CN203160586U - Structural member for connecting and hanging combination device integrated belts - Google Patents

Structural member for connecting and hanging combination device integrated belts Download PDF

Info

Publication number
CN203160586U
CN203160586U CN 201220682054 CN201220682054U CN203160586U CN 203160586 U CN203160586 U CN 203160586U CN 201220682054 CN201220682054 CN 201220682054 CN 201220682054 U CN201220682054 U CN 201220682054U CN 203160586 U CN203160586 U CN 203160586U
Authority
CN
China
Prior art keywords
sheet
unit equipment
brace
integrated belt
equipment integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220682054
Other languages
Chinese (zh)
Inventor
冯小牛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ALUCA DECORATION MATERIAL CO Ltd
Original Assignee
SHANGHAI ALUCA DECORATION MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ALUCA DECORATION MATERIAL CO Ltd filed Critical SHANGHAI ALUCA DECORATION MATERIAL CO Ltd
Priority to CN 201220682054 priority Critical patent/CN203160586U/en
Application granted granted Critical
Publication of CN203160586U publication Critical patent/CN203160586U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model relates to a structural member for connecting and hanging combination device integrated belts. The structural member comprises a connecting sheet, a side hanging sheet and an upper hanging sheet, wherein a connection bayonet is arranged at the front part of the connecting sheet, and a connection groove is formed in the rear part of the connecting sheet; a right-angle bayonet is arranged on one side of a side connecting sheet of the side hanging sheet, an installation connection groove is formed in a fixing adjustment sheet of the side hanging sheet, and the side connecting sheet is adjustably connected with the fixing adjustment sheet; and a right-angle bayonet is arranged at the lower end of the upper hanging sheet, a right-angle connection plate is arranged at the upper end of the upper hanging sheet, and a connection groove is formed in the right-angle connection plate. The combination device integrated belt adopts the connecting sheet, the side hanging sheet and the upper hanging sheet, and the combination device integrated belts are connected through the connecting sheet and can be detached and adjusted randomly according to the situation of the scene; or one-sided lamp belts, double-sided lamp belts and the like can be manufactured according to the design requirements; and auxiliary keels of the combination device integrated belts are fixed on main keels, so that the stability of a suspended ceiling is guaranteed, the smoothness of the suspended ceiling is guaranteed as well, the management is simplified, the technical content and the labor intensity of an installer are reduced, and methods for mounting the combination device integrated belts and the suspended ceiling are unified.

