CN203157785U - Multi-height bus handle - Google Patents
Multi-height bus handle Download PDFInfo
- Publication number
- CN203157785U CN203157785U CN 201320189173 CN201320189173U CN203157785U CN 203157785 U CN203157785 U CN 203157785U CN 201320189173 CN201320189173 CN 201320189173 CN 201320189173 U CN201320189173 U CN 201320189173U CN 203157785 U CN203157785 U CN 203157785U
- Authority
- CN
- China
- Prior art keywords
- level
- handle
- length
- handle pipe
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Details Of Rigid Or Semi-Rigid Containers (AREA)
Abstract
The utility model discloses a multi-height bus handle. A handle frame is fixed on a bus transverse rod. The multi-height bus handle is characterized in that a soft connecting band which is arranged below the handle frame is fixed with an upper accommodating handle tube with an upper tube opening, first-level lifting ropes which are arranged at two ends of the upper accommodating handle tube are connected with a first-level accommodating handle tube with a first-level tube opening, second-level lifting ropes which are arranged at two ends of the first-level accommodating handle tube are connected with a second-level handle tube, third-level lifting ropes which are arranged at two ends of the second-level handle tube are connected with a third-level handle tube, the length of the first-level accommodating handle tube is 3-5mm longer than that of the upper accommodating handle tube, the length of the second-level handle tube is 3-5mm longer than that of the first-level accommodating handle tube, the length of the third-level handle tube is 3-5mm longer than that of the second-level handle tube, the inner diameter and the upper tube opening of the upper accommodating handle tube are 0.5-1.5mm larger than the outer diameter of the first-level accommodating handle tube, and the inner diameter and the first-level tube opening of the first-level accommodating handle tube are 0.5-1.5mm larger than the outer diameter of the second-level handle tube or the third-level handle tube.
Description
Technical field
The utility model relates to a kind of many height bus handles of a kind of people's that can satisfy different heights requirement.
Background technology
At present, widely used bus handle mainly is made up of two cross bars and montant, when people use hand is placed on lower floor's cross bar, can effectively keep the stable of health.But it is highly single to shake hands, and can not satisfy the people's of different heights requirement, and height is too high or cross all inconveniences of short use, and number of people in car more for a long time, and it is often not enough to shake hands.
Summary of the invention
Can not satisfy the people of different heights to the requirement of its height in order to overcome existing bus handle, with the public transport number of people in car not enough problem of shaking hands more for a long time, the utility model provides a kind of bus handle, can satisfy the people of different heights to the requirement of its height, and can effectively solve the occupant when too much, the not enough problem of using of handle.
The technical scheme that its technical matters that solves the utility model adopts is:
A kind of many height bus handles, grip handle is fixed on the bus cross bar, as improvement: described grip handle below have soft connecting band fixing to have tube opening on accommodate handle and manage, on accommodate handle pipe two ends and have the one-level lifting rope connecting the one-level that has the one-level tube opening to accommodate the handle pipe, one-level is accommodated handle pipe two ends has the secondary lifting rope connecting secondary handle pipe, secondary handle pipe two ends have three grades of lifting ropes connecting three grades of handle pipes, and described one-level is accommodated the handle length of tube greater than accommodating 3 to 5 millimeters of handle length of tube on described; Secondary handle length of tube is accommodated 3 to 5 millimeters of handle length of tube greater than described one-level; Three grades of handle length of tube are greater than 3 to 5 millimeters of described secondary handle length of tube; Accommodate the internal diameter of handle pipe on described and go up tube opening is accommodated the handle pipe greater than one-level 0.5 to 1.5 millimeter of external diameter; Described one-level is accommodated the handle internal diameter of pipe and one-level tube opening greater than 0.5 to 1.5 millimeter of the external diameter of secondary handle pipe or three grades of handle pipes.
As further improvement: described soft connecting band length is at 6 to 8 centimetres.
As further improvement: described one-level lifting rope length is at 7 to 9 centimetres.
As further improvement: described secondary lifting rope length is at 7 to 9 centimetres.
As further improvement: described three grades of lifting rope length are at 7 to 9 centimetres.
