CN203200313U - Inner plugging device for welding heat treatment of pipeline - Google Patents

Inner plugging device for welding heat treatment of pipeline Download PDF

Info

Publication number
CN203200313U
CN203200313U CN 201320172243 CN201320172243U CN203200313U CN 203200313 U CN203200313 U CN 203200313U CN 201320172243 CN201320172243 CN 201320172243 CN 201320172243 U CN201320172243 U CN 201320172243U CN 203200313 U CN203200313 U CN 203200313U
Authority
CN
China
Prior art keywords
pipeline
envelope piece
temperature
interior
interior envelope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320172243
Other languages
Chinese (zh)
Inventor
杜军
潘艳龙
吴庆东
倪晓红
吴光华
伍斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese energy construction group Anhui electric power builds the second Engineering Co., Ltd
Original Assignee
Ceec China Energy Engineering Group Co Ltd Anhui No2 Electric Power Engineering & Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec China Energy Engineering Group Co Ltd Anhui No2 Electric Power Engineering & Construction Corp filed Critical Ceec China Energy Engineering Group Co Ltd Anhui No2 Electric Power Engineering & Construction Corp
Priority to CN 201320172243 priority Critical patent/CN203200313U/en
Application granted granted Critical
Publication of CN203200313U publication Critical patent/CN203200313U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The utility model provides an inner plugging device for welding heat treatment of a pipeline. The inner plugging device comprises two cylindrical inner sealing blocks, wherein a first inner sealing block and a second inner sealing block are connected through a steel wire rope; one end of the steel wire rope stretches out of the first inner sealing block; the first inner sealing block is provided with an air inflating hole; the distance between the two inner sealing blocks is 40-60cm. In a welding process of the pipeline, the inner sealing blocks are arranged at the two ends of a welding line so that the heat loss generated when air in the pipeline flows in a heat treatment process of the pipeline is reduced; heat radiation of heat along axial and radial directions of the pipeline is relieved and a temperature gradient is reduced, so that metal in a uniform-temperature region can reach needed lowest temperature in a thickness direction. A temperature difference of inner and outer walls of the welding line is less than 20 degrees and the temperature of the inner wall is basically controlled to 760 DEG C, so as to reach the lower limit of a high-temperature annealing temperature required by SA335P92 steel.

Description

A kind of for the heat treated interior plugging device of pipeline welding
Technical field
The utility model belongs to the installation work technical field, is specifically related to a kind of for the heat treated interior plugging device of pipeline welding.
Background technology
Vapor temperature parameter owing to overcritical coal fired power generation unit is greatly improved at present, all adopted New Heat-Resistant Steel SA335P92 steel at high temperature parts such as hot arc and main steams, and the use of this heavy caliber thick wall New Heat-Resistant Steel has brought technical barrier for the construction welding.The weak link of whole welding joint is at weld seam, and the Toughness Ratio mother metal of general weld seam is much lower.And welding heat is processed the general flexible ceramic resistance heating device that adopts, the flexible ceramic electrical resistance heating is radiation heating, its principle of heating is the outside surface that passes to workpiece from the heat energy that well heater sends with the form of radiation, rely on metal heat-conducting, from outside surface to conducted inside, certainly exist thermograde.So in the postweld heat treatment process, thicken along with the wall thickness of processing pipeline and cause inside and outside wall temperature difference to increase thereupon.In addition, because narrow 760 ± 10 ℃ of P92 steel postweld heat treatment temperature range, the local weld seam thermal treatment temp of the inwall of welding joint probably is in thermal treatment temp and below the lower limit, thereby makes the performance of whole welding joint be in inhomogeneous state; Add the measuring error of temp measuring system various degrees of present equipment for Heating Processing and the fixed position form that thermopair adopts colligation, these all affect the accuracy of heat treatment process, and directly affect the toughness of welding joint.
Simultaneously, because of construction condition abominable more than the laboratory, heat dissipating state is complicated, welding heat work for the treatment of under the welding heat treatment process evaluation of making under the desirable operating mode and field working conditions has difference, under the guidance of procedure qualification, make the improvement that is fit to the thermal treatment process under the field working conditions particularly important for this reason.The related data demonstration, the postweld heat treatment temperature is at 760 ± 10 ℃, and in this temperature range, the postweld heat treatment of P92 steel welded joint could obtain good over-all properties, just reaches the lower limit of the high tempering temperature of SA335P92 steel requirement.For this reason, require large-sized heavy-wall tube under the resistive heating effect, the temperature difference of inside and outside wall is strict controlled in<20 ℃ scope in, just can guarantee the quality of welding joint.
The utility model content
In order to solve the problems of the technologies described above, it is a kind of for the heat treated interior plugging device of pipeline welding that the utility model provides, can effectively reduce inside and outside wall temperature difference problem, guarantee the homogeneity of whole property of welded joint in the P92 steel postweld heat treatment process, guarantee the impelling strength of the root of weld.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of for the heat treated interior plugging device of pipeline welding, comprise the columniform first interior envelope piece and the second interior envelope piece, be connected by wireline between the described first interior envelope piece and the second interior envelope piece, an end of wireline passes the first interior envelope piece; The described first interior envelope piece is provided with aeration aperture, and the distance in described two between the envelope piece is 40-60cm.
The described first interior envelope piece and the second interior envelope piece all are to be connected and fixed by screw rod by two block plates, are filled with insulating cotton between two block plates; The diameter of described insulating cotton is than the large 10-15cm of diameter of steel plate.
In order to reduce the inside and outside temperature head of pipeline, be provided with resistance wire between the described first interior envelope piece and the second interior envelope piece, an end of resistance wire passes the first interior envelope piece.Will pass the resistance wire energising heating of the first interior envelope piece, make the temperature increase of pipe interior, reduce the temperature head of itself and pipeline external.
For easy to operate, be equipped with hanger on the inboard steel plate of the described first interior envelope piece and the second interior envelope piece, described wireline and hanger are affixed.
The diameter of envelope piece is determined according to the pipe diameter of required welding in two of the present utility model, the diameter of general steel plate than the little 120mm of internal diameter of the pipeline about; And the diameter of insulating cotton than the large 20mm of internal diameter of the pipeline about.
The first interior envelope piece and the second interior envelope piece all are to fill cylindric that insulating cotton consists of by two block plates are middle, and the diameter of insulating cotton is larger than the diameter of steel plate, makes its edge soft, with inner-walls of duct energy close contact, have prevented the circulation of air.Connect by wireline between the envelope piece in two, consist of plugging device in the cover.When pipeline is welded; first interior plugging device is placed in the both sides pipeline of weld bond; then be filled with argon gas protection by aeration aperture to its inside; according to normal technique it is welded heat treatment operation at last; thermal treatment is pulled out plugging device in this from the pipeline tapping end by wireline after finishing.If the bore of pipeline or wall thickness are excessive, and cause the inside and outside wall of pipeline to have temperature head, at this moment can will be located at the resistance wire energising heating between the envelope piece in two, make the inside and outside wall temperature difference of weld seam of pipeline<20 ℃.
So the utlity model has following beneficial effect:
1, pipeline is in welding, because respectively being provided with in one, the two ends of weld seam seal piece, thereby the thermal losses when reducing pipeline inner air tube in heat treatment process and flowing, retarding heat is along pipeline axial and heat radiation radially, reduce thermograde, make the metal in the samming zone reach required minimum temperature at thickness direction.
2, this apparatus structure is simple, and is easy to make, and cost is low; And be to be repeatedly used, improved utilization ratio.
3, the pipeline that connects of butt welding carries out the thermometric experiment with thermopair, the data of reading from temperature-control heat couple and equivalent heat galvanic couple, adopt this interior plugging device and carry out Resistant heating in inside simultaneously, so that the same cross section of the weld seam of pipeline peripheral outer wall temperature is basic identical, temperature is evenly distributed; Radial direction, inner wall temperature are inhomogeneous state.In the constant temperature later stage, the inside and outside wall temperature difference of weld seam<20 ℃, the inner wall temperature basic controlling reaches the lower limit of the high tempering temperature of SA335P92 steel requirement at 760 ℃.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is the front view of the first interior envelope piece in the utility model.
Fig. 2 is side-view of the present utility model.
Fig. 3 uses the utility model that pipeline is carried out welding heat to process rear its welding temperature graphic representation.
Fig. 4 uses the utility model that pipeline is carried out the metallograph that welding heat is processed rear pipeline, and a is the metallograph of weld seam, and b is the metallograph before pipeline thermal is processed, and c is the metallograph after pipeline thermal is processed.
Among the figure: 1-the first interior envelope piece, 2-insulating cotton, 3-steel plate, 4-aeration aperture, 5-resistance wire, 6-wireline, 7-hanger, 8-screw rod, 9-the second interior envelope piece.
Embodiment
Embodiment one:
As shown in Figure 1 and Figure 2, a kind of for the heat treated interior plugging device of pipeline welding, comprise the columniform first interior envelope piece 1 and the second interior envelope piece 9, be connected by wireline 6 between the described first interior envelope piece 1 and the second interior envelope piece 9, an end of wireline 6 passes the first interior envelope piece 1; The described first interior envelope piece 1 is provided with aeration aperture 4, and the distance in described two between the envelope piece is 50cm.The described first interior envelope piece 1 and the second interior envelope piece 9 all are to be connected and fixed by screw rod 8 by two block plates 3, are filled with insulating cotton 2 between two block plates 3; The diameter of described insulating cotton 2 is than the large 14cm of diameter of steel plate 3.Be provided with resistance wire 5 between the described first interior envelope piece 1 and the second interior envelope piece 9, an end of resistance wire 5 passes the first interior envelope piece 1.Be equipped with hanger 7 on the inboard steel plate of the described first interior envelope piece 1 and the second interior envelope piece 9, described wireline 6 is affixed with hanger 7.
When pipeline is welded; just interior plugging device is placed in the both sides pipeline of weld bond first; then be filled with argon gas protection by aeration aperture to its inside; according to normal technique it is welded heat treatment operation at last; thermal treatment is pulled out plugging device in this from the pipeline tapping end by wireline after finishing.If the bore of pipeline or wall thickness are excessive, and cause the inside and outside wall of pipeline to have temperature head, at this moment can will be located at the resistance wire energising heating between the envelope piece in two, make the inside and outside wall temperature difference of weld seam of pipeline<20 ℃.
Embodiment two:
1, the pipeline that connects of butt welding carries out the thermometric experiment with thermopair, is about to thermopair and arranges along axis of a weld, respectively arranges a point for measuring temperature at 12:00,3:00,6:00 temperature control district outer wall.Record the result as shown in Figure 3: 100~150 ℃ of preheating temperature GTAW; Interlayer temperature: 200~300 ℃; Need be chilled to 80~100 ℃ after the welding, constant temperature 2h; Heat-up rate≤150 ℃/h; Cooling rate≤70 ℃/h; Natural slow cooling below 300 ℃; Thermal treatment temp: 760 ± 10 ℃; Constant temperature time: 4 h.Namely adopt the heat treated postweld heat treatment temperature of pipeline welding of the utility model processing in 760 ± 10 ℃ of scopes, guaranteed the quality of pipeline welded joint.
2, the standard of hardness value test is according to GB/T231-2009 " metal static hardness test " method the pipeline after welding to be carried out the hardness value test.The pipe welding seam hardness value is as shown in the table, and its weld hardness value meets the requirements in 230~250HB.
Sequence number The position Brinell hardness number Brinell hardness number mean value
1 Weld seam HB252、HB238、HB244 HB244
2 Mother metal HB203、HB210、HB207 HB207
3 The heat affected zone HB208、HB200、HB205 HB204
3, as shown in Figure 4, a is the metallograph of weld seam, and b is the metallograph before pipeline thermal is processed, and c is the metallograph after pipeline thermal is processed.
Before butt welded seam, pipeline thermal are processed with the pipeline thermal processing after microanalysis draw, seam organization is tempered martensite, the lath feature is obvious, the martensite lath complete display, it is qualified to organize; In addition, be martensitic stucture before pipeline thermal is processed with after the pipeline thermal processing, it is qualified to organize.
Above embodiment is not limited only to protection domain of the present utility model, all make amendment based on basic thought of the present utility model or change all belong to protection domain of the present utility model.

Claims (4)

1. one kind is used for the heat treated interior plugging device of pipeline welding, it is characterized in that: comprise the columniform first interior envelope piece and the second interior envelope piece, be connected by wireline between the described first interior envelope piece and the second interior envelope piece, an end of wireline passes the first interior envelope piece; The described first interior envelope piece is provided with aeration aperture, and the distance in described two between the envelope piece is 40-60cm.
2. according to claim 1 a kind of for the heat treated interior plugging device of pipeline welding, it is characterized in that: the described first interior envelope piece and the second interior envelope piece all are to be connected and fixed by screw rod by two block plates, are filled with insulating cotton between two block plates; The diameter of described insulating cotton is than the large 10-15cm of diameter of steel plate.
3. according to claim 1 a kind of for the heat treated interior plugging device of pipeline welding, it is characterized in that: be provided with resistance wire between the described first interior envelope piece and the second interior envelope piece, an end of resistance wire passes the first interior envelope piece.
4. according to claim 2 a kind of for the heat treated interior plugging device of pipeline welding, it is characterized in that: be equipped with hanger on the inboard steel plate of the described first interior envelope piece and the second interior envelope piece, described wireline and hanger are affixed.
CN 201320172243 2013-04-08 2013-04-08 Inner plugging device for welding heat treatment of pipeline Expired - Fee Related CN203200313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320172243 CN203200313U (en) 2013-04-08 2013-04-08 Inner plugging device for welding heat treatment of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320172243 CN203200313U (en) 2013-04-08 2013-04-08 Inner plugging device for welding heat treatment of pipeline

