CN203171496U - Scraper conveyer chute installation platform and system - Google Patents
Scraper conveyer chute installation platform and system Download PDFInfo
- Publication number
- CN203171496U CN203171496U CN 201320192926 CN201320192926U CN203171496U CN 203171496 U CN203171496 U CN 203171496U CN 201320192926 CN201320192926 CN 201320192926 CN 201320192926 U CN201320192926 U CN 201320192926U CN 203171496 U CN203171496 U CN 203171496U
- Authority
- CN
- China
- Prior art keywords
- top panel
- chute
- assembly
- board conveyor
- scratch board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Chutes (AREA)
Abstract
The utility model provides a scraper conveyer chute installation platform and system. The scraper conveyer chute installation platform comprises a platform support and blocking plates, wherein the platform support comprises an upper panel and a lower panel, the upper panel is connected with the lower panel through a supporting rib, the upper panel is used for bearing a chute, a first set distance is arranged between a first end of the upper panel and the plane of the lower panel, a second set distance is arranged between a second end of the upper panel and the plane of the lower panel, the first set distance is larger than the second set distance, and the blocking plates are arranged on two sides of the upper panel, extend along the length direction of the upper panel and are used for guiding the chute. By the aid of the scraper conveyer chute installation platform and system, the construction safety and the construction efficiency can be improved, and the labor intensity and the construction cost can be reduced.
Description
Technical field
The utility model relates to the transporting equipment mounting technique, relates in particular to a kind of scratch board conveyor chute mounting platform and scratch board conveyor chute installation system.
Background technology
Scratch board conveyor is indispensable capital equipment in the modernized coal winning technology.
At present, when mine scratch board conveyor chute is installed, generally adopt flat car that chute is transported to behind the position to be installed by manually lifting by crane, and then with the flat car traction to not influencing the installation site, again by manually chute being docked assembling.
Adopt artificial lifting method that chute is unloaded, assembled, a large amount of Heave Heres and lifting tool need be set, and pay the great amount of manpower resource, have the shortcoming that security threat is big, construction labour intensity is big, construction cost is high and efficiency of construction is low.
The utility model content
The utility model provides a kind of scratch board conveyor chute mounting platform and scratch board conveyor chute installation system, to improve working security and efficiency of construction, reduces labour intensity and construction cost.
The utility model provides a kind of scratch board conveyor chute mounting platform, comprising:
Platform support, comprise top panel and lower panel, connect by brace rod between described top panel and the lower panel, described top panel is used for the carrying chute, has one first setpoint distance between first end of described top panel and the plane, lower panel place, have one second setpoint distance between second end of described top panel and the plane, lower panel place, described first setpoint distance is greater than second setpoint distance;
Baffle plate is arranged at the both sides of described top panel and extends along the length direction of described top panel, is used for chute is play the guiding role.
Described scratch board conveyor chute mounting platform, preferred, described scratch board conveyor chute mounting platform is removably connected by a plurality of platform assemblies and forms; Described platform assembly comprises platform support assembly and baffle plate assembly, and described platform support assembly is used for forming described platform support, and described baffle plate assembly is used for forming described baffle plate; Described platform support assembly comprises top panel assembly and lower panel assembly, connects by the brace rod assembly between described top panel assembly and the lower panel assembly, and described top panel assembly is used for forming described top panel, and described lower panel assembly is used for forming described lower panel.
Described scratch board conveyor chute mounting platform, preferably, the end of described top panel assembly is longer than or is shorter than in the end of described lower panel assembly and brace rod assembly, thereby form tenon or groove, and a plurality of described platform support assemblies are formed described platform support by the grafting of tenon and groove.
Described scratch board conveyor chute mounting platform, preferred, the baffle plate that is positioned at the second end place of described top panel is provided with handle hole.
Described scratch board conveyor chute mounting platform, preferably, first end of described baffle plate and described top panel forms first opening, and second end of described baffle plate and described top panel forms second opening, and the width of described first opening is greater than the width of described second opening.
Described scratch board conveyor chute mounting platform, preferred, described first setpoint distance is 200 millimeters-300 millimeters.
