CN203145366U - Easily-assembled glass metal handrail - Google Patents

Easily-assembled glass metal handrail Download PDF

Info

Publication number
CN203145366U
CN203145366U CN 201320015288 CN201320015288U CN203145366U CN 203145366 U CN203145366 U CN 203145366U CN 201320015288 CN201320015288 CN 201320015288 CN 201320015288 U CN201320015288 U CN 201320015288U CN 203145366 U CN203145366 U CN 203145366U
Authority
CN
China
Prior art keywords
metal
upright post
glass
metal upright
facial canal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320015288
Other languages
Chinese (zh)
Inventor
招景棉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongtu New Materials Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320015288 priority Critical patent/CN203145366U/en
Application granted granted Critical
Publication of CN203145366U publication Critical patent/CN203145366U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an easily-assembled glass metal handrail comprising a surface tube, metal columns, glass plates, upper cross bars and lower cross bars. The easily-assembled glass metal handrail is characterized in that grooves used for clamping the glass plates are respectively arranged on the upper cross bars and the lower cross bars, cross-bar connecting pieces are respectively arranged on the upper and lower portions of the sides of the metal columns, and two ends of the upper cross bars are connected with the cross-bar connecting pieces on the upper portions of the metal columns to allow each of the upper cross bars to be assembled on the upper portions of each two metal columns; two ends of the lower cross bars are connected with the cross-bar connecting pieces on the lower portions of the metal metals to allow each of the lower cross bars to be assembled on the lower portions of each two metal columns; and top edges of the glass plates are inserted into the grooves of the upper cross bars and lower edges of the glass plates are inserted into the grooves of the lower cross bars to allow each of the glass plates to be assembled between each two metal columns, and the surface tube is mounted at the tops of the metal columns. The easily-assembled glass metal handrail has the advantages of simplicity in structure, convenience in assembly, good in assembling firmness and low in cost and the like.