Description

The unit equipment integrated belt connects hoisting structure spare
Technical field
The utility model relates to the integrated belt that a kind of building functional device end face is installed, and is especially a kind of for the connector that connects between the unit equipment integrated belt and the unit equipment integrated belt lifts.
Background technology
At present, integrated equipment band market, though each enterprise all try one's best, at the fourths of the twelve Earthly Branches, aspect such as specification kind, appearance and modeling foots thought.But in the actual installation process, because it as the homogenous material unit, does not take into full account and the docking of furred ceiling, or docking port product requirement for restriction is too much, allows the construction and installation personnel feel in a helpless situation hopeless.As application for a patent for invention number: 200910154909.1, a kind of integrated belt and indoor top surface structure of terminal of building functional device are disclosed, integrated belt is fixedly installed in architectural construction, the cross section of integrated belt is flute profile, form inside and hold district (Fig. 1), hold the terminal that at least one building functional device is installed in the district, terminal can be drencher head, smoke detector, monitoring probe, loudspeaker, luminous body or air conditioning air outlet, and drencher head, smoke detector, monitoring probe, loudspeaker, luminous body are towards the integrated belt outside; When the terminal of building functional device was air conditioning air outlet, integrated belt had the through hole corresponding with air conditioning air outlet, and this through hole and integrated belt are outside to connect.Utility model patent number: 201020269925.3, a kind of high-intensity integrated belt is disclosed, made by sheet metal, form the untight district that holds, at least one stull supported in holding of integrated belt in the district, and the two ends of stull are fixed on the wall of integrated belt.Utility model patent numbers 201020269892.2, a kind of docking structure (Fig. 2) of integrated belt is disclosed, comprise the integrated belt of being made by sheet metal, the cross section of integrated belt is spill, three limits of its concave cross section are respectively two sides and middle limit, integrated belt close end at least on one side arranges slot, and the notch of this slot is towards the length direction of integrated belt; If a butt strip, itself and slot are suitable, and during two integrated belts butt joints, insert respectively in the corresponding slot of two integrated belts at two of butt strip.The cross section of above-mentioned three kinds of integrated belts all is flute profile, is made by sheet metal, and its width can not arbitrarily change, and length is the longest can only accomplish 2.4 meters, and inside also needs stull to strengthen, and needs docking structure to connect between two integrated belts.Give to make and installation is made troubles, especially can't be applied to install the indoor furred ceiling of heavy construction that width and length have specific (special) requirements.Particularly above-mentioned three kinds of integrated belts can't be connected lengthening with bayonet socket with the equipment band with general connector according to designing requirement, and rider keel is suspended on the ceiling, make monolateral lamp band, bilateral lamp band or more.The equipment strip length can be selected for use arbitrarily according to scene or designing requirement, reduces to greatest extent owing to conventional lamp is formed the integrality of bringing joint too much to influence the lamp band.
Summary of the invention The utility model is the connection hoisting structure spare that a kind of unit equipment integrated belt will be provided, be used for solving existing integrated belt complex structure, inconvenience and integrated equipment band are installed are dismantled adjustment arbitrarily according to field condition, also can make monolateral lamp band according to designing requirement, bilateral lamp band or more technical problem.
For achieving the above object, the technical solution of the utility model is: a kind of unit equipment integrated belt connects hoisting structure spare, comprises that brace, side are hung sheet, the sheet of hanging oneself, and be characterized in: the brace front portion is provided with the connection bayonet socket, and the rear portion is provided with link slot; Side is hung sheet and is made up of side brace and secured adjusted sheet, and side brace one side is provided with the right angle bayonet socket, and the secured adjusted sheet is provided with the installation link slot, the adjustable connection between side brace and the secured adjusted sheet; The sheet lower end of hanging oneself is provided with the right angle bayonet socket, and the upper end is provided with right-angle connecting plate, has link slot on the right-angle connecting plate.
The connection bayonet socket of brace and brace plate are rectangular in shape into the top brace of unit equipment integrated belt.
Brace is connected forward and backward rider keel by the removably connect forward and backward rider keel of unit equipment integrated belt of the connection bayonet socket on it and link slot.
Side is hung the aluminium alloys junction plate of sheet by the right angle bayonet socket on the side brace and single lamp unit equipment integrated belt one side and is removably connected, and fixedlys connected with lightgage steel joist by the link slot on the secured adjusted sheet.
The rider keel of sheet by the right angle bayonet socket on it and unit equipment integrated belt of hanging oneself removably connects, and fixedlys connected with lightgage steel joist by the upper end right-angle connecting plate.