The beneficial effects of the utility model are:
1. can satisfy the people's of different heights requirement, and people use upper strata when pipe handle pipe of lower floor can being shaken hands to pack up the not use that can stand in other's way.
2. can solve the number of people in car not enough problem of shaking hands more for a long time.
Description of drawings
Front elevation when Fig. 1 all puts down state to good use for the utility model handles at different levels.
Fig. 2 is the lateral plan of Fig. 1.
Fig. 3 packs up three grades of handle pipes 32 for the utility model and is put into the front elevation of one-level when accommodating state in the handle pipe 12.
Fig. 4 is the lateral plan of Fig. 3, and secondary lifting rope 21 and three grades of lifting ropes 31 are overlapping.
Fig. 5 packs up secondary handle pipe 22 to be put into for the utility model and accommodates in the handle pipe 19, three grades of handle pipes 32 is packed up to be put into the front elevation of one-level when accommodating handle pipe 12 states simultaneously.
Fig. 6 is the lateral plan of Fig. 5, and one-level lifting rope 11 is overlapping with secondary lifting rope 21 and three grades of lifting ropes 31.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated:
In Fig. 1 and Fig. 2, a kind of many height bus handles, grip handle 80 is fixed on the bus cross bar 90, as improvement: described grip handle 80 belows have soft connecting band 18 fixing to have tube opening 17 on accommodate handle pipe 19, on accommodate handle pipe 19 two ends and have one-level lifting rope 11 connecting the one-level that has one-level tube opening 13 to accommodate handle pipe 12, one-level is accommodated handle pipe 12 two ends has secondary lifting rope 21 connecting secondary handle pipe 22, secondary handle pipe 22 two ends have three grades of lifting ropes 31 connecting three grades of handle pipes 32, and described one-level is accommodated handle pipe 12 length greater than accommodating 3 to 5 millimeters of handle pipe 19 length on described; Secondary handle pipe 22 length are accommodated 3 to 5 millimeters of handle pipe 12 length greater than described one-level; Three grades of handle pipe 32 length are greater than 3 to 5 millimeters of described secondary handle pipe 22 length; Accommodate the internal diameter of handle pipe 19 on described and go up tube opening 17 is accommodated handle pipe 12 greater than one-level 0.5 to 1.5 millimeter of external diameter; Described one-level is accommodated the internal diameter of handle pipe 12 and one-level tube opening 13 greater than 0.5 to 1.5 millimeter of the external diameter of 22 or three grades of handle pipes 32 of secondary handle pipe.
As further improvement: described soft connecting band 18 length are at 6 to 8 centimetres.
As further improvement: described one-level lifting rope 11 length are at 7 to 9 centimetres.
As further improvement: described secondary lifting rope 21 length are at 7 to 9 centimetres.
As further improvement: described three grades of lifting rope 31 length are at 7 to 9 centimetres.
Among the embodiment: one-level accommodate handle pipe 12 length greater than on accommodate 4 millimeters of handle pipe 19 length; Secondary handle pipe 22 length are accommodated 4 millimeters of handle pipe 12 length greater than one-level; Three grades of handle pipe 32 length are greater than 4 millimeters of secondary handle pipe 22 length; On accommodate the internal diameter of handle pipe 19 and go up tube opening 17 is accommodated handle pipe 12 greater than one-level 1 millimeter of external diameter; One-level is accommodated the internal diameter of handle pipe 12 and one-level tube opening 13 greater than 1 millimeter of the external diameter of 22 or three grades of handle pipes 32 of secondary handle pipe.Soft connecting band 18 length are at 7 centimetres, and one-level lifting rope 11 length are at 8 centimetres, and secondary lifting rope 21 length are at 8 centimetres, and three grades of lifting rope 31 length are at 8 centimetres.
In Fig. 3 and Fig. 4, not disturbed by three grades of handle pipes 32 in order to use secondary handle pipe, three grades of handle pipes 32 can be packed up and be put into one-level and accommodate in the handle pipe 12.
