CN203149370U - Large gas generating unit background integrated monitoring system - Google Patents

Large gas generating unit background integrated monitoring system Download PDF

Info

Publication number
CN203149370U
CN203149370U CN 201320107784 CN201320107784U CN203149370U CN 203149370 U CN203149370 U CN 203149370U CN 201320107784 CN201320107784 CN 201320107784 CN 201320107784 U CN201320107784 U CN 201320107784U CN 203149370 U CN203149370 U CN 203149370U
Authority
CN
China
Prior art keywords
operation bench
monitoring system
waste heat
industrial switch
data line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320107784
Other languages
Chinese (zh)
Inventor
柏培文
夏继军
阮宜兵
张岩
李德建
杜婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUZHOU SEEK ELECTRONICS Co Ltd
Original Assignee
CHUZHOU SEEK ELECTRONICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUZHOU SEEK ELECTRONICS Co Ltd filed Critical CHUZHOU SEEK ELECTRONICS Co Ltd
Priority to CN 201320107784 priority Critical patent/CN203149370U/en
Application granted granted Critical
Publication of CN203149370U publication Critical patent/CN203149370U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a large gas generating unit background integrated monitoring system. The system comprises a gas conveying device, a waste heat boiler and a cooling device. The system is characterized in that the gas conveying device, the waste heat boiler and the cooling device are respectively connected with an industrial switch A through a data line; the industrial switch A is connected with a control platform B through a data line; the control platform B is connected with the annular Ethernet through a data line and an industrial switch B; the annular Ethernet is respectively connected with a computer and a printer; the industrial switch B is further connected with a control platform A; the control platform A is connected with a collector; the control platform B is connected with a collector; the gas conveying device, the waste heat boiler and the cooling device are respectively connected with a control cabinet; and the computer is connected with a remote computer through a remote interface. The system has the advantages of simple structure, convenient operation and online monitoring.

Description

Large-scale methane electrical generation unit backstage comprehensive monitoring system
Technical field
The utility model relates to a kind of supervisory system, is specifically related to a kind of large-scale methane electrical generation unit backstage comprehensive monitoring system, mainly is monitoring and the management at the genset on the gas.
Background technology
Gas is the maximum harm of Safety of Coal Mine Production, takes out afterwards earlier and adopts, and is to take precautions against gas accident, improves the plan of effecting a permanent cure of coal mine production safety degree of protection.But when gas pumping, control to genset is a very crucial step, and the control to genset in the past all is by manually monitoring, and implements the startup of genset and closes, so not only increased cost of labor, the overall work state can not get comprehensive monitoring simultaneously.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of large-scale methane electrical generation unit backstage comprehensive monitoring system, and this system architecture is simple, control conveniently, can implement on-line monitoring.
Technical problem to be solved in the utility model realizes by the following technical solutions.
Large-scale methane electrical generation unit backstage comprehensive monitoring system, this system comprises the gas conveying device, waste heat boiler and cooling device, it is characterized in that: described gas conveying device, waste heat boiler links to each other with industrial switch A by data line respectively with cooling device, described industrial switch A links to each other with operation bench B by data line, and the flow that gas is carried and the temperature of boiler and the temperature of cooling feed back to operation bench B, described operation bench B links to each other with ring-like Ethernet by data line and through industrial switch B, and described ring-like Ethernet also is connected with a computer and a printer respectively.
Described industrial switch B also is connected with operation bench A, and described operation bench A is connected with a collector; Described operation bench B also is connected with a collector.
In order to realize the single control to gas conveying device, waste heat boiler and cooling device, described gas conveying device, waste heat boiler and cooling device also are connected with a switch board respectively.
Described computer expert crosses remote interface and also links to each other with remote computer, thereby realizes remote monitoring.
The beneficial effects of the utility model are: this system architecture is simple, control conveniently, can implement on-line monitoring.
Description of drawings
Fig. 1 is the utility model system architecture synoptic diagram.
Embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
As shown in Figure 1, large-scale methane electrical generation unit backstage comprehensive monitoring system, this system comprises gas conveying device, waste heat boiler and cooling device, gas conveying device, waste heat boiler and cooling device link to each other with industrial switch A by data line respectively, industrial switch A links to each other with operation bench B by data line, and the flow that gas is carried and the temperature of boiler and the temperature of cooling feed back to operation bench B, operation bench B links to each other with ring-like Ethernet by data line and through industrial switch B, and ring-like Ethernet also is connected with a computer and a printer respectively.
Industrial switch B also is connected with operation bench A, and operation bench A is connected with a collector; Described operation bench B also is connected with a collector.
In order to realize the single control to gas conveying device, waste heat boiler and cooling device, described gas conveying device, waste heat boiler and cooling device also are connected with a switch board respectively.
The computer expert crosses remote interface and also links to each other with remote computer, thereby realizes remote monitoring.
More than show and described ultimate principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in above-described embodiment and the instructions just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (4)

