CN203161293U - Gas well draining device - Google Patents

Gas well draining device Download PDF

Info

Publication number
CN203161293U
CN203161293U CN 201320180340 CN201320180340U CN203161293U CN 203161293 U CN203161293 U CN 203161293U CN 201320180340 CN201320180340 CN 201320180340 CN 201320180340 U CN201320180340 U CN 201320180340U CN 203161293 U CN203161293 U CN 203161293U
Authority
CN
China
Prior art keywords
gas well
draining
dispenser
dewatering installation
installation according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320180340
Other languages
Chinese (zh)
Inventor
候建鑫
马国华
赵尹琛
崔健
杜葳蕾
高扬
丁峰
Original Assignee
候建鑫
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 候建鑫 filed Critical 候建鑫
Priority to CN 201320180340 priority Critical patent/CN203161293U/en
Application granted granted Critical
Publication of CN203161293U publication Critical patent/CN203161293U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)

Abstract

The utility model relates to the field of a gas well draining technology, in particular to a gas well draining device which comprises a shell, a feeder, a draining material hopper, a gas pump and an automatic controller. The gas pump is used for driving the feeder, and the automatic controller is used for controlling the gas pump; both the draining material hopper and the feeder are positioned in the shell; a feed inlet end and a discharge outlet end are oppositely arranged at two ends of the draining material hopper, draining materials can be stored at the feed inlet end, and the discharge outlet end is used for conveying the draining materials onto the feeder; and an opening which is used for being connected with a wellhead of a gas well is reserved at the bottom of the shell and is positioned below one side, which is far away from the draining material hopper, of the feeder. During operation, the draining materials are added into the feed inlet end of the draining material hopper and are conveyed onto the feeder via the discharge outlet end, the automatic controller controls the gas pump to act, the gas pump further drives the feeder to act, and the draining materials can fall into the gas well from the opening when the draining materials on the feeder move to the upper side of the opening. The gas well draining device has the advantages that material feeding operation can be automatically and continuously completed, and the efficiency is greatly improved.