Lightgage steel joist is fixedlyed connected with ceiling by unit equipment integrated belt suspension rod.
The beneficial effects of the utility model are:
The utility model can solve the butt joint of unit equipment integrated belt, furred ceiling and installation inconvenience and the integrated equipment band can be dismantled adjustment arbitrarily according to field condition, also can make monolateral lamp band according to designing requirement, bilateral lamp band or more technical problem.
The unit equipment integrated belt adopts that brace of the present invention, side are hung sheet, behind the sheet of hanging oneself, connect by brace between the unit equipment integrated belt, can can dismantle adjustment arbitrarily according to field condition, also can make monolateral lamp band according to designing requirement, bilateral lamp band or more.The rider keel of unit equipment integrated belt is fixed in the steadiness that has namely guaranteed furred ceiling on the main joist, guaranteed the planarization of furred ceiling again, easy management has alleviated installer's technology content and labour intensity, has unified the method for the installation of integrated equipment band and furred ceiling.And the rider keel of integrated equipment band can be made main joist and directly lift, ceiling material is installed and is shelved on the rider keel of integrated equipment band.
Adopt unit equipment integrated belt of the present utility model to combine seating means, mode and the node of metal furred ceiling in design and installation, make it to install more terse and unify its supporting metal furred ceiling just like one.
The utility model can be widely used in the commercial affairs building that write, government utility building, public transport building, public commercial building etc.
Description of drawings
Fig. 1 is existing integrated belt structural representation;
Fig. 2 is the docking structure schematic diagram of existing integrated belt;
Fig. 3 is that structure of the present utility model is installed schematic perspective view;
Fig. 4 is the brace schematic perspective view;
Fig. 5 is that side is hung the sheet schematic perspective view;
Fig. 6 is the sheet schematic perspective view of hanging oneself;
Fig. 7 is top brace schematic perspective view;
Fig. 8 is that the utility model is used for the schematic perspective view that the unit equipment integrated belt is installed.
The specific embodiment
The utility model is described in further detail for following structure accompanying drawing and embodiment.
As shown in Figure 3, unit equipment integrated belt of the present utility model connects hoisting structure spare, comprises that brace 1, side are hung sheet 2, the sheet 3 of hanging oneself.
As shown in Figure 4, brace 1 front portion is provided with and connects bayonet socket 4, and the rear portion is provided with link slot 5.Brace 1 is connected forward and backward rider keel 10 by the removably connect forward and backward rider keel 10 of unit equipment integrated belt of the connection bayonet socket 4 on it and link slot 5.
As shown in Figure 5, side is hung sheet 2 and is made up of side brace 5 and secured adjusted sheet 6, and side brace 5 one sides are provided with right angle bayonet socket 7, and secured adjusted sheet 6 is provided with installs link slot 8, the adjustable connection between side brace 5 and the secured adjusted sheet 6.Side is hung sheet 2 and is removably connected by the aluminium alloys junction plate 11 of the right angle bayonet socket 7 on the side brace 5 with single lamp unit equipment integrated belt one side, and fixedlys connected with lightgage steel joist 14 by the link slot 8 on the secured adjusted sheet 8.
As shown in Figure 6, sheet 3 lower ends of hanging oneself are provided with right angle bayonet socket 7, and the upper end is provided with right-angle connecting plate 12, has link slot 12 on the right-angle connecting plate 12.The sheet 3 of hanging oneself removably connects by the rider keel 15 of the right angle bayonet socket 7 on it with the unit equipment integrated belt, and fixedlys connected with lightgage steel joist 15 by upper end right-angle connecting plate 12.
As shown in Figure 7, the connection bayonet socket of brace 1 and brace plate are rectangular in shape into the top brace 9 of unit equipment integrated belt.
As shown in Figure 8, when the unit equipment integrated belt is installed, be connected with lightgage steel joist 15 with the sheet 3 of hanging oneself by the installation slot on rider keel 10 upper surfaces, wherein, the right angle bayonet socket 7 of sheet 3 lower ends of hanging oneself inserts in the installation slot of rider keel 10 upper ends.The aluminium alloys junction plate 11 of unit equipment integrated belt one side hangs sheet 2 by side and is connected with lightgage steel joist 15, wherein, right angle, the side brace 5 upper end bayonet socket 7 that side is hung sheet 2 inserts in the installation slot of aluminium alloys junction plates 11 sides, and the secured adjusted sheet 6 that side is hung sheet 2 is fixedlyed connected with lightgage steel joist 15.Lightgage steel joist 15 is fixedlyed connected with ceiling by unit equipment integrated belt suspension rod 14.And brace 1, side are hung sheet 2 and the sheet 3 of hanging oneself can be in the unit equipment integrated belt on the card of optional position and install.
More than preferred embodiment of the present utility model is had been described in detail; for those of ordinary skill in the art; the technical though that provides according to the utility model; the part that all can change on the specific embodiment of the present utility model and range of application, these changes also should be considered as protection domain of the present utility model.

