CN203217356U - Remote management system for prefabricated pumping station - Google Patents

Remote management system for prefabricated pumping station Download PDF

Info

Publication number
CN203217356U
CN203217356U CN 201320227947 CN201320227947U CN203217356U CN 203217356 U CN203217356 U CN 203217356U CN 201320227947 CN201320227947 CN 201320227947 CN 201320227947 U CN201320227947 U CN 201320227947U CN 203217356 U CN203217356 U CN 203217356U
Authority
CN
China
Prior art keywords
control terminal
water pump
pumping plant
communication network
pumping station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320227947
Other languages
Chinese (zh)
Inventor
孟祥岩
夏磊
马建英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Liangcheng Environmental Protection Technology Co ltd
Original Assignee
SHANDONG REACHEN ENVIRONMENTAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG REACHEN ENVIRONMENTAL ENGINEERING Co Ltd filed Critical SHANDONG REACHEN ENVIRONMENTAL ENGINEERING Co Ltd
Priority to CN 201320227947 priority Critical patent/CN203217356U/en
Application granted granted Critical
Publication of CN203217356U publication Critical patent/CN203217356U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The utility model relates to a remote management system for a prefabricated pumping station. The system is composed of a monitoring center, a communication network, a control terminal, and peripheral equipment. The monitoring center (1) is connected with the communication network (2); the communication network (2) is connected with the control terminal (3); and the control terminal (3) is connected with the peripheral equipment (4). Specifically, the monitoring center (1) consists of a pumping station water level gauge, a water pump, a water pump alarm, a crushing grating machine, and a security alarm. The pumping station computer control terminal (3) is installed beside a water pump starting cabinet of the pumping station. And the peripheral equipment (4) includes a water level gauge, a camera and control cloud platform, a flowmeter, an attendance machine, an infrared alarm and a noxious gas alarm. The main functions of the system are as follows: the pumping station employs an unmanned-duty mode; a professional maintenance team is organized to carry out routing inspection; a monitoring center is established; and all prefabricated pumping stations within the jurisdiction can be managed by a centralized way.

Description

A kind of prefabricated pumping plant long-distance management system
Technical field
A kind of prefabricated pumping plant long-distance management system of the utility model provides a kind of sewage discharge prefabricated pumping plant long-distance management system, belongs to sewage treatment area.
Background technology
The automaticity that the pumping plant integrated level lowly causes is difficult to improve, make pumping plant usually lack effective monitoring and management, pumping plant has people's post, eight-hour shifts, a large amount of expenses are used for artificial, competent authorities can not grasp the pumping plant situation at any time, and equipment of pumping station hidden danger can not find in time that the efficiency of management is on the low side.
The utility model content
A kind of prefabricated pumping plant long-distance management system of the utility model, technical matters at above existence proposes a kind of addressing the aforementioned drawbacks exactly, provide a kind of sewage discharge prefabricated pumping plant long-distance management system, formed by Surveillance center, communication network, detection and control terminal, peripherals.Surveillance center is connected with communication network, and communication network is connected with detection and control terminal, and detection and control terminal is connected with peripherals; Surveillance center is made up of pumping plant water level meter, water pump, water pump alarm, pulverizing grid maker, security alarm device; Pumping plant computer measurement and control terminal is installed in water pump in pump station and starts by the cabinet; Peripherals is made up of water level meter, video camera and control The Cloud Terrace, flowmeter, attendance recorder, Infrared intrusion detector, warning device to harmful gas.
Surveillance center: can monitor each pumping plant water level, pump switch state, alarm condition, water pump electric current, water pump voltage, water discharge, pulverizing grid maker duty, security alarm.Can each water pump start and stop of Long-distance Control, grid start and stop, switching controls pattern; Can also realize concentrating picture to monitor the important station of each pumping plant, monitor a pumping plant separately, but the video information storing queries, the storage monitor data, the query monitor data generate various production reports, generate various analytic curves.
Communication network: managerial personnel can browse to the pumping plant relevant information by internal lan.Also can browse to the pumping plant relevant information by the Internet public network.
Pumping plant computer measurement and control terminal: be installed in water pump in pump station and start other water level signal, water pump voltage, current signal, water pump, grid status signal, startup cabinet alarm signal, security signal, vision signal, the control output signal of inserting of cabinet.
Peripherals: water level meter, video camera and control The Cloud Terrace, flowmeter, attendance recorder, Infrared intrusion detector, warning device to harmful gas.
Beneficial effect:
A kind of prefabricated pumping plant long-distance management system of the utility model has following principal feature to be had:
Unattended duty: each pumping plant can be realized unmanned, only needs the maintenance personal to patrol and examine;
Centralized management: operational factor and the environmental parameter collection of a prefabricated pumping plant are got up to manage concentratedly;
Safe and reliable: monitoring and control all adopt precision equipment to finish, and is safe and reliable;
Convenient and practical: the utilization of network technology, convenient and practical especially.
Description of drawings
Fig. 1 is a kind of prefabricated pumping plant long-distance management system of the utility model Structural representation.BySurveillance center (1), communication network (2), detection and control terminal (3), peripherals (4) are formed.
Specific implementation method
Below in conjunction with accompanying drawing a kind of prefabricated pumping plant long-distance management system of the utility model is described further.
A kind of prefabricated pumping plant long-distance management system of the utility model is made up of Surveillance center (1), communication network (2), detection and control terminal (3), peripherals (4); Surveillance center (1) is connected with communication network (2), and communication network (2) is connected with detection and control terminal (3), and detection and control terminal (3) is connected with peripherals (4); Surveillance center (1) is made up of pumping plant water level meter, water pump, water pump alarm, pulverizing grid maker, security alarm device; Pumping plant computer measurement and control terminal (3) is installed in water pump in pump station and starts by the cabinet; Peripherals (4) is made up of water level meter, video camera and control The Cloud Terrace, flowmeter, attendance recorder, Infrared intrusion detector, warning device to harmful gas.
Surveillance center (1) can monitor each pumping plant water level, pump switch state, alarm condition, water pump electric current, water pump voltage, water discharge, pulverizing grid maker duty, security alarm.Can each water pump start and stop of Long-distance Control, grid start and stop, switching controls pattern; Can also realize concentrating picture to monitor the important station of each pumping plant, monitor a pumping plant separately, but the video information storing queries, the storage monitor data, the query monitor data generate various production reports, generate various analytic curves.
Communication network (2): managerial personnel can browse to the pumping plant relevant information by internal lan.Also can browse to the pumping plant relevant information by the Internet public network.
Pumping plant computer measurement and control terminal (3) is installed in water pump in pump station and starts other water level signal, water pump voltage, current signal, water pump, grid status signal, startup cabinet alarm signal, security signal, vision signal, the control output signal of inserting of cabinet.

