CN203189232U - Tunnel construction air compressor machine shunt - Google Patents
Tunnel construction air compressor machine shunt Download PDFInfo
- Publication number
- CN203189232U CN203189232U CN 201220601992 CN201220601992U CN203189232U CN 203189232 U CN203189232 U CN 203189232U CN 201220601992 CN201220601992 CN 201220601992 CN 201220601992 U CN201220601992 U CN 201220601992U CN 203189232 U CN203189232 U CN 203189232U
- Authority
- CN
- China
- Prior art keywords
- air compressor
- air
- tunnel construction
- compressor machine
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000007789 sealing Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Compressor (AREA)
Abstract
The utility model discloses a tunnel construction air compressor machine shunt, including air compressor machine tuber pipe (1), flange (2), play tuber pipe (3), valve (4) and store up dryer (5), air compressor machine tuber pipe (1) is connected with storing up dryer (5) through flange (2), goes out tuber pipe (3) and is connected with storing up dryer (5), go out valve (4) that are provided with the control air current on tuber pipe (3): the utility model discloses a tunnel construction air compressor machine shunt uniformly adopts an tuber pipe to introduce near the construction face, realizes simple to operate when reducing power loss.
Description
Technical field
The utility model relates to the engineering construction field, specifically, relates to a kind of tunnel construction air compressor shunt.
Background technique
Air compressor of the prior art generally arranges a plurality of interfaces at fuselage, can drive a plurality of pneumatic equipments simultaneously and carry out work.As shown in Figure 1, each pneumatic equipment links to each other with air compressor by airduct respectively, because the common air compressor of tunnel construction all is arranged on outside the hole, air compressor is far away apart from equipment, and face has a plurality of pneumatic equipments usually, as adopts not only waste material of a plurality of airducts, trouble is installed, and windage loss is bigger.
The model utility content
The technical problems to be solved in the utility model provides a kind of tunnel construction air compressor shunt, and near unified the employing airduct introducing working face realized easy for installation when reducing power loss.
In order to solve the problems of the technologies described above, the utility model provides a kind of tunnel construction air compressor shunt, comprise air compressor airduct 1, adpting flange 2, air outlet tube 3, valve 4 and air receiver 5, described air compressor airduct 1 is connected with air receiver 5 by adpting flange 2, air outlet tube 3 is connected with air receiver 5, and described air outlet tube 3 is provided with the valve 4 of control air-flow.
Further, described air receiver 5 is welded by the seamless steel pipe of diameter 15~20cm, end sealing, and an end is welded with flange plate.
Further, punch welding air outlet tube 3 and valve 4 in described air receiver 5 one sides.
Advantage of the present utility model is: 1, make simple, economic and practical; 2, near unified the employing airduct introducing working face reduced power loss; 3, unpractical exhaust outlet can seal, convenient control.
Description of drawings
Fig. 1 is air compressor diversion structure schematic representation of the prior art.
Fig. 2 is air compressor diversion structure schematic representation of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments, so that those skilled in the art can better understand the utility model and being implemented, but illustrated embodiment is not as to restriction of the present utility model.
Figure 2 shows that, the structural representation of a kind of tunnel construction air compressor shunt of the present utility model, comprise air compressor airduct 1, adpting flange 2, air outlet tube 3, valve 4 and air receiver 5, described air compressor airduct 1 is connected with air receiver 5 by adpting flange 2, air outlet tube 3 and the design of air receiver 5 one, described air outlet tube 3 is provided with the valve 4 of control air-flow.
In another embodiment of the present utility model, described air receiver 5 is welded by diameter 15~20cm seamless steel pipe, end sealing, and an end is welded with flange plate.Punch welding air outlet tube 3 and valve 4 in described air receiver 5 one sides.Design the quantity of valve 4 according to the quantity of air outlet tube 3, and both quantity and size can be adjusted according to actual needs.
In the working procedure, the air compressor exhaust outlet is passed to by an air main near the tunnel tunnel face, is connected with this shunt by flange, and at the exhaust outlet connection device, the exhaust outlet of connection device does not use the valve sealing.
Advantage of the present utility model is: 1, make simple, economic and practical; 2, near unified the employing airduct introducing working face reduced power loss; 3, unpractical exhaust outlet can seal, convenient control.
The above embodiment is the preferred embodiment that proves absolutely that the utility model is lifted, and protection domain of the present utility model is not limited thereto.Being equal to that those skilled in the art do on the utility model basis substitutes or conversion, all within protection domain of the present utility model.Protection domain of the present utility model is as the criterion with claims.
Claims (3)
1. tunnel construction air compressor shunt, comprise air compressor airduct (1), adpting flange (2), air outlet tube (3), valve (4) and air receiver (5), it is characterized in that, described air compressor airduct (1) is connected with air receiver (5) by adpting flange (2), air outlet tube (3) is connected with air receiver (5), and described air outlet tube (3) is provided with the valve (4) of control air-flow.
2. tunnel construction air compressor shunt according to claim 1 is characterized in that, described air receiver (5) is welded by the seamless steel pipe of diameter 15~20cm, end sealing, and an end is welded with flange plate.
3. tunnel construction air compressor shunt according to claim 1 is characterized in that, punches welding air outlet tube (3) and valve (4) in described air receiver (5) one sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220601992 CN203189232U (en) | 2012-11-14 | 2012-11-14 | Tunnel construction air compressor machine shunt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220601992 CN203189232U (en) | 2012-11-14 | 2012-11-14 | Tunnel construction air compressor machine shunt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203189232U true CN203189232U (en) | 2013-09-11 |
Family
ID=49106095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220601992 Expired - Fee Related CN203189232U (en) | 2012-11-14 | 2012-11-14 | Tunnel construction air compressor machine shunt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203189232U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441338A (en) * | 2018-11-02 | 2019-03-08 | 姚晓宁 | A kind of railway tunnel air rock drill current divider and preparation method thereof |
-
2012
- 2012-11-14 CN CN 201220601992 patent/CN203189232U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441338A (en) * | 2018-11-02 | 2019-03-08 | 姚晓宁 | A kind of railway tunnel air rock drill current divider and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203189232U (en) | Tunnel construction air compressor machine shunt | |
CN102242615B (en) | Borehole gas blowout preventer | |
CN202944737U (en) | Loosening machine for blockage cleaning engineering of storage bin | |
CN203817671U (en) | Assembly tooling of air pocket of dust collector | |
CN203513800U (en) | Explosion-proof device of hydrogen-oxygen generator | |
CN203484647U (en) | Air bag clamp for taking out sand cores | |
CN202360348U (en) | Distributing and converting device of compressed air | |
CN206825359U (en) | A kind of electric tool clamping device | |
CN204150267U (en) | A kind of structure of vacuum exhaust pipe | |
CN204692771U (en) | A kind of integrated steel pipe | |
CN204533559U (en) | Overhead valve and bottom valve structure at the bottom of a kind of graphite reactor still | |
CN204461049U (en) | For the waste heat recovery device of tunnel cave | |
CN204868731U (en) | Port machine hydraulic system inserted valve case extractor | |
CN203721815U (en) | Piece making machine and pole piece rubberizing mechanism thereof | |
CN203304805U (en) | Cluster type oxygen supply device | |
CN201962917U (en) | Ventilating air exhausting passage | |
CN201862805U (en) | Punching device under pressure | |
CN203629407U (en) | Throttling device inside heat exchanger | |
CN203764204U (en) | Metering and feeding device | |
CN203159730U (en) | Throttle valve of crust breaking cylinder | |
CN203718271U (en) | Multi-purpose detachable PE (polyethylene) pipe plug for gas pipeline construction | |
CN203714780U (en) | Flour conveying device for continuously feeding two production lines | |
CN202666800U (en) | Dredging and ventilating device for reaction kettle | |
CN202844765U (en) | Bag-type dust collecting equipment for spray drying tower | |
CN202832610U (en) | Air barrel guiding device for coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130911 Termination date: 20131114 |