.
In order to achieve the above object, the technical solution of the utility model is: a kind of temperature and humidity control device of cement/concrete curing chamber, its innovative point is: comprise temperature and humidity control instrument, be located at the Temperature Humidity Sensor in the fog room and have the ultrasonic humidifier of atomizing pump, and refrigeration/hot machine and water tank, described Temperature Humidity Sensor, ultrasonic humidifier and refrigeration/hot machine is connected with temperature and humidity control instrument telecommunications respectively, the water sucking mouth of described ultrasonic humidifier is arranged under the liquid level in the water tank, and freeze/heat exchange coil of hot machine is located at the bottom of water tank.
In technique scheme, the periphery that the exposed aerial heat exchange of described refrigeration/hot machine is taken over is coated with heat-insulation layer.
In technique scheme, described heat-insulation layer is the asbestos heat-insulation layers.
The good effect that the utility model has is: because after having adopted above-mentioned temperature and humidity control device, detect indoor temperature and humidity by Temperature Humidity Sensor, regulate the water temperature that places in the fog room inner water tank according to indoor temperature by temperature and humidity control instrument order refrigeration/hot machine again, ultrasonic humidifier is sprayed on the moisture of uniform temperature indoor, to regulate the humiture in the fog room, the utility model not only cost is low, effective, and energy-conserving and environment-protective, has realized the purpose of this utility model.
Description of drawings
Fig. 1 is the structural representation of a kind of concrete enforcement of the present utility model.
Embodiment
Below in conjunction with accompanying drawing and the embodiment that provides, the utility model is further described, but is not limited thereto.
As shown in Figure 1, a kind of temperature and humidity control device of cement/concrete curing chamber, comprise temperature and humidity control instrument 1, be located at the Temperature Humidity Sensor 2 in the fog room and have the ultrasonic humidifier 3 of atomizing pump, and refrigeration/hot machine 4 and water tank 5, described Temperature Humidity Sensor 2, ultrasonic humidifier 3 and refrigeration/hot machine 4 are connected with temperature and humidity control instrument 1 telecommunications respectively, the water sucking mouth of described ultrasonic humidifier 3 is arranged under the liquid level in the water tank 5, and freeze/the heat exchange coil 4-1 of hot machine 4 is located at the bottom of water tank 5.
As shown in Figure 1, the periphery of the exposed aerial heat exchange adapter 4-2 of described refrigeration/hot machine 4 is coated with heat-insulation layer 6.Described heat-insulation layer 6 is asbestos heat-insulation layers.
When the utility model used, excessive in order to prevent the humidity in the fog room, it was impaired to make that temperature and humidity control instrument 1 makes moist, and temperature and humidity control instrument 1 was placed on outdoor, simultaneously, will freeze/hot machine 4 also is placed on outdoor.And described refrigeration/hot machine 4 adopts civilian air conditioner.
The utility model course of work:
1, when Temperature Humidity Sensor 2 detects temperature in the fog room and is lower than 18 ℃, temperature and humidity control instrument 1 namely orders refrigeration/hot machine 4 to start heating function, start ultrasonic humidifier 3 simultaneously, by high temperature water smoke to improve the temperature in the fog room, also improved simultaneously the humidity in the fog room, when temperature reached 20 ℃, ultrasonic humidifier 3 and refrigeration/hot machine 4 quit work;
2, when Temperature Humidity Sensor 2 detects temperature in the fog room and is higher than 22 ℃, temperature and humidity control instrument 1 namely orders refrigeration/hot machine 4 to start refrigerating function, start ultrasonic humidifier 3 simultaneously, by low temperature water smoke to reduce the temperature in the fog room, also can improve simultaneously the humidity in the fog room, when temperature reached 20 ℃, ultrasonic humidifier 3 and refrigeration/hot machine 4 quit work;
3, when Temperature Humidity Sensor 2 detects the maintenance indoor humidity and is lower than 90%, temperature and humidity control instrument 1 namely orders refrigeration/hot machine 4 to quit work, and starts ultrasonic humidifier 3, to improve the humidity in the fog room, when the maintenance indoor humidity reached 95%, ultrasonic humidifier 3 quit work.
The utility model lab scale result shows that effect is well-content.

