CN203213111U - 一种预制静压方桩桩帽 - Google Patents

一种预制静压方桩桩帽 Download PDF

Info

Publication number
CN203213111U
CN203213111U CN 201320208251 CN201320208251U CN203213111U CN 203213111 U CN203213111 U CN 203213111U CN 201320208251 CN201320208251 CN 201320208251 CN 201320208251 U CN201320208251 U CN 201320208251U CN 203213111 U CN203213111 U CN 203213111U
Authority
CN
China
Prior art keywords
sleeves
pile
base plate
sleeve pipe
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320208251
Other languages
English (en)
Inventor
刘光星
李志钱
徐书龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201320208251 priority Critical patent/CN203213111U/zh
Application granted granted Critical
Publication of CN203213111U publication Critical patent/CN203213111U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种预制静压方桩桩帽,包括顶板、底板和复数根套管;顶板与套管的上端连接;底板与套管的下端连接;套管内腔通孔贯通顶板与底板。其中,底板的两侧设有吊环;套管数量及位置与方桩桩头外露的钢筋数量及位置一致;顶板与底板均为钢板制成;套管为钢制。本实用新型改变了传统的“破桩头”施工工艺,保证了上部桩的施工质量;降低了劳动强度,节约了资源;提高工效30%以上,而且促进了现场文明施工。

Description

一种预制静压方桩桩帽
技术领域
本实用新型涉及一种预制静压方桩桩帽。
背景技术
预制静压方桩施工噪音小、无污染,沉桩工艺简单,质量易于控制,综合经济效益较好,因此南方地区使用比较广泛。特别适合于高压缩性软弱地基土。
但多年来,在桩和上部承台连接施工中仍一直采用压桩——破桩头——整理桩头主筋——桩头与承台混凝土整体浇筑。
由于传统的“破桩头”施工法,一旦控制不好,不仅容易影响上部桩的施工质量,而且劳动强度大,费工费时,消耗资源。
发明内容
本实用新型要解决的技术问题是提供一种预制静压方桩桩帽。
为了解决上述技术问题,本实用新型采用的技术方案是:一种预制静压方桩桩帽,包括顶板、底板和复数根套管;顶板与套管的上端连接;底板与套管的下端连接;套管内腔通孔贯通顶板与底板。
作为优选,底板的两侧设有吊环。
作为优选,套管数量及位置与方桩桩头外露的钢筋数量及位置一致。
作为优选,顶板与底板均为钢板制成。
作为优选,套管为钢制。
本实用新型的有益效果是:
1、改变了传统的“破桩头”施工工艺,保证了上部桩的施工质量;
2、降低了劳动强度,节约了资源;
3、提高工效30%以上,而且促进了现场文明施工。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
图1是本实用新型预制静压方桩桩帽实施例的结构示意图。
图2是图1的A向剖视图。
图3是本实用新型预制静压方桩桩帽实施例的施工结构示意图。
图中,1-底板,2-顶板,3-套管,4-吊环,5-方桩,6-钢筋,7-送桩器。
具体实施方式
图1是一种用于预制静压方桩的桩帽,由顶板2、底板1、4根套管3和下板两侧的吊环4组成。其中顶板2与套管3的上端连接,底板1与套管3的下端连接,套管内腔通孔贯通顶板与底板(图2)。底板1两侧焊有2个吊环4。
顶板2与底板1均为钢板制成。套管3也为钢制。
如图3所示,制作时,要求套管数量及位置与方桩桩头外露的钢筋数量及位置一致,施工时即可套上方桩5桩头外露的预留钢筋6。
    使用方法如下:
    (1)施工时,按设计图纸要求,将与承台衔接部分的方桩5顶部先预留500mm长不浇混凝土,只露出钢筋即可;
(2)桩帽的外形尺寸依据方桩的横截面尺寸而定,桩帽顶板与底板各用一块钢板,上、下钢板借助中间钢管焊成一个整体。钢管的位置与桩内主筋的位置应相吻合,其底板上留孔与钢管内孔相通,以便于钢筋6穿入;
(3)为满足顶部桩压桩的需求,当顶部桩施压时,先将桩帽套在方桩5顶部外露的预留钢筋6上,借助桩帽对桩进行施压,直至将桩施压到位;
(4)施工时,桩帽随同最上一节桩一同起吊,就位后下压。在送桩器7上设有两个吊钩与桩帽底板两侧的两个吊环4相适配,开始送桩时,将送桩器7与桩帽通过吊环连接,沉桩结束后,桩帽随同送桩器一道取出。
以上所述的本实用新型实施方式,并不构成对本实用新型保护范围的限定。任何在本实用新型的精神和原则之内所作的修改、等同替换和改进等,均应包含在本实用新型的权利要求保护范围之内。