Description

The gas well dewatering installation
Technical field
The utility model relates to gas well water discharge technology field, in particular to a kind of gas well dewatering installation.
Background technology
Gas well is to get into the well of gas-bearing formation from ground for tapping natural gas.Existing gas well is gas stringer particularly, and fluid-carrying capability is relatively poor, and condensation water gathers owing to slippage effect reaches the near region, shaft bottom gradually in pit shaft in the lifting process, and then produces the hydrops phenomenon, has a strong impact on the gas well ordinary production.
At present, relevant water discharge technology is for adding bubble row rod, the foaming water discharge gas production that utilizes bubble row rod to produce.Bubble row rod is generally and manually joins in the gas well, and complicated operation causes inefficiency.
The utility model content
The purpose of this utility model is to provide a kind of gas well dewatering installation, to solve the above problems.
In embodiment of the present utility model, provide
A kind of gas well dewatering installation comprises: housing, dispenser, draining hopper, be used for driving described dispenser air pump, be used for the automatic controller of the described air pump of control;
Described draining hopper, described dispenser all are positioned at described housing;
The two ends of described draining hopper are relatively set with the feed end that can deposit the draining material and are used for the draining material is transported to discharge end on the described dispenser;
The bottom of described housing is provided with the opening that is connected for the well head of gas well, and described opening is positioned at described dispenser away from the below of a side of described draining hopper.
The gas well dewatering installation of the utility model above-described embodiment is fixed on the well head of gas well.During work, the draining material is joined the feed end of draining hopper, the draining material is transported on the dispenser via discharge end, the action of automatic controller control air pump, air pump and then the action of driving dispenser, when the draining material on the dispenser moved to the opening top, the draining material just fell in the gas well from opening part, thereby can finish the work of feeding intake automatically and continuously, raise the efficiency greatly.
Description of drawings
Fig. 1 shows the gas well dewatering installation structural representation of the utility model embodiment;
Fig. 2 shows the interior structural representation of housing of the gas well dewatering installation of the utility model embodiment.
The specific embodiment
Also by reference to the accompanying drawings the utility model is described in further detail below by specific embodiment.
The utility model embodiment provides a kind of gas well dewatering installation, as depicted in figs. 1 and 2, comprise housing 1, dispenser 6, draining hopper 3, be used for driving described dispenser 6 air pump 9, be used for the automatic controller 10 of the described air pump 9 of control; Draining hopper 3, dispenser 6 all are positioned at housing 1; The two ends of draining hopper 3 are relatively set with the feed end 2 that can deposit the draining material and are used for the draining material is transported to discharge end 4 on the described dispenser 6; The bottom of housing 1 is provided with the opening 8 that is connected for the well head of gas well, and opening 8 is positioned at dispenser 6 away from the below of a side of draining hopper 3.The gas well dewatering installation of present embodiment is fixed on the well head of gas well.During work, the draining material is joined the feed end 2 of draining hopper 3, the draining material is transported on the dispenser 6 via discharge end 4,9 actions of automatic controller 10 control air pumps, air pump 9 and then 6 actions of driving dispenser, when the draining material on the dispenser 6 moved to opening 8 tops, the draining material just fell in the gas well from opening 8, thereby finish the work of feeding intake of finishing automatically and continuously, raise the efficiency greatly.
In the present embodiment, also be provided with valve 11 on the gas well dewatering installation, valve 11 is connected with the top of housing 1, like this can be in use for some time, valve 11 is opened venting, so that the pressure in the gas well reduces, avoid the excessive draining material that causes of gas well internal pressure to enter difficulty.
In the present embodiment, discharge end 4 is connected with conveying pipeline 5, and an end and the dispenser 6 of conveying pipeline 5 align, in order to the draining material is delivered on the dispenser 6.
In the present embodiment, dispenser 6 is for being provided with the plectane of breach 12, and breach 12 is positioned at the sidepiece of dispenser 6, and an end of conveying pipeline 5 aligns with breach 12 near draining hopper 3, so that draining material (as bubble row rod, bubble vollyball etc.) falls in the breach 12.Dispenser 6 is connected with the central axis 7 of setting coaxial with it, the bottom vertical of central axis 7 and housing 1, and central axis 7 is connected with housing 1.When central axis 7 drove dispenser 6 rotations, breach 12 rotated thereupon, and cooperates jointly with the bottom of housing 1 like this, made the draining material be delivered to a side of close opening 8 by dispenser 6 near a side of draining hoppers 3, and finally can fall in the opening 8.
In the present embodiment, a plurality of breach 12 can random distribution, also can array distribution, the preferred a plurality of breach 12 of present embodiment distribute about the axis circular array of described dispenser 6, like this when air pump 9 controls, each action of air pump 9 can make dispenser 6 turn over certain angle, thereby guarantees that the draining material in each breach 12 can fall in the gas well via opening 8 exactly.
In the present embodiment, breach 12 can be two, four etc., and present embodiment is preferably four breach 12, can make dispenser 6 finish the work of feeding intake like this in short stroke, reduces the working time of air pump 9.
The connected mode of opening 8 and well head has multiple, as be threaded, flange connection etc.In the present embodiment, opening 8 places are provided with in order to its flange of fixedlying connected with the well head of gas well, thereby the well head of opening 8 and gas well closely is connected by flange, guarantee the connection compactness at opening 8 places.
In the present embodiment, housing 1 is provided with the charge door 13 that is communicated with feed end 2, so that the again interpolation of draining material after using up.
In the present embodiment, the operating pressure of air pump 9 is between 0.4-0.8MPa.When air pump 9 pressure less than 0.4MPa, system can inflate automatically; When air pump 9 pressure autostop during greater than 0.8MPa.
The operating voltage of automatic controller 10 is about 12V.For the gas well dewatering installation can be moved automatically, can add battery and solar panel at automatic controller 10, to guarantee the work of automatic controller 10.
The above is preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (10)