1. large-scale methane electrical generation unit backstage comprehensive monitoring system, this system comprises the gas conveying device, waste heat boiler and cooling device, it is characterized in that: described gas conveying device, waste heat boiler links to each other with industrial switch A by data line respectively with cooling device, described industrial switch A links to each other with operation bench B by data line, and the flow that gas is carried and the temperature of boiler and the temperature of cooling feed back to operation bench B, described operation bench B links to each other with ring-like Ethernet by data line and through industrial switch B, and described ring-like Ethernet also is connected with a computer and a printer respectively.
2. according to the described large-scale methane electrical generation unit of claim 1 backstage comprehensive monitoring system, it is characterized in that: described industrial switch B also is connected with operation bench A, and described operation bench A is connected with a collector; Described operation bench B also is connected with a collector.
3. according to the described large-scale methane electrical generation unit of claim 1 backstage comprehensive monitoring system, it is characterized in that: described gas conveying device, waste heat boiler and cooling device also are connected with a switch board respectively.
4. according to the described large-scale methane electrical generation unit of claim 1 backstage comprehensive monitoring system, it is characterized in that: described computer expert crosses remote interface and also links to each other with remote computer, thereby realizes remote monitoring.
CN 201320107784 2013-03-11 2013-03-11 Large gas generating unit background integrated monitoring system Expired - Fee Related CN203149370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320107784 CN203149370U (en) 2013-03-11 2013-03-11 Large gas generating unit background integrated monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320107784 CN203149370U (en) 2013-03-11 2013-03-11 Large gas generating unit background integrated monitoring system

Publications (1)

Publication Number Publication Date
CN203149370U true CN203149370U (en) 2013-08-21

Family

ID=48976885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320107784 Expired - Fee Related CN203149370U (en) 2013-03-11 2013-03-11 Large gas generating unit background integrated monitoring system

Country Status (1)

Country Link
CN (1) CN203149370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107479468A (en) * 2017-08-30 2017-12-15 滁州市西控电子有限公司 A kind of large-scale gas electricity unit comprehensive monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107479468A (en) * 2017-08-30 2017-12-15 滁州市西控电子有限公司 A kind of large-scale gas electricity unit comprehensive monitoring system

Similar Documents

Publication Publication Date Title
CN104460627A (en) Hydropower station hydroelectric generating set display and control system and control method thereof
CN203149370U (en) Large gas generating unit background integrated monitoring system
CN205158074U (en) Landfill gas body preliminary treatment monitoring device
CN203294726U (en) Intrinsic safety type communication substation used for mine
CN104656730B (en) Dual path isolation constant-current type numerical-control direct-current power source
CN102437526A (en) Rapid repairing and integral dispatching system of power grid
CN203248345U (en) Intelligent energy-conservation control system for air compressor
CN204165598U (en) There is the gas intelligent metering system of real time alarm function
CN203832021U (en) Laser stability monitoring device used for laser coding machine
CN203038052U (en) Meter monitoring device
CN203854897U (en) Drying and packaging compacter for producing white carbon black
CN202513664U (en) Emergency power supply
CN203691312U (en) Chopper speed-regulating system of mining electric locomotive
CN204156612U (en) A kind of centralized control system of remote control power switch
CN203434724U (en) Uninterrupted integrated power supply system
CN202520294U (en) High-temperature and high-pressure thermal recovery steam injection pipeline decompression device for oil field
CN203525655U (en) Artificial diamond safe operation device
CN203164801U (en) Heating device based on distributed control system (DCS)
CN2912116Y (en) On-line passive controlled signaller
CN206362831U (en) A kind of multiple power supplies ConvertBox
CN204203715U (en) Production line alarming short message dispensing device
CN203529354U (en) Protective device for coal mine belt type conveying machine
CN204423197U (en) PET control device for wire drawing machine
CN202404473U (en) Short circuit automatic protection device
CN203569027U (en) Dust control system applied to field of coking

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20140311