In Fig. 5 and Fig. 6, not disturbed by 22 and three grades of handle pipes 32 of secondary handle pipe in order to use one-level handle pipe, secondary handle pipe 22 can be packed up to be put into and accommodate in the handle pipe 19, simultaneously three grades of handle pipes 32 are packed up and be put into one-level and accommodate in the handle pipe 12.
Claims (5)
- More than one kind the height bus handle, grip handle (80) is fixed on the bus cross bar (90), it is characterized in that: described grip handle (80) below have soft connecting band (18) fixing to have tube opening (17) on accommodate handle and manage (19), on accommodate handle pipe (19) two ends and have one-level lifting rope (11) connecting the one-level that has one-level tube opening (13) to accommodate handle pipe (12), one-level is accommodated handle pipe (12) two ends has secondary lifting rope (21) connecting secondary handle pipe (22), secondary handle pipe (22) two ends have three grades of lifting ropes (31) connecting three grades of handle pipes (32), and described one-level is accommodated handle pipe (12) length greater than accommodating 3 to 5 millimeters of handle pipe (19) length on described; Secondary handle pipe (22) length is accommodated 3 to 5 millimeters of handle pipe (12) length greater than described one-level; Three grades of handle pipe (32) length are greater than 3 to 5 millimeters of described secondary handle pipe (22) length; Accommodate the internal diameter of handle pipe (19) on described and go up tube opening (17) is accommodated handle pipe (12) greater than one-level 0.5 to 1.5 millimeter of external diameter; Described one-level is accommodated the internal diameter of handle pipe (12) and one-level tube opening (13) greater than 0.5 to 1.5 millimeter of the external diameter of secondary handle pipe (22) or three grades of handle pipes (32).
- 2. a kind of many height bus handles according to claim 1, it is characterized in that: described soft connecting band (18) length is at 6 to 8 centimetres.
- 3. a kind of many height bus handles according to claim 1, it is characterized in that: described one-level lifting rope (11) length is at 7 to 9 centimetres.
- 4. a kind of many height bus handles according to claim 1, it is characterized in that: described secondary lifting rope (21) length is at 7 to 9 centimetres.
- 5. a kind of many height bus handles according to claim 1, it is characterized in that: described three grades of lifting ropes (31) length is at 7 to 19 centimetres.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320189173 CN203157785U (en) | 2013-04-01 | 2013-04-01 | Multi-height bus handle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320189173 CN203157785U (en) | 2013-04-01 | 2013-04-01 | Multi-height bus handle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203157785U true CN203157785U (en) | 2013-08-28 |
Family
ID=49018995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320189173 Expired - Fee Related CN203157785U (en) | 2013-04-01 | 2013-04-01 | Multi-height bus handle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203157785U (en) |
-
2013
- 2013-04-01 CN CN 201320189173 patent/CN203157785U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203158991U (en) | Lift car with articles convenient to put | |
CN203157785U (en) | Multi-height bus handle | |
CN203186174U (en) | Multi-section bus handle | |
CN202552685U (en) | Retractable handheld hanger | |
CN204252812U (en) | Portable deep-well rescue ladder | |
CN202505786U (en) | Medicine bottle inner cover convenient for taking syrup | |
CN203255476U (en) | Carry bag auxiliary device | |
CN203041685U (en) | Cushion cold water cup | |
CN202739038U (en) | Umbrella stand | |
CN202080639U (en) | Garbage can lathedog with handle | |
CN203845303U (en) | Simple bucket lifter with elastic hoop | |
CN202705003U (en) | Can opening device for soda water can | |
CN203986582U (en) | Check weighing handle | |
CN202577215U (en) | Fetch device | |
CN202456778U (en) | Key ring | |
CN209332749U (en) | A kind of DIY safe feeder | |
CN203145807U (en) | Pull-down hook device for roller shutter door | |
CN203134337U (en) | Piano roof structure provided with damper | |
CN202497004U (en) | Multi-functional fish steamer | |
CN208500100U (en) | A kind of stator hoisting device | |
CN104905525B (en) | The hamper that handle is interconvertible with handle | |
CN203052184U (en) | Pulling rod | |
CN106181941A (en) | A kind of cable hanger | |
CN202521576U (en) | Artistic candle holder | |
CN202932230U (en) | Draw-bar box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |