CN203148935U - Evaluation device of dynamic gelling mold of profile modification blocking agent - Google Patents

Evaluation device of dynamic gelling mold of profile modification blocking agent Download PDF

Info

Publication number
CN203148935U
CN203148935U CN 201320156851 CN201320156851U CN203148935U CN 203148935 U CN203148935 U CN 203148935U CN 201320156851 CN201320156851 CN 201320156851 CN 201320156851 U CN201320156851 U CN 201320156851U CN 203148935 U CN203148935 U CN 203148935U
Authority
CN
China
Prior art keywords
evaluation device
fill out
out sand
liquid stream
sand tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320156851
Other languages
Chinese (zh)
Inventor
钱志鸿
汤元春
薛芸
姚峰
朱伟民
马惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Jiangsu Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Jiangsu Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Jiangsu Oilfield Co filed Critical China Petroleum and Chemical Corp
Priority to CN 201320156851 priority Critical patent/CN203148935U/en
Application granted granted Critical
Publication of CN203148935U publication Critical patent/CN203148935U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an evaluation device of a dynamic gelling mold of a profile modification blocking agent, and relates to the field of an experimental facility for researching the shearing behavior, sealing capacity and dynamic gelling behavior of a profile control agent under a reservoir condition. The evaluation device comprises a liquid flow steering apparatus, a liquid flow buffer unit, a temperature control unit, a sand-filled pipe, a pressure monitoring unit and a control terminal. The evaluation device ensures long-term and continuous movement and shearing of the profile control agent by reciprocating motion; the test condition is closer to the real situation by virtue of measures such as temperature control and outlet pressure regulation; and the experimental result has guiding significance.

Description

Profile-controlling and plugging agent dynamic colloid formation thing mould evaluating apparatus
Technical field
The utility model relates to the experimental facilities field that belongs to shearing behavior, shut-off capacity and the plugging agent dynamic colloid formation behavioral study of plugging agent under reservoir condition.
Background technology
Behind the high water-cut stage, profile control and water plugging technology was as the effective measures of water and oil control during oil-field development entered, and at home and abroad the oil field has obtained widespread use.But rig-site utilization shows that one-tenth glue rule and the indoor static test rule of plugging agent in oil reservoir has a long way to go, and mainly shows the variation on gelation time and the gelling strength.One-tenth glue behavior when how better to estimate plugging agent and migrating under reservoir condition is the problem that the researchist is concerned about always.
At present, the desk research plugging agent is dynamically migrated into the thing mould evaluating apparatus of glue behavior under reservoir condition, its volume is big, precision is relatively poor, need keep transferring stifled liquid to inject continuously during use, shear time has only several hrs in rock core, and constructing continuously with on-the-spot 15-30d differs bigger, so situation and the on-site actual situations of experimental result reaction differ greatly, influence blocking agent type selecting, performance optimization and consumption decision-making, directly influence profile control effect and benefit.
Summary of the invention
The purpose of this utility model provides the whole profile control and water plugging of a kind of simulation construction period and transfers stifled liquid to become glue rule, shutoff situation in the migration process under formation condition, correctly is familiar with the profile-controlling and plugging agent dynamic colloid formation thing mould evaluating apparatus of transferring stifled liquid real conditions in the stratum during the whole construction.
The utility model comprises flow diversion apparatus, liquid stream buffer cell, temperature conditioning unit, fill out sand tube, pressure monitoring unit and control terminal; Two liquid flow exports about described flow diversion apparatus comprises, about two liquid flow exports be connected with liquid stream buffer cell respectively, the endpiece of a liquid stream buffer cell is connected with an end of fill out sand tube, and the endpiece of another liquid stream buffer cell is connected with the other end of fill out sand tube; Fill out sand tube places in the temperature conditioning unit, and the two ends of fill out sand tube are respectively arranged with the pressure monitoring unit, and described control terminal is connected with flow diversion apparatus, is used for the control of liquid stream in the parameters of device.
Principle of work of the present utility model: pumped liquid stream produces the liquid stream of a change direction under different frequency by flow diversion apparatus, being transmitted to the stifled liquid of the accent that promotes in the rock core in the rock core migrates back and forth, the stifled liquid of simulation accent is migrated in rock core and is sheared, by rock core pressure at two ends situation of change, can observe the dynamically migration simulation of gelling strength down of plugging agent.
The utility model adopts to move back and forth and guarantees long-time, mobile, the shearing continuously of the stifled liquid of accent, and by measures such as temperature adjusting, outlet pressure regulation, test condition is more close to on-the-spot truth, and test findings has directive significance.
The pressure that described pressure monitoring unit is used for monitoring fill out sand tube two ends, middle part changes.
Described liquid stream buffer cell is used for replenishing the liquid of circulation pipeline, plays buffer action simultaneously, guarantees the fluid pressure smooth change in the manifold.
Described flow diversion apparatus guarantees that liquid stream by certain flow rate, can change the direction of liquid flow simultaneously.
Control terminal is used for control liquid in parameters such as device flow velocity, flow directions.
Fill out sand tube is used for filling artificial, natural siliceous sand, the metal tube of simulate formation oil reservoir sand body.
Temperature conditioning unit is used for control fill out sand tube internal temperature.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, the utility model comprises flow diversion apparatus 1, liquid stream buffer cell 2 and 3, temperature conditioning unit 4, fill out sand tube 5, pressure monitoring unit 6,7 and control terminal 8.
Two liquid flow exports about flow diversion apparatus 1 comprises, about two liquid flow exports connect liquid stream buffer cell 2 and 3 respectively, the endpiece of liquid stream buffer cell 2 is connected with the left end of fill out sand tube 5, the endpiece that liquid flows buffer cell 3 is connected with the right-hand member of fill out sand tube 5; Fill out sand tube 5 places in the temperature conditioning unit 4, and the two ends of fill out sand tube 5 are respectively arranged with pressure monitoring unit 6 and 7, and described control terminal 8 is connected with flow diversion apparatus 1, is used for the control of liquid stream in the parameters of device.

Claims (1)

1. profile-controlling and plugging agent dynamic colloid formation thing mould evaluating apparatus comprises flow diversion apparatus, liquid stream buffer cell, temperature conditioning unit, fill out sand tube, pressure monitoring unit and control terminal; Two liquid flow exports about described flow diversion apparatus comprises, about two liquid flow exports be connected with liquid stream buffer cell respectively, the endpiece of a liquid stream buffer cell is connected with an end of fill out sand tube, and the endpiece of another liquid stream buffer cell is connected with the other end of fill out sand tube; Fill out sand tube places in the temperature conditioning unit, and the two ends of fill out sand tube are respectively arranged with the pressure monitoring unit, and described control terminal is connected with flow diversion apparatus, is used for the control of liquid stream in the parameters of device.
CN 201320156851 2013-04-01 2013-04-01 Evaluation device of dynamic gelling mold of profile modification blocking agent Expired - Lifetime CN203148935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320156851 CN203148935U (en) 2013-04-01 2013-04-01 Evaluation device of dynamic gelling mold of profile modification blocking agent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320156851 CN203148935U (en) 2013-04-01 2013-04-01 Evaluation device of dynamic gelling mold of profile modification blocking agent

Publications (1)

Publication Number Publication Date
CN203148935U true CN203148935U (en) 2013-08-21

Family

ID=48976451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320156851 Expired - Lifetime CN203148935U (en) 2013-04-01 2013-04-01 Evaluation device of dynamic gelling mold of profile modification blocking agent

Country Status (1)

Country Link
CN (1) CN203148935U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195718A (en) * 2017-12-07 2018-06-22 浙江海洋大学 A kind of simulation oil reservoir full-scale condition polymer viscosity changeable device
CN108195717A (en) * 2017-12-07 2018-06-22 浙江海洋大学 A kind of simulation oil reservoir full-scale condition polymer viscosity changeable device and method
CN109342270A (en) * 2018-10-26 2019-02-15 中国石油天然气股份有限公司 The determining device of the gelation time of cross-linked polymer solution and determining method
CN112360403A (en) * 2020-09-29 2021-02-12 中海油能源发展股份有限公司 Simulation device and test method for evaluating reservoir shearing resistance of gel plugging agent of screen pipe well completion production well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195718A (en) * 2017-12-07 2018-06-22 浙江海洋大学 A kind of simulation oil reservoir full-scale condition polymer viscosity changeable device
CN108195717A (en) * 2017-12-07 2018-06-22 浙江海洋大学 A kind of simulation oil reservoir full-scale condition polymer viscosity changeable device and method
CN109342270A (en) * 2018-10-26 2019-02-15 中国石油天然气股份有限公司 The determining device of the gelation time of cross-linked polymer solution and determining method
CN112360403A (en) * 2020-09-29 2021-02-12 中海油能源发展股份有限公司 Simulation device and test method for evaluating reservoir shearing resistance of gel plugging agent of screen pipe well completion production well

Similar Documents

Publication Publication Date Title
CN203148935U (en) Evaluation device of dynamic gelling mold of profile modification blocking agent
CN104005741B (en) The integrated physical simulation experiment device of the heterogeneous fluid displacement of reservoir oil-pulse release and method
CN202300351U (en) Long rock core model displacement device
CN109101046B (en) Gas flow control system for gas storage physical simulation injection and production
CN105738252A (en) Measurement method of flowable opening degree limit of thickened oil in cracks
CN105335600A (en) Method and system for obtaining shear-thinning characteristic of polymer solution in stratum
CN111695307B (en) Water hammer finite volume simulation method considering dynamic friction resistance explicitly
CN103984823A (en) Method for determining flow resistance of porous plate with any tubular type
CN201697913U (en) Testing device for sealing performance of colloid
CN201225143Y (en) On-line injection cut and drive-adjustable apparatus
CN109117596B (en) Numerical simulation method for paste filling pipeline erosion
CN103485769A (en) Sand filling tube combination device for simulating fractured reservoir
CN204082126U (en) A kind of visual experimental apparatus of simulation wellbore hole annulus multi phase flow
Xin Development and application of flow control screen completion for horizontal wells
Yu et al. Study on influencing factors of leakage of epoxy resin grouting
CN105550780A (en) Prediction method and apparatus for cold damage of fracturing fluid to tight oil productivity
CN206420850U (en) A kind of no benzene Guan Liuzhong microbubbles move visual experimental apparatus
CN205189846U (en) Viscous crude well is with thinner device
CN201804490U (en) Combined connecting rock core model pipe
CN203420856U (en) Viscosity reduction pump
CN109780294A (en) Pipeline flow control device and method
CN201963300U (en) Simulative multilevel cylinder sand filling tube device of two-dimensional rock core
CN102828746B (en) Pressure return device for water plugging profile control physical simulation experiment and use method of pressure return device
Song et al. Analysis of ball valve sealing pressure ratio based on UG Nastran
CN201786355U (en) Selective chemical plugging simulating device for gravel packed well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130821

CX01 Expiry of patent term