Claims (5)

1.一种预制静压方桩桩帽,其特征在于:包括顶板、底板和复数根套管;所述顶板与套管的上端连接;所述底板与套管的下端连接;所述套管内腔通孔贯通顶板与底板。
2.根据权利要求1所述的预制静压方桩桩帽,其特征在于:所述底板的两侧设有吊环。
3.根据权利要求1所述的预制静压方桩桩帽,其特征在于:所述套管数量及位置与方桩桩头外露的钢筋数量及位置一致。
4.根据权利要求1所述的预制静压方桩桩帽,其特征在于:所述顶板与底板均为钢板制成。
5.根据权利要求1所述的预制静压方桩桩帽,其特征在于:所述套管为钢制。
CN 201320208251 2013-04-23 2013-04-23 一种预制静压方桩桩帽 Expired - Fee Related CN203213111U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320208251 CN203213111U (zh) 2013-04-23 2013-04-23 一种预制静压方桩桩帽

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320208251 CN203213111U (zh) 2013-04-23 2013-04-23 一种预制静压方桩桩帽

Publications (1)

Publication Number Publication Date
CN203213111U true CN203213111U (zh) 2013-09-25

Family

ID=49202659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320208251 Expired - Fee Related CN203213111U (zh) 2013-04-23 2013-04-23 一种预制静压方桩桩帽

Country Status (1)

Country Link
CN (1) CN203213111U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594641A (zh) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 一种用于预制墙体安装的钢筋定位卡具及钢筋定位方法
CN107214843A (zh) * 2017-07-06 2017-09-29 中建八局第三建设有限公司 一种免截桩头型预制方桩施工装置及其施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594641A (zh) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 一种用于预制墙体安装的钢筋定位卡具及钢筋定位方法
CN107214843A (zh) * 2017-07-06 2017-09-29 中建八局第三建设有限公司 一种免截桩头型预制方桩施工装置及其施工方法

Similar Documents

Publication Publication Date Title
CN203200771U (zh) 接桩桩顶与承台连接结构
CN101761090A (zh) 海上风电机组的空间桁架式多桶基础
CN203213111U (zh) 一种预制静压方桩桩帽
CN206570955U (zh) 一种预制柱单孔灌浆装置
CN201593193U (zh) 海上风电机组的空间桁架式多桶基础
CN205116202U (zh) 预应力方桩与钢格构柱集成立柱
CN203229943U (zh) 桩基井挤扩承力盘钢筋布设结构
CN202359813U (zh) 一种立柱模板加固框
CN204676525U (zh) 高强度刚性挤土复合桩
CN203238621U (zh) 一种设置双层抗拉筋的灌注桩
CN205242441U (zh) 悬挂式椭圆形逆作竖井
CN201400892Y (zh) 液压桩头破碎装置
CN204098024U (zh) 一种二次注浆混凝土管桩施工装置
CN203947570U (zh) 一种基于3d打印的钢筋砼结构
CN202017203U (zh) 预应力离心管桩、方桩防挤土桩尖结构
CN206034423U (zh) 混凝土桩
CN202247879U (zh) 河堤打桩机
CN206718140U (zh) 一种生产预应力混凝土空心支护桩的模具
CN205012326U (zh) 一种双层下桩设备
CN105297758A (zh) 预应力方桩与钢格构柱集成立柱
CN206359993U (zh) 用于主变防火墙的托柱结构
CN205875876U (zh) 一种三角角钢通信钢塔桅的防风固定座
CN206266083U (zh) 预制钢筋混凝土化粪池专用吊钩
CN205875782U (zh) 用于地下室改建的加劲墙支护结构
CN105256793B (zh) 一种双层下桩设备

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20140423