1. a gas well dewatering installation is characterized in that, comprising: housing, dispenser, draining hopper, be used for driving described dispenser air pump, be used for the automatic controller of the described air pump of control;
Described draining hopper, described dispenser all are positioned at described housing;
The two ends of described draining hopper are relatively set with the feed end that can deposit the draining material and are used for the draining material is transported to discharge end on the described dispenser;
The bottom of described housing is provided with the opening that is connected for the well head of gas well, and described opening is positioned at described dispenser away from the below of a side of described draining hopper.
2. gas well dewatering installation according to claim 1 is characterized in that, also comprises: valve;
Described valve is connected with the top of described housing.
3. gas well dewatering installation according to claim 2 is characterized in that, described discharge end is connected with conveying pipeline;
One end and the described dispenser of described conveying pipeline align.
4. gas well dewatering installation according to claim 3 is characterized in that, described dispenser is the plectane that is provided with breach;
Described breach is positioned at the sidepiece of described plectane, and the described breach of an end of described conveying pipeline and close described draining hopper aligns.
5. gas well dewatering installation according to claim 4 is characterized in that, described plectane is connected with the central axis of setting coaxial with it;
The bottom vertical of described central axis and described housing, and described central axis is connected with described housing;
When described central axis drives described dispenser and rotates, described breach rotates thereupon, and cooperates jointly with the bottom of described housing and to make described draining material be delivered to a side of close described opening by described dispenser near a side of described draining hopper, and finally can fall into described opening.
6. gas well dewatering installation according to claim 4 is characterized in that, a plurality of described breach distribute about the axis circular array of described dispenser.
7. gas well dewatering installation according to claim 6 is characterized in that, described breach is four.
8. gas well dewatering installation according to claim 6 is characterized in that, described breach is two.
9. gas well dewatering installation according to claim 1 is characterized in that, described opening part is provided with in order to its flange of fixedlying connected with the well head of gas well.
10. gas well dewatering installation according to claim 1 is characterized in that, described housing is provided with the charge door that is communicated with described feed end.
CN 201320180340 2013-04-11 2013-04-11 Gas well draining device Expired - Fee Related CN203161293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320180340 CN203161293U (en) 2013-04-11 2013-04-11 Gas well draining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320180340 CN203161293U (en) 2013-04-11 2013-04-11 Gas well draining device

Publications (1)

Publication Number Publication Date
CN203161293U true CN203161293U (en) 2013-08-28

Family

ID=49022485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320180340 Expired - Fee Related CN203161293U (en) 2013-04-11 2013-04-11 Gas well draining device

Country Status (1)

Country Link
CN (1) CN203161293U (en)

Similar Documents

Publication Publication Date Title
CN204224584U (en) High vigor fungal laccase liquid submerged fermentation fermentor tank
CN203161293U (en) Gas well draining device
CN203695267U (en) Spray gun
CN206078623U (en) A automatic batch feeder at regular time and quantity for deep water net cage
CN202961947U (en) Chemical drying device
CN205617388U (en) Ash machine is sent in cement stirring stake
CN204527682U (en) Intelligent vacuum feeder
CN204429218U (en) Mixing feed mechanism
CN205887192U (en) Floatation device
CN106550919A (en) The goldfish jar that the synchronous oxygen supplement of energy feeds intake
CN104670534A (en) Intelligent vacuum feeder
CN205495387U (en) Pneumatic control's liquid chemistry raw materials adds device
CN203996957U (en) A kind of slurry can filler
CN209956984U (en) A stifled device is prevented in feed for lime is carried
CN103332505B (en) Powder air groove conveying and metering method and device thereof
CN203833936U (en) Device for liquid two-phase anaerobic fermentation differential-pressure feeding and discharging
CN206961788U (en) The dilution adding set of fluorescent tube electrophoretic electronic powder system
CN207240790U (en) A kind of plastic pellet vacuum charger
CN204051470U (en) A kind of coal water slurry storage tank stirs and entrucking composite device
CN205398467U (en) Atomizing of cement grinding aid sprays interpolation device
CN203638788U (en) Spiral feed mechanism
CN204039043U (en) Be easy to the liquid raw material barrel of feed
CN204684966U (en) A kind of for the composite tank of polycarboxylic acids masterbatch Special agitating
CN204756984U (en) Living beings shaping feed of fuel machine
CN204877412U (en) Be used for storing up defeated pipeline of gas of sand device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20160411

CF01 Termination of patent right due to non-payment of annual fee