Publications (1)

Publication Number Publication Date
CN203200313U true CN203200313U (en) 2013-09-18

Family

ID=49144441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320172243 Expired - Fee Related CN203200313U (en) 2013-04-08 2013-04-08 Inner plugging device for welding heat treatment of pipeline

Country Status (1)

Country Link
CN (1) CN203200313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112251588A (en) * 2020-09-30 2021-01-22 中国石油化工股份有限公司 Tool clamp for heat treatment temperature uniformity of prefabricated pipe fitting and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112251588A (en) * 2020-09-30 2021-01-22 中国石油化工股份有限公司 Tool clamp for heat treatment temperature uniformity of prefabricated pipe fitting and use method

Similar Documents

Publication Publication Date Title
CN108866314B (en) Method for ensuring heat treatment uniformity of large-diameter thick-wall pipe weld joint
CN103114190B (en) Continuous bright solution thermal treatment device for stainless steel welded tube
US9663841B2 (en) Site conditions thick-wall P92 pipe local heat treatment method
CN111534680B (en) Heating temperature equalizing method for local induction heat treatment after welding of thick-wall pressure-bearing equipment
CN104120241B (en) Stub (tube) opposite joint local post weld heat treatment method
CN101870031B (en) Construction method for welding furnace tube and dissimilar steel
CN105202949A (en) Controllable-temperature self-cooling protection high-temperature U-tube evaporator
CN203200313U (en) Inner plugging device for welding heat treatment of pipeline
CN104070271B (en) 15Cr1Mo1V valve body and WB36 pipe arrangement different steel weld method
CN109182722B (en) Heat treatment method for large pressure container after external integral welding
CN107641702B (en) A kind of post weld heat treatment method of major diameter thick-walled pipe
CN105060680A (en) Continuous push type molybdenum electrode cooling water jacket
CN105695714A (en) Processing technology for preparing thermal insulated tubing from structural alloy steel
CN104651581A (en) Heat treatment workshop afterheat utilization system
CN203582950U (en) Chemical thermal treatment reaction furnace
CN205793426U (en) Quartz heating tube
CN109454316A (en) High temperature high voltage resistant high alloy submerged-arc welding steel pipe welding procedure
CN103406680A (en) Process for special-shaped steel butt welding of F22 valve body and P91 matching pipe
CN105986081A (en) Heat treatment process of steel TP92
CL2016000809A1 (en) Thermal device, its use, and procedure for heating a heat transfer medium
CN101347886B (en) Nonuniform heating enclosed method in large-sized high-pressure bottle heat sleeve stove
CN105132663A (en) Indirect temperature-measurement rotary type steel tube induction heating device
CN104014916A (en) F91 valve body and 10CrMo910 tubing dissimilar steel welding method
CN109280761B (en) Stress-relieving construction operation method for carbon steel pipe in field acidic environment
CN104561509A (en) Method for assisting heat treatment of steel pipe welding seams

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CEEC ANHUI ELECTRIC POWER CONSTRUCTION SECOND ENGI

Free format text: FORMER NAME: CEEC ANHUI ELECTRIC POWER CONSTRUCTION SECOND ENGINEERING COMPANY

CP01 Change in the name or title of a patent holder

Address after: 230601, No. 12600, prosperous road, Hefei economic and Technological Development Zone, Anhui

Patentee after: Chinese energy construction group Anhui electric power builds the second Engineering Co., Ltd

Address before: 230601, No. 12600, prosperous road, Hefei economic and Technological Development Zone, Anhui

Patentee before: CEEC CHINA ENERGY ENGINEERING GROUP CO., LTD., ANHUI NO.2 ELECTRIC POWER ENGINEERING & CONSTRUCTION CORPORATION

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20210408

CF01 Termination of patent right due to non-payment of annual fee