The utility model provides a kind of scratch board conveyor chute installation system, comprises first draw-gear and scratch board conveyor chute mounting platform provided by the utility model;
Described first draw-gear is used for chute by first end traction of described top panel, second end to described top panel.
Described scratch board conveyor chute installation system, preferred, also comprise second draw-gear, described second draw-gear is used for the described scratch board conveyor chute mounting platform of traction and described scratch board conveyor chute mounting platform is moved.
Based on above-mentioned, the scratch board conveyor chute mounting platform that the utility model provides, owing to have one first setpoint distance between first end of top panel and the plane, lower panel place, and first setpoint distance can arrange according to the height of the flat car that transports chute to be installed, thereby make the height of first end of top panel and flat car suitable, when chute is installed, scratch board conveyor chute mounting platform is placed on the ground, the second end place of top panel is placed with the head of mounted chute or scratch board conveyor, the flat car that chute to be installed is housed is transported to first end of top panel, flat car is fixed, draw chute to be installed by draw-gear, make chute to be installed slide to the installation site of second end of top panel at first end of the guide effect lower edge of baffle plate top panel, can easily chute to be installed and the head of mounted chute or scratch board conveyor be assembled afterwards, because first setpoint distance is greater than second setpoint distance that has between second end of top panel and the plane, lower panel place, therefore it is happy chute to be installed to be slided, can make simultaneously the mounted chute that is positioned at top panel second end form an elevation angle, thereby make things convenient for the assembly working of chute, avoided the artificial lifting method of available technology adopting that chute is unloaded thus, the link of assembling, improve working security and efficiency of construction, reduced labour intensity and construction cost.
Description of drawings
The structural representation of a kind of scratch board conveyor chute mounting platform that Fig. 1 provides for the utility model embodiment;
The lateral plan of a kind of scratch board conveyor chute mounting platform that Fig. 2 provides for the utility model embodiment;
Structural representation after a kind of scratch board conveyor chute mounting platform that Fig. 3 provides for the utility model embodiment decomposes;
A kind of scratch board conveyor chute installation system that Fig. 4 provides for the utility model embodiment is at the schematic diagram of installment work preparatory stage;
The schematic diagram of a kind of scratch board conveyor chute installation system in the installment work process that Fig. 5 provides for the utility model embodiment;
The schematic diagram of a kind of scratch board conveyor chute installation system after installment work is finished that Fig. 6 provides for the utility model embodiment.
Reference numeral:
101: scratch board conveyor chute mounting platform; 102: platform support;
103: top panel; 104: lower panel;
105: brace rod; 106: baffle plate;
107: platform assembly; 108: the platform support assembly;
109: baffle plate assembly; 110: the top panel assembly;
111: the lower panel assembly; 112: the brace rod assembly;
113: tenon; 114: groove;
115: handle hole; 116: the first openings;
117: the second openings; 118: first end of top panel
119: second end 201 of top panel: chute;
301: flat car; 401: the first draw-gears;
501: the second draw-gears.
The specific embodiment
Please refer to Fig. 1-6, the utility model embodiment provides a kind of scratch board conveyor chute mounting platform 101, comprise: platform support 102, comprise top panel 103 and lower panel 104, connect by brace rod 105 between described top panel 103 and the lower panel 104, described top panel 103 is used for carrying chute 201, has one first setpoint distance between first end 118 of described top panel 103 and the plane, lower panel 104 place, have one second setpoint distance between second end 119 of described top panel 103 and the plane, lower panel 104 place, described first setpoint distance is greater than second setpoint distance; Baffle plate 106 is arranged at the both sides of described top panel 103 and extends along the length direction of described top panel 103, is used for chute 201 is play the guiding role.
In the present embodiment, owing to have one first setpoint distance between first end 118 of top panel 103 and the plane, lower panel 104 place, and first setpoint distance can arrange according to the height of the flat car 301 that transports chute 201 to be installed, thereby make first end 118 of top panel 103 suitable with the height of flat car 301, when chute 201 is installed, scratch board conveyor chute mounting platform 101 is placed on the ground, second end, 119 places of top panel 103 are placed with the head of mounted chute 201 or scratch board conveyor, the flat car 301 that chute 201 to be installed is housed is transported to first end 118 of top panel 103, flat car 301 is fixed, draw chute 201 to be installed by draw-gear, make chute 201 to be installed slide to the installation site of second end 119 of top panel 103 at first end 118 of the guide effect lower edge of baffle plate 106 top panel 103, can easily chute 201 to be installed and the head of mounted chute 201 or scratch board conveyor be assembled afterwards, because first setpoint distance is greater than second setpoint distance that has between second end 119 of top panel 103 and the plane, lower panel 104 place, therefore can make chute 201 to be installed slide happy, can make simultaneously the mounted chute 201 that is positioned over top panel 103 second ends 119 form an elevation angle, thereby make things convenient for the assembly working of chute 201, avoided the artificial lifting method of available technology adopting that chute 201 is unloaded thus, the link of assembling, improve working security and efficiency of construction, reduced labour intensity and construction cost.
In the present embodiment, preferred, scratch board conveyor chute mounting platform 101 is removably connected by a plurality of platform assemblies 107 and forms; Described platform assembly 107 comprises platform support assembly 108 and baffle plate assembly 109, and described platform support assembly 108 is used for forming described platform support 102, and described baffle plate assembly 109 is used for forming described baffle plate 106; Described platform support assembly 108 comprises top panel assembly 110 and lower panel assembly 111, connect by brace rod assembly 112 between described top panel assembly 110 and the lower panel assembly 111, described top panel assembly 110 is used for forming described top panel 103, and described lower panel assembly 111 is used for forming described lower panel 104.Thus, after the installment work of finishing chute 201, scratch board conveyor chute mounting platform 101 dismounting can be a plurality of parts, thereby make things convenient for the transportation of scratch board conveyor chute mounting platform 101 and deposit.A plurality of platform assemblies 107 can removably connect by connectors such as bolts, thereby can carry out dismounting easily.
In the present embodiment, preferably, the end of described top panel assembly 110 is longer than or is shorter than in the end of lower panel assembly 111 and brace rod assembly 112, thereby form tenon 113 or groove 114, a plurality of described platform support assemblies 108 are formed described platform support 102 by the grafting of tenon 113 and groove 114.Grafting by tenon 113 and groove 114 can make being connected of platform assembly 107 more firm, also can better guarantee simultaneously the flatness of the top panel 103 be made up of a plurality of top panel assemblies 110.
In the present embodiment, preferred, the baffle plate 106 that is positioned at second end, 119 places of described top panel 103 is provided with handle hole 115.After chute 201 to be installed is towed to the installation site, need chute 201 to be installed be connected with mounted chute 201 with connecting pin, therefore, can make the handle hole 115 of baffle plate 106 corresponding to the seam crossing of chute 201 to be installed with mounted chute 201, thereby make things convenient for the installment work of connecting pin.After the installment work of finishing a chute 201, can scratch board conveyor chute mounting platform 101 forwards be drawn by draw-gear, thereby make handle hole 115 can be all the time corresponding to the seam crossing of chute 201 to be installed with mounted chute 201.
In the present embodiment, preferred, baffle plate 106 forms first opening 116 with first end 118 of top panel 103, and baffle plate 106 forms second opening 117 with second end 119 of top panel 103, and the width of described first opening 116 is greater than the width of described second opening 117.Make scratch board conveyor chute mounting platform 101 form uncovered structure thus, chute 201 to be installed can slip into from first opening 116 smoothly, avoided the obstruction of 116 pairs of chutes 201 to be installed of first opening, while second opening 117 can carry out spacing accurately to chute 201 to be installed, thus convenient follow-up installment work.
In the present embodiment, preferred, first setpoint distance is 200 millimeters-300 millimeters.Thus after scratch board conveyor chute mounting platform 101 is placed on the ground, can make first end 118 of top panel 103 suitable with the height of the flat car 301 commonly used that transports chute 201 to be installed, thereby can easily chute 201 to be installed be drawn first end 118 to top panel 103, certain first setpoint distance can arrange according to the actual height of the flat car 301 that transports chute 201 to be installed, and the utility model is not done concrete restriction to this.
The utility model embodiment provides a kind of scratch board conveyor chute installation system, comprises first draw-gear 401 and the described scratch board conveyor chute of the utility model any embodiment mounting platform 101; Described first draw-gear 401 is used for chute 201 by first end, 118 tractions of described top panel 103, second end 119 to described top panel 103.
In the present embodiment, owing to have one first setpoint distance between first end 118 of top panel 103 and the plane, lower panel 104 place, and first setpoint distance can arrange according to the height of the flat car 301 that transports chute 201 to be installed, thereby make first end 118 of top panel 103 suitable with the height of flat car 301, when chute 201 is installed, scratch board conveyor chute mounting platform 101 is placed on the ground, second end, 119 places of top panel 103 are placed with the head of mounted chute 201 or scratch board conveyor, the flat car 301 that chute 201 to be installed is housed is transported to first end 118 of top panel 103, flat car 301 is fixed, by first draw-gear, 401 tractions chute 201 to be installed, make chute 201 to be installed slide to the installation site of second end 119 of top panel 103 at first end 118 of the guide effect lower edge of baffle plate 106 top panel 103, can easily chute 201 to be installed and the head of mounted chute 201 or scratch board conveyor be assembled afterwards, because first setpoint distance is greater than second setpoint distance that has between second end 119 of top panel 103 and the plane, lower panel 104 place, therefore can make chute 201 to be installed slide happy, can make simultaneously the mounted chute 201 that is positioned over top panel 103 second ends 119 form an elevation angle, thereby make things convenient for the assembly working of chute 201, avoided the artificial lifting method of available technology adopting that chute 201 is unloaded thus, the link of assembling, improve working security and efficiency of construction, reduced labour intensity and construction cost.Wherein, first draw-gear 401 can be winch or other draw-gears, and first draw-gear 401 can be fixed on the mounted chute 201 or near the mounted chute 201.
In the present embodiment, preferred, scratch board conveyor chute installation system also comprises second draw-gear 501, and described second draw-gear 501 is used for the described scratch board conveyor chute mounting platform 101 of traction and described scratch board conveyor chute mounting platform 101 is moved.Thus, after the installment work of finishing a chute 201, can scratch board conveyor chute mounting platform 101 forwards be drawn by second draw-gear 501, thereby the chute to be installed 201 after making it can be drawn the installation site that is beneficial to installation to the top panel 103 by first draw-gear 401.Wherein second draw-gear 501 can be winch or other draw-gears.
It should be noted that at last: above each embodiment is not intended to limit only in order to the technical solution of the utility model to be described; Although have been described in detail with reference to the utility model of aforementioned each embodiment, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps some or all of technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the scope of each embodiment technical scheme of the utility model.
Claims (8)
1. a scratch board conveyor chute mounting platform is characterized in that, comprising:
Platform support, comprise top panel and lower panel, connect by brace rod between described top panel and the lower panel, described top panel is used for the carrying chute, has one first setpoint distance between first end of described top panel and the plane, lower panel place, have one second setpoint distance between second end of described top panel and the plane, lower panel place, described first setpoint distance is greater than second setpoint distance;
Baffle plate is arranged at the both sides of described top panel and extends along the length direction of described top panel, is used for chute is play the guiding role.
2. scratch board conveyor chute mounting platform according to claim 1 is characterized in that, described scratch board conveyor chute mounting platform is removably connected by a plurality of platform assemblies and forms;
Described platform assembly comprises platform support assembly and baffle plate assembly, and described platform support assembly is used for forming described platform support, and described baffle plate assembly is used for forming described baffle plate;
Described platform support assembly comprises top panel assembly and lower panel assembly, connects by the brace rod assembly between described top panel assembly and the lower panel assembly, and described top panel assembly is used for forming described top panel, and described lower panel assembly is used for forming described lower panel.
3. scratch board conveyor chute mounting platform according to claim 2, it is characterized in that, the end of described top panel assembly is longer than or is shorter than in the end of described lower panel assembly and brace rod assembly, thereby form tenon or groove, a plurality of described platform support assemblies are formed described platform support by the grafting of tenon and groove.
4. scratch board conveyor chute mounting platform according to claim 1 is characterized in that, the baffle plate that is positioned at the second end place of described top panel is provided with handle hole.
5. scratch board conveyor chute mounting platform according to claim 1, it is characterized in that, first end of described baffle plate and described top panel forms first opening, and second end of described baffle plate and described top panel forms second opening, and the width of described first opening is greater than the width of described second opening.
6. scratch board conveyor chute mounting platform according to claim 1 is characterized in that, described first setpoint distance is 200 millimeters-300 millimeters.
7. a scratch board conveyor chute installation system is characterized in that, comprises arbitrary described scratch board conveyor chute mounting platform among first draw-gear and the claim 1-6;
Described first draw-gear is used for chute by first end traction of described top panel, second end to described top panel.
8. scratch board conveyor chute installation system according to claim 7, it is characterized in that, also comprise second draw-gear, described second draw-gear is used for the described scratch board conveyor chute mounting platform of traction and described scratch board conveyor chute mounting platform is moved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320192926 CN203171496U (en) | 2013-04-16 | 2013-04-16 | Scraper conveyer chute installation platform and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320192926 CN203171496U (en) | 2013-04-16 | 2013-04-16 | Scraper conveyer chute installation platform and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203171496U true CN203171496U (en) | 2013-09-04 |
Family
ID=49068248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320192926 Withdrawn - After Issue CN203171496U (en) | 2013-04-16 | 2013-04-16 | Scraper conveyer chute installation platform and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203171496U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103231336A (en) * | 2013-04-16 | 2013-08-07 | 淮南矿业(集团)有限责任公司 | Scraper conveyor chute installing platform and scraper conveyor chute installing system |
CN110817158A (en) * | 2019-11-29 | 2020-02-21 | 成都星云智联科技有限公司 | Anti-blocking upset material loading machine |
-
2013
- 2013-04-16 CN CN 201320192926 patent/CN203171496U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103231336A (en) * | 2013-04-16 | 2013-08-07 | 淮南矿业(集团)有限责任公司 | Scraper conveyor chute installing platform and scraper conveyor chute installing system |
CN103231336B (en) * | 2013-04-16 | 2015-07-08 | 淮南矿业(集团)有限责任公司 | Scraper conveyor chute installing platform and scraper conveyor chute installing system |
CN110817158A (en) * | 2019-11-29 | 2020-02-21 | 成都星云智联科技有限公司 | Anti-blocking upset material loading machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781590B (en) | TBM bears ring with reception hole and removes technique | |
CN203171496U (en) | Scraper conveyer chute installation platform and system | |
CN104763457A (en) | Safety removing device of safety removing fully-mechanized coal mining equipment | |
CN210217729U (en) | Shield constructs quick-witted and vertical translation device in bracket station | |
CN201581924U (en) | Hydraulic support truck platform device | |
CN105460483A (en) | Logistics transfer assisting device | |
CN102295247A (en) | Erector hoist | |
CN103231336B (en) | Scraper conveyor chute installing platform and scraper conveyor chute installing system | |
CN105626120A (en) | Hydraulic support loading and unloading device in roadway | |
CN103216092B (en) | Construction material handling method and equipment thereof | |
DE112014000114B4 (en) | Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same | |
CN202832586U (en) | Hydraulic support dismantling device | |
CN105200922B (en) | A kind of steel truss girder segment installation on ground transport device and transportation resources | |
CN204982676U (en) | Conveyer is assembled on steel purlin girder segment section ground | |
CN202337945U (en) | Outer side in-place beam body lifting device | |
CN205330706U (en) | Device of colliery underground operation face withdrawing support | |
CN211470628U (en) | Water conservancy closed conduit pipe conveyor | |
CN207377505U (en) | A kind of coal mine roadway multifunctional mobile trolley | |
CN108975171A (en) | A kind of accurate attaching/detaching apparatus of segmentation and application method of heating furnace water beam and column | |
CN208360169U (en) | Short distance transportation device for difference of height transport scene in coke oven engineering construction | |
CN203637850U (en) | Automatic rerail device actuated after vertical shaft lifting mine car exits from cages | |
CN202864784U (en) | Endless rope holding rope wheel set and endless rope winch | |
CN203998762U (en) | A kind of large band conveyer load-transfer device detaching device | |
CN204079379U (en) | A kind of compound type lifting device | |
CN209259562U (en) | A kind of movable hoisting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20130904 Effective date of abandoning: 20150708 |
|
RGAV | Abandon patent right to avoid regrant |