Claims (2)

1. a prefabricated pumping plant long-distance management system is characterized in that being made up of Surveillance center (1), communication network (2), detection and control terminal (3), peripherals (4); Surveillance center (1) is connected with communication network (2), and communication network (2) is connected with detection and control terminal (3), and detection and control terminal (3) is connected with peripherals (4); Surveillance center (1) is made up of pumping plant water level meter, water pump, water pump alarm, pulverizing grid maker, security alarm device; Pumping plant computer measurement and control terminal (3) is installed in water pump in pump station and starts by the cabinet.
2. as claims 1 described prefabricated pumping plant long-distance management system, it is characterized in that matching as requested following peripherals (4): water level meter, video camera and control The Cloud Terrace, flowmeter, attendance recorder, Infrared intrusion detector, warning device to harmful gas.
CN 201320227947 2013-05-01 2013-05-01 Remote management system for prefabricated pumping station Expired - Fee Related CN203217356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320227947 CN203217356U (en) 2013-05-01 2013-05-01 Remote management system for prefabricated pumping station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320227947 CN203217356U (en) 2013-05-01 2013-05-01 Remote management system for prefabricated pumping station

Publications (1)

Publication Number Publication Date
CN203217356U true CN203217356U (en) 2013-09-25

Family

ID=49206876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320227947 Expired - Fee Related CN203217356U (en) 2013-05-01 2013-05-01 Remote management system for prefabricated pumping station

Country Status (1)

Country Link
CN (1) CN203217356U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105163091A (en) * 2015-09-25 2015-12-16 江苏省泰州引江河管理处 Pump station engineering management integrated linkage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105163091A (en) * 2015-09-25 2015-12-16 江苏省泰州引江河管理处 Pump station engineering management integrated linkage system

Similar Documents

Publication Publication Date Title
CN103279078A (en) Remote management system for prefabricated pump stations
CN204926547U (en) Parking system based on stagger time parking stall sharing
CN102592424A (en) Wireless meter reading communication system
CN104092750A (en) Flood defense rainwater condition wireless monitoring station and monitoring method thereof
CN104266681A (en) Electric cable well state safety monitoring system based on Internet of Things and GIS
CN112396813A (en) Water meter data analysis early warning system
CN204204187U (en) A kind of electricity consumption based on GSM network gathers intelligent terminal
CN115460259A (en) Intelligent park management system and management method thereof
CN102929244A (en) Community energy management system and method
CN204203755U (en) Distribution environment comprehensive intelligent supervising device
CN206114728U (en) Box subscriber equipment that specially becomes
CN203217356U (en) Remote management system for prefabricated pumping station
CN204330009U (en) Based on the cable shaft status safety monitoring system of Internet of Things and GIS
CN203433076U (en) Line fault warning indicator system
CN203311234U (en) Monitoring system for photovoltaic power station
CN203224255U (en) Temperature/humidity monitoring alarm device for cable trench of unattended transformer substation
CN203179187U (en) Multi-polar intelligent anti-external-damage early warning device
CN204362217U (en) A kind of power transmission line corridor large-scale moving object limit for height prior-warning device
CN203799252U (en) Monitoring device for urban transportation equipment safety
CN206892576U (en) A kind of Energy Saving of Office Building control system
CN206640715U (en) A kind of transmission line of electricity external force damage prevention video monitoring system
CN203134041U (en) Transformer wireless anti-theft alarm device
CN202033442U (en) Zero-sequence current on-line monitoring device for meter box
CN205248917U (en) Electric power property remote management system
CN205120927U (en) Generating set remote monitoring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 255000 Liangxiang Industrial Park, Zhangdian District, Shandong, Central Road, No. 1, No.

Patentee after: SHANDONG LIANGCHENG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Address before: 255071 Liangxiang Industrial Park, Zhangdian District, Shandong, Central Road, No. 1, No.

Patentee before: SHANDONG REACHEN ENVIRONMENTAL ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

CF01 Termination of patent right due to non-payment of annual fee