CN203191218U - Fuel gas pressure regulating device comprehensive performance test device - Google Patents

Fuel gas pressure regulating device comprehensive performance test device Download PDF

Info

Publication number
CN203191218U
CN203191218U CN 201220554523 CN201220554523U CN203191218U CN 203191218 U CN203191218 U CN 203191218U CN 201220554523 CN201220554523 CN 201220554523 CN 201220554523 U CN201220554523 U CN 201220554523U CN 203191218 U CN203191218 U CN 203191218U
Authority
CN
China
Prior art keywords
test
pressure regulating
pressure
comprehensive performance
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220554523
Other languages
Chinese (zh)
Other versions
CN203191218U8 (en
Inventor
张健
廖红春
陈联国
毛胜利
王俊红
韩晋平
段瑜涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Hongyuan Gas Equipments Co ltd
Original Assignee
Shaanxi Hongyuan Gas Equipments Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Hongyuan Gas Equipments Co ltd filed Critical Shaanxi Hongyuan Gas Equipments Co ltd
Priority to CN201220554523.7U priority Critical patent/CN203191218U8/en
Application granted granted Critical
Publication of CN203191218U publication Critical patent/CN203191218U/en
Publication of CN203191218U8 publication Critical patent/CN203191218U8/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a test system, in particular to a fuel gas pressure regulating device comprehensive performance test device. The fuel gas pressure regulating device comprehensive performance test device is characterized in that the gas pressure regulating performance unit testing device includes a gas source, a pressure regulating test bench, a pressure regulating box test bench and a durability test bench; after being filtered by a filter, the air source is divided into two paths through a first tee joint, wherein a first path of the air source is communicated with a low temperature resistance tester successively through a bypass path, a second tee joint, a first flowmeter, a four tee joint, a low temperature resistance test gas supply valve, and a second path of the air path is communicated with the four tee joint through a pressure valuator, a third tee joint and a third flowmeter; another path of a pipeline of the four tee joint is provided with a temperature transmitter; and the temperature transmitter is divided into two paths of branches by a fifth tee joint, wherein one path of the two branches is communicated with the pressure regulating box test bench, and the other path of the two branches is communicated with the pressure regulating test bench. The fuel gas pressure regulating device comprehensive performance test device can detect a wide variety of devices orderly with high test efficiency and reliable measurement results, and is not restricted by human factors, and can realize real-time monitoring and data output.

Description

Combustion gas regulator comprehensive performance test device
Technical field
The utility model relates to a kind of test macro, particularly a kind of combustion gas regulator comprehensive performance test device.
Background technology
Gas transmission and distribution system is similar in appearance to the electric power distributing system, all adopt high pressure transmission ﹠ distribution low pressure to use, the top pressure of general long-distance transport pipes can reach 10MPa, and when arriving the terminal that the user uses at last, its pressure probably has only about 2~3kPa, gas transmission and distribution system could satisfy final request for utilization after will reducing pressure step by step through 3~5 grades.Decompression then realizes by pressure regulator.Pressure regulator, quick action emergency valve, superpressure are diffused valve and the equipment such as flange, tensimeter, filtrator, ball valve, butterfly valve of importing and exporting are formed pressure regulating box (cabinet).Combustion gas pressure regulating box (cabinet) is the important component part in the gas transmission and distribution system, little because of its compact conformation, floor area, reduce investment outlay, advantage such as easy to install applied widely.
For pressure regulating box (device), there are disadvantage in traditional, conventional test, detection mode: 1.) the checkout equipment dispersion is various, takes a lot of work inefficiency during test fee; 2.) be subjected to the restriction of human factor, measurement result is rough, poor reliability.3.) can not realize real-time monitoring, the output of data is not clear, convenient etc. yet.
Summary of the invention
The purpose of this utility model provides and a kind ofly can detect various equipment in order, and the testing efficiency height is not subjected to the restriction of human factor, and measurement result is reliable, can realize the combustion gas regulator comprehensive performance test device of the output of monitoring in real time and data.
For overcoming the deficiencies in the prior art, the technical solution of the utility model is: combustion gas regulator comprehensive performance test device, it is characterized in that: comprising: source of the gas, pressure regulator test board, pressure regulating box test board and durable test platform, source of the gas filters the back through filter and is divided into two-way by first threeway, and the first via arrives low temperature resistant tester through by-pass valve, second threeway, first flow meter, the 4th threeway, low temperature resistant test steam supply valve successively; The second the tunnel through pressure valuator, the 3rd threeway, four threeways of the 3rd flowmeter to the, the 4th threeway has temperature transmitter on another siphunculus road, be divided into the two-way branch road by the 5th threeway behind the temperature transmitter, two road branch roads, one tunnel logical pressure regulating box test board, another road leads to the pressure regulator test board.
Described pressure regulator test board and pressure regulating box test board communicate with the pressure regulation export pipeline respectively, shutdown valve, temperature transmitter, pressure unit, pressure regulating box test outlet valve are arranged to outlet on the pressure regulation outlet.
Described pressure regulator test board entrance has the pressure regulator gas admittance valve.
Between described first flow meter pipeline and the 3rd flowmeter and be connected to second flowmeter, there is shutdown valve each flowmeter both sides, each flowmeter range difference.
Temperature transmitter, pressure unit, pressure regulator test outlet valve are arranged on the described pressure regulator test board pipeline.
Form the interface of different tube diameters between described pressure regulating box test board pipeline and the pressure regulation export pipeline.
Another pass-out mouth of described second threeway connects the durable test platform, and the durable test platform connects solenoid valve.Connect durable test platform entrance the durable test gas admittance valve is arranged.
Described pressure regulating box test board connects the pressure regulating box gas admittance valve.
Described solenoid valve, temperature transmitter, pressure unit and each flowmeter are electrically connected with computer monitoring center, be serially connected with between computer monitoring center and the power supply on-the-spot start control by.
The utility model has the advantages that: source of the gas, pressure regulator test board, pressure regulating box test board and durable test platform, source of the gas filters the back through filter and is divided into two-way by first threeway, and the first via arrives low temperature resistant tester through by-pass valve, second threeway, first flow meter, the 4th threeway, low temperature resistant test steam supply valve successively; The second the tunnel through pressure valuator, the 3rd threeway, four threeways of the 3rd flowmeter to the, the 4th threeway has temperature transmitter on another siphunculus road, be divided into the two-way branch road by the 5th threeway behind the temperature transmitter, two road branch roads, one tunnel logical pressure regulating box test board, another road leads to the pressure regulator test board.So just can detect various equipment in order, the testing efficiency height is not subjected to the restriction of human factor, and measurement result is reliable, can realize monitoring in real time, the output of data.
Description of drawings
Fig. 1 is example structure synoptic diagram front view of the present utility model;
Fig. 2 is the vertical view of Fig. 1.
Number in the figure is respectively: 1-filtrator, 2-pressure valuator, 3-by-pass valve, 4-flowmeter, 5-pressure regulating box gas admittance valve, 6-computer monitoring center, 7-durable test gas admittance valve, 8-solenoid valve, 9-temperature transmitter, 10-pressure unit, 11-pressure regulator gas admittance valve, 12-pressure regulator test outlet valve, 13-pressure regulating box test outlet valve, 14-shutdown valve, 15-low temperature resistant tester, 16-on-the-spot control knob, the 17-low temperature resistant test steam supply valve of starting.
Embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in Figure 1 and Figure 2, combustion gas regulator comprehensive performance test device, it is characterized in that: comprising: source of the gas, pressure regulator test board, pressure regulating box test board and durable test platform, source of the gas filters the back through filter 1 and is divided into two-way by first threeway, and the first via arrives low temperature resistant tester 15 through by-pass valve 3, second threeway, first flow meter 4, the 4th threeway, low temperature resistant test steam supply valve 17 successively; The second the tunnel through pressure valuator 2, the 3rd threeway, four threeways of the 3rd flowmeter to the, the 4th threeway has temperature transmitter 9 on another siphunculus road, temperature transmitter 9 backs are divided into the two-way branch road by the 5th threeway, two road branch roads, one tunnel logical pressure regulating box test board, and another road leads to the pressure regulator test board.
Pressure regulator test board and pressure regulating box test board communicate with the pressure regulation export pipeline respectively, shutdown valve 14, temperature transmitter 9, pressure unit 10, pressure regulating box test outlet valve 13 are arranged to outlet on the pressure regulation outlet.
Pressure regulator test board entrance has pressure regulator gas admittance valve 11.
Between first flow meter 4 pipelines and the 3rd flowmeter and be connected to second flowmeter, there is shutdown valve each flowmeter both sides, each flowmeter range difference.
Temperature transmitter 9, pressure unit 10, pressure regulator test outlet valve 12 are arranged on the pressure regulator test board pipeline.
Form the interface of different tube diameters between pressure regulating box test board pipeline and the pressure regulation export pipeline.
Another pass-out mouth of second threeway connects the durable test platform, and the durable test platform connects solenoid valve 8.Connect durable test platform entrance durable test gas admittance valve 7 is arranged.
The pressure regulating box test board connects pressure regulating box gas admittance valve 5.
Solenoid valve 8, temperature transmitter 9, pressure unit 10 and each flowmeter are electrically connected with computer monitoring center 6, are serially connected with the on-the-spot control knob 16 that starts between computer monitoring center 6 and the power supply.
The pressure feed system at first connects source of the gas, and by-pass valve 3 is in closed condition.From import inflation pressurization, by pressure valuator 2 pressure is set to required test pressure, open computer monitoring center, system enters test mode.
Pressure regulator durable test: the pressure regulator of setup test is connected between durable test gas admittance valve 7 and the durable test platform, open durable test gas admittance valve 7, start the durable test solenoid valve, pressure regulator is just under the control of chronotron, solenoid valve does not stop opening and closing, thereby realizes the long duration test of pressure regulator epithelium.
Pressure regulator static characteristic test: the pressure regulator of setup test is connected between pressure regulator gas admittance valve 11 and the pressure regulator test board, turn-on flow rate meter 4 front and back valves, open pressure regulator gas admittance valve 11, set test voltage regulator operation pressure, open shutdown valve 14 and pressure regulating box test outlet valve 13, manually boot field control button 16.Slowly at the uniform velocity open pressure regulator test outlet valve 12, slowly at the uniform velocity close then, stop field control button 16 at last.Computing machine is collected all data by pressure unit 10, temperature transmitter 9 and flowmeter 4, and is depicted as flow curve figure and test report, printout.
Pressure regulating box static characteristic test: the pressure regulating box of setup test is connected on the pressure regulating box test board at corresponding center, turn-on flow rate meter 4 front and back valves, open pressure regulating box gas admittance valve 5, set test pressure regulating box working pressure, close shutdown valve 14 and pressure regulating box test outlet valve 13, manually boot field control button 16.Slowly at the uniform velocity open pressure regulating box test outlet valve 13, slowly at the uniform velocity close then, stop field control button 16 at last.Computing machine is collected all data by pressure unit 10, temperature transmitter 9 and flowmeter 4, and is depicted as flow curve figure and test report, printout.The low temperature resistant test of pressure regulator: with the regulator of setup test, place in the cryogenic box, the equipment air inlet is connected to low temperature resistant test steam supply valve 17 and opens, adjust the pressure regulator top hole pressure and record the closing presure value, close the low temperature chamber door, set temperature drop to-20 ℃, and keep 1h, record pressure regulator closing presure value, the relatively change value of pressure before and after the temperature difference.
The parts that present embodiment is not described in detail and structure belong to well-known components and common structure or the conventional means of the industry, here not narration one by one.

Claims (9)

1. combustion gas regulator comprehensive performance test device, it is characterized in that: comprising: source of the gas, pressure regulator test board, pressure regulating box test board and durable test platform, source of the gas filters the back through filter and is divided into two-way by first threeway, and the first via arrives low temperature resistant tester through by-pass valve, second threeway, first flow meter, the 4th threeway, low temperature resistant test steam supply valve successively; The second the tunnel through pressure valuator, the 3rd threeway, four threeways of the 3rd flowmeter to the, the 4th threeway has temperature transmitter on another siphunculus road, be divided into the two-way branch road by the 5th threeway behind the temperature transmitter, two road branch roads, one tunnel logical pressure regulating box test board, another road leads to the pressure regulator test board.
2. combustion gas regulator comprehensive performance test device according to claim 1, it is characterized in that: described pressure regulator test board and pressure regulating box test board communicate with the pressure regulation export pipeline respectively, shutdown valve, temperature transmitter, pressure unit, pressure regulating box test outlet valve are arranged to outlet on the pressure regulation outlet.
3. combustion gas regulator comprehensive performance test device according to claim 1, it is characterized in that: described pressure regulator test board entrance has the pressure regulator gas admittance valve.
4. combustion gas regulator comprehensive performance test device according to claim 1 is characterized in that: between described first flow meter pipeline and the 3rd flowmeter and be connected to second flowmeter, there is shutdown valve each flowmeter both sides, each flowmeter range difference.
5. combustion gas regulator comprehensive performance test device according to claim 1 is characterized in that: temperature transmitter, pressure unit, pressure regulator test outlet valve are arranged on the described pressure regulator test board pipeline.
6. combustion gas regulator comprehensive performance test device according to claim 1 is characterized in that: the interface that forms different tube diameters between described pressure regulating box test board pipeline and the pressure regulation export pipeline.
7. combustion gas regulator comprehensive performance test device according to claim 1 is characterized in that: another pass-out mouth connection durable test platform of described second threeway, durable test platform connection solenoid valve; Connect durable test platform entrance the durable test gas admittance valve is arranged.
8. combustion gas regulator comprehensive performance test device according to claim 1 is characterized in that: described pressure regulating box test board connection pressure regulating box gas admittance valve.
9. combustion gas regulator comprehensive performance test device according to claim 7, it is characterized in that: described solenoid valve is electrically connected with computer monitoring center, is serially connected with the on-the-spot control knob that starts between computer monitoring center and the power supply.
CN201220554523.7U 2012-10-26 2012-10-26 Gas Pressure Regulating Equipment comprehensive performance test device Expired - Lifetime CN203191218U8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220554523.7U CN203191218U8 (en) 2012-10-26 2012-10-26 Gas Pressure Regulating Equipment comprehensive performance test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220554523.7U CN203191218U8 (en) 2012-10-26 2012-10-26 Gas Pressure Regulating Equipment comprehensive performance test device

Publications (2)

Publication Number Publication Date
CN203191218U true CN203191218U (en) 2013-09-11
CN203191218U8 CN203191218U8 (en) 2017-12-01

Family

ID=49108071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220554523.7U Expired - Lifetime CN203191218U8 (en) 2012-10-26 2012-10-26 Gas Pressure Regulating Equipment comprehensive performance test device

Country Status (1)

Country Link
CN (1) CN203191218U8 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113899399A (en) * 2021-09-18 2022-01-07 深圳市宏智智能装备有限公司 High-voltage regulator testing method for intelligent micro-pipe network ecological chain

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113899399A (en) * 2021-09-18 2022-01-07 深圳市宏智智能装备有限公司 High-voltage regulator testing method for intelligent micro-pipe network ecological chain

Also Published As

Publication number Publication date
CN203191218U8 (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN203203767U (en) Leakage test system
CN201314914Y (en) Device for measuring exhaust pollutant from light automobile and engine thereof
CN108061624B (en) The air mass flow and seal tightness test platform and test method of aerial motor spare part
CN208653782U (en) Liquid flow test device for liquid rocket engine thrust chamber
CN203549406U (en) Fuel gas pressure regulating metering skid-mounted device for petroleum and gas
CN109187001A (en) A kind of motorized adjustment class valve big flow performance test apparatus and its test method
CN103776640A (en) Combination property test system of fuel gas pressure regulating device
CN201034829Y (en) Flow quantity proportion valve characteristic curves test platform
CN203694926U (en) Membrane component separation performance testing platform
CN104931266A (en) Aircraft engine fuel oil simulation control system and adjusting method
CN111595574A (en) Efficient pressure regulating box test board and test method thereof
CN102213651A (en) Dust offline sampling system in closed loop type high-pressure natural gas pipeline and sampling method thereof
CN105115720A (en) Test stand used for testing performance of double turbochargers and provided with high-pressure gas shunt device
CN205879474U (en) Vertical compression leak detector
CN203191218U (en) Fuel gas pressure regulating device comprehensive performance test device
CN110726547A (en) Portable comprehensive checking device for pressure protection device
CN101620801A (en) Device for simulating oil house processes
CN201051035Y (en) Pressure adjuster static feature detection device
CN209280319U (en) One kind being used for the quick water-blowing device of engine pedestal pressure measurement pipeline
CN202252858U (en) Gas pressure adjusting metering cabinet
CN114838014A (en) Simulation detection device for fuel cell gas supply system
CN207215425U (en) Automobile canister flow resistance test device
CN107388037A (en) Novel voltage-regulating batch meter
CN204371306U (en) A kind of oil well measurement structure
CN208383393U (en) Electronics relief valve dynamic leakage device for testing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CU01 Correction of utility model
CU01 Correction of utility model

Correction item: Patentee

Correct: SHAANXI HONGYUAN GAS EQUIPMENT CO.,LTD.

False: SHAANXI HONGYUAN GAS EQUIPMENTS Co.,Ltd.

Number: 37

Page: The title page

Volume: 29

Correction item: Patentee

Correct: SHAANXI HONGYUAN GAS EQUIPMENT CO.,LTD.

False: SHAANXI HONGYUAN GAS EQUIPMENTS Co.,Ltd.

Number: 37

Volume: 29

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130911