Claims (6)

1. a unit equipment integrated belt connects hoisting structure spare, comprises that brace (1), side hang sheet (2), the sheet of hanging oneself (3), and it is characterized in that: described brace (1) front portion is provided with and connects bayonet socket (4), and the rear portion is provided with link slot (5); Side is hung sheet (2) and is made up of side brace (5) and secured adjusted sheet (6), side brace (5) one sides are provided with right angle bayonet socket (7), secured adjusted sheet (6) is provided with installs link slot (8), the adjustable connection between side brace (5) and the secured adjusted sheet (6); Sheet (3) lower end of hanging oneself is provided with right angle bayonet socket (7), and the upper end is provided with right-angle connecting plate (12), has link slot (13) on the right-angle connecting plate (12).
2. unit equipment integrated belt according to claim 1 connects hoisting structure spare, and it is characterized in that: connection bayonet socket (4) and the brace plate of described brace (1) are rectangular in shape into the top brace (9) of unit equipment integrated belt.
3. unit equipment integrated belt according to claim 1 connects hoisting structure spare, it is characterized in that: described brace (1) is connected forward and backward rider keel (10) by the removably connect forward and backward rider keel (10) of unit equipment integrated belt of the connection bayonet socket (4) on it and link slot (5).
4. unit equipment integrated belt according to claim 1 connects hoisting structure spare, it is characterized in that: described side is hung sheet (2) and is removably connected by the aluminium alloys junction plate (11) of the right angle bayonet socket (7) on the side brace (5) with single lamp unit equipment integrated belt one side, and fixedlys connected with lightgage steel joist (15) by the link slot (8) on the secured adjusted sheet (6).
5. unit equipment integrated belt according to claim 1 connects hoisting structure spare, it is characterized in that: the described sheet of hanging oneself (3) removably connects by the rider keel (15) of the right angle bayonet socket (7) on it with the unit equipment integrated belt, and fixedlys connected with lightgage steel joist (15) by upper end right-angle connecting plate (12).
6. connect hoisting structure spare according to claim 4 or 5 described unit equipment integrated belts, it is characterized in that: described lightgage steel joist (15) is fixedlyed connected with ceiling by unit equipment integrated belt suspension rod (14).
CN 201220682054 2012-12-12 2012-12-12 Structural member for connecting and hanging combination device integrated belts Withdrawn - After Issue CN203160586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220682054 CN203160586U (en) 2012-12-12 2012-12-12 Structural member for connecting and hanging combination device integrated belts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220682054 CN203160586U (en) 2012-12-12 2012-12-12 Structural member for connecting and hanging combination device integrated belts

Publications (1)

Publication Number Publication Date
CN203160586U true CN203160586U (en) 2013-08-28

Family

ID=49021781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220682054 Withdrawn - After Issue CN203160586U (en) 2012-12-12 2012-12-12 Structural member for connecting and hanging combination device integrated belts

Country Status (1)

Country Link
CN (1) CN203160586U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943551A (en) * 2012-12-12 2013-02-27 上海阿鲁考装饰材料有限公司 Connecting and hoisting structure member of combined equipment integration belts

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943551A (en) * 2012-12-12 2013-02-27 上海阿鲁考装饰材料有限公司 Connecting and hoisting structure member of combined equipment integration belts

Similar Documents

Publication Publication Date Title
CN205663068U (en) Support structure of installation unit formula curtain
CN202866099U (en) Universal keel hanging pieces for indoor ceiling
CN203160586U (en) Structural member for connecting and hanging combination device integrated belts
CN102912917B (en) Combined equipment band for building function equipment
CN102943551B (en) Connecting and hoisting structure member of combined equipment integration belts
CN207776211U (en) Waveform suspended ceiling
CN203613700U (en) Combined equipment belt for building function equipment
CN206205248U (en) A kind of main bone for being easy to keel shoe and the connector of pair bone clamping
CN205907951U (en) Arc perforation decorative aluminum board system
CN114592638A (en) Hanging structure of split type assembly type ceiling
CN203066320U (en) Combined equipment band for building function equipment
CN103541482B (en) Unit equipment band for building functional device
CN208363401U (en) Ceiling board mounting structure and horizontal support profile
CN207260411U (en) A kind of fixed structure of installation of ceiling connector and furred ceiling section bar
CN202731030U (en) Curtain wall claw type structure
CN203412503U (en) Invisible hanger of electric louver
CN204781715U (en) Integrated area convenient to assembly
CN216865672U (en) Suspended ceiling assembling structure
CN210421582U (en) Suspended ceiling mounting structure suitable for flat plate
CN211341365U (en) Top surface aluminium type rack molding mounting structure convenient to angle regulation
CN210238906U (en) Suspended ceiling mounting structure suitable for flat plate
CN217353159U (en) Hanging structure of split type assembly type ceiling
CN210035245U (en) Ceiling lamp capable of being hung on wall
CN209799240U (en) Keel frame for ceiling decoration
CN203068447U (en) Multifunctional aluminum alloy lantern support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130828

Effective date of abandoning: 20150513

RGAV Abandon patent right to avoid regrant