Claims (3)

1. the temperature and humidity control device of a cement/concrete curing chamber, it is characterized in that: comprise temperature and humidity control instrument (1), be located at the Temperature Humidity Sensor (2) in the fog room and have the ultrasonic humidifier (3) of atomizing pump, and refrigeration/hot machine (4) and water tank (5), described Temperature Humidity Sensor (2), ultrasonic humidifier (3) is connected with temperature and humidity control instrument (1) telecommunications respectively with refrigeration/hot machine (4), the water sucking mouth of described ultrasonic humidifier (3) is arranged under the liquid level in the water tank (5), and freeze/heat exchange coil (4-1) of hot machine (4) is located at the bottom of water tank (5).
2. the temperature and humidity control device of cement/concrete curing chamber according to claim 1 is characterized in that: the periphery that (4-2) taken in the exposed aerial heat exchange of described refrigeration/hot machine (4) is coated with heat-insulation layer (6).
3. the temperature and humidity control device of cement/concrete curing chamber according to claim 2, it is characterized in that: described heat-insulation layer (6) is the asbestos heat-insulation layers.
CN 201320218899 2013-04-26 2013-04-26 Temperature and humidity control device of cement/concrete curing chamber Expired - Fee Related CN203217410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320218899 CN203217410U (en) 2013-04-26 2013-04-26 Temperature and humidity control device of cement/concrete curing chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320218899 CN203217410U (en) 2013-04-26 2013-04-26 Temperature and humidity control device of cement/concrete curing chamber

Publications (1)

Publication Number Publication Date
CN203217410U true CN203217410U (en) 2013-09-25

Family

ID=49206930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320218899 Expired - Fee Related CN203217410U (en) 2013-04-26 2013-04-26 Temperature and humidity control device of cement/concrete curing chamber

Country Status (1)

Country Link
CN (1) CN203217410U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223340A (en) * 2016-08-19 2016-12-14 国网新疆电力公司经济技术研究院 Automatic flow controls to drip curing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223340A (en) * 2016-08-19 2016-12-14 国网新疆电力公司经济技术研究院 Automatic flow controls to drip curing system

Similar Documents

Publication Publication Date Title
CN203480339U (en) Temperature and humidity environmental test equipment thermal field uniform distribution device with uniformity less than 0.5 degree centigrade level
CN205357418U (en) Agricultural greenhouse heat sink
CN103471223A (en) Air conditioner without dripping water
CN203980928U (en) A kind of hot water cyclesystem of concrete segment curing kilns
CN203083063U (en) Humidifier
CN101532707B (en) Wireless networking constant humidity machine used in showcase
CN102706209A (en) Constant temperature control system for closed cooling tower
CN203217410U (en) Temperature and humidity control device of cement/concrete curing chamber
CN203274126U (en) Temperature and humidity control device of cement / concrete curing chamber
CN204983132U (en) Environmental protection intelligence building device
CN204720502U (en) A kind of solidifying lead acid battery polar plate room
CN205403057U (en) Intelligence house air conditioning control device based on cc2530
CN205164999U (en) Indoor water spray curing means
CN208263118U (en) A kind of new concrete fog room control device
CN202660970U (en) Closed cooling tower constant temperature control system
CN205191961U (en) Evaporative condenser experimental apparatus
CN204963055U (en) Heat facility falls
CN204830363U (en) Air conditioner drainage cyclic utilization device
CN105195344A (en) Indoor water spraying maintaining device
CN205116411U (en) Movable house with refrigeration that keeps warm function
CN204166420U (en) Concrete curing chamber's epidemic disaster homogeneity intelligent control system
CN209504465U (en) A kind of heated by natural gas system of curing kilns
CN203518176U (en) Air conditioner without dropping water
CN204100495U (en) A kind of concrete mark supports room temperature humidity control device
CN202747755U (en) Heat medium oil temperature control system of tobacco flue-curing house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20150426

EXPY Termination of patent right or utility model