Description

A kind of glass metal railing of easy assembling
Technical field
The utility model relates to a kind of glass metal railing.
Background technology
Existing glass balustrade product generally is made of column, glass plate, cross tube, sheer pole and handrail tube.Wherein, the syndeton between cross tube, sheer pole and the column generally has two kinds of modes: a kind of is by welding manner cross tube, sheer pole to be welded admittedly with column; This mode trouble of constructing, assembling is inconvenient, and weld line is comprehended and had influence on the attractive in appearance of railing.Another kind is by the specialized designs fixed part, to carry out fixedly connected in conjunction with screw; Owing to need to adopt special fixed part and more screw, assemble up comparatively cumbersomely, manufacturing cost is higher.
The utility model content
The purpose of this utility model is to provide a kind of glass metal railing of simple in structure, easy to assembly, the assembling fastness is good, cost is low easy assembling.
The technical solution of the utility model is achieved in that
A kind of glass metal railing of easy assembling, comprise facial canal, metal upright post, glass plate, cross tube and sheer pole, its characteristics are to be respectively equipped with on described cross tube and the sheer pole be used to the groove that clamps glass plate, top, side and the bottom of described metal upright post are respectively equipped with cross rod connector, and described cross tube is connected with the cross rod connector on metal upright post top by its two end and makes cross tube be assemblied in the top of every two metal upright posts; Described sheer pole is connected with the cross rod connector of metal upright post bottom by its two end and makes sheer pole be assemblied in the bottom of per two metal upright posts; Described glass plate goes into by its top margin setting-in in the groove of cross tube, with and the base setting-in go in the groove of sheer pole glass plate is installed between per two metal upright posts, described facial canal is installed on the top of metal upright post.
Wherein, described cross rod connector becomes by top board, left plate, right plate and end plate and surrounds the cross bar kept supplying that constitutes or the link of sheer pole plug-in mounting.
In order to make facial canal can be installed on the top of metal upright post simply, easily, the top of described metal upright post also is provided with the facial canal connector, this facial canal connector constitutes by connecting jacking plate, moulding support middle part and socket bottom, this facial canal connector is fixedly connected with the bottom surface of facial canal, and described socket bottom is set in the top of metal upright post.
The utility model is by foregoing structure design, make assemble up between column and cross tube, the sheer pole more simple, glass plate clamps more easy, and the component that use still less, be more conducive to control manufacturing cost, whole structure bonding strength is higher, and the assembling fastness is good, and durability is good.The utlity model has characteristics simple in structure, easy to assembly, can apply to produce the glass balustrade product of all size widely.
Below in conjunction with accompanying drawing the utility model is further described:
Description of drawings
Fig. 1 is Facad structure schematic diagram of the present utility model.
Fig. 2 is the assembly structure schematic diagram of glass plate of the present utility model and sheer pole.
Fig. 3 is the local structure for amplifying schematic diagram of Figure 1A of the present utility model-A.
Fig. 4 is the local sectional structure schematic diagram that amplifies of Figure 1B of the present utility model-B.
Fig. 5 is the perspective view of facial canal connector of the present utility model.
Fig. 6 is the side structure schematic diagram of scheme one of the present utility model.
Fig. 7 is the side structure schematic diagram of scheme two of the present utility model.
The specific embodiment
As Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4, the glass metal railing of a kind of easy assembling described in the utility model, comprise facial canal 1, metal upright post 2, glass plate 3, cross tube 4 and sheer pole 5, for the purpose that realizes the utility model proposes, be respectively equipped be used to the groove 6 that clamps glass plate 3 on described cross tube 4 and the sheer pole 5, top, side and the bottom of described metal upright post 1 are respectively equipped with cross rod connector 7, described cross tube 4 is connected with the cross rod connector 7 on metal upright post 1 top by its two end and makes cross tube 4 be assemblied in the top of every two metal upright posts 1, namely as shown in Figure 3 and Figure 4.Described sheer pole 5 is connected with the cross rod connector 7 of metal upright post 1 bottom by its two end and makes sheer pole 4 be assemblied in the bottom of per two metal upright posts 1.Because the assembly structure of this bottom and the assembly structure basically identical of cross tube and metal upright post are so those skilled in the art can understand its assembly structure with reference to Fig. 3 and Fig. 4.Described glass plate 3 goes into by its top margin setting-in in the groove 6 of cross tube 4, with and base (being the base of glass plate 3) setting-in go in the groove 6 of sheer pole 5 glass plate 3 is installed between per two metal upright posts 1, its concrete assembly structure can be as Fig. 1, Fig. 5 and shown in Figure 6.Described facial canal 1 is installed on the top of metal upright post 2.By such structure design, make assemble up between metal upright post and cross tube, the sheer pole more simple, glass plate clamps more easy, and the component that use still less, be more conducive to control manufacturing cost, whole structure bonding strength is higher, and the assembling fastness is good, and durability is good.
In order to optimize the structure of cross rod connector 7 further, as shown in Figure 5, described cross rod connector 7 becomes by top board 71, left plate 72, right plate 73 and end plate 74 and surrounds the cross bar kept supplying 4 that constitutes or the link of sheer pole 5 plug-in mountings.In addition, on the end plate 74 of cross rod connector 7, also have screw 75, this cross rod connector 7 by passing across metal upright post 2 and its end plate 74 screws 75 bolt 8(and be equipped with suitable nut 10) be fixedly mounted on the metal upright post 2, namely as shown in Figure 4.
In order to make facial canal can be installed on the top of metal upright post simply, easily, as Fig. 3 and Fig. 4, and shown in Figure 5, the top of described metal upright post 1 also is provided with facial canal connector 9, this facial canal connector 9 constitutes by connecting jacking plate 91, moulding support middle part 92 and socket bottom 93, this facial canal connector 9 is fixedly connected with the bottom surface of facial canal 1, and described socket bottom 93 is set in the top of metal upright post 1.In addition, in order to satisfy different clients' different application requirement, outside one of Fig. 3, Fig. 4 and scheme shown in Figure 5, the assembly structure of described facial canal 1 and metal upright post 2, also can also be connected and fixed as shown in Figure 6, be that facial canal 1 directly is welded as a whole with metal upright post 2, perhaps the correspondence position of employing in the bottom surface of facial canal 1 is welded with socketed pipe 11 earlier, and then undertaken being fixedly connected with the top of metal upright post 2 by this socketed pipe 11.
For with quality, weight and the cost control of this railing product in reasonable range comparatively, facial canal described in the utility model 1 is general, and to adopt pipe thickness be that the tubing of 0.6-4mm is processed.Described metal upright post 2 is adopted as square tube or flat tube is processed, and the pipe thickness of this square tube or flat tube is about 0.6-5mm.The thickness of described glass plate 3 is 3-19mm, can be individual layer tempered glass, doubling glass, hollow glass, laminated glass etc.
The fixed form on the footing of metal upright post 2 of the present utility model and floor 12, and the fixed form of the end of facial canal 1 and wall 13, the same substantially with existing glass balustrade product, so be not repeated in this description.

Claims (7)

1. easy glass metal railing of assembling, comprise facial canal (1), metal upright post (2), glass plate (3), cross tube (4) and sheer pole (5), it is characterized in that: be respectively equipped be used to the groove that clamps glass plate (3) (6) on described cross tube (4) and the sheer pole (5), the top, side of described metal upright post (1) and bottom are respectively equipped with cross rod connector (7), and described cross tube (4) is connected with the cross rod connector (7) on metal upright post (1) top by its two end and makes cross tube (4) be assemblied in the top of every two metal upright posts (1); Described sheer pole (5) is connected with the cross rod connector (7) of metal upright post (1) bottom by its two end and makes sheer pole (4) be assemblied in the bottom of per two metal upright posts (1); Described glass plate (3) goes into by its top margin setting-in in the groove (6) of cross tube (4), with and the base setting-in go in the groove (6) of sheer pole (5) glass plate (3) is installed between per two metal upright posts (1), described facial canal (1) is installed on the top of metal upright post (2).
2. according to the glass metal railing of the described easy assembling of claim 1, it is characterized in that: described cross rod connector (7) becomes by top board (71), left plate (72), right plate (73) and end plate (74) and surrounds the cross bar kept supplying (4) of formation or the link of sheer pole (5) plug-in mounting.
3. according to the glass metal railing of the described easy assembling of claim 2, it is characterized in that: also have screw (75) on the end plate (74) of described cross rod connector (7), this cross rod connector (7) is fixedly mounted on the metal upright post (2) by the bolt (8) that passes across metal upright post (2) and its end plate (74) screw (75).
4. according to the glass metal railing of the described easy assembling of claim 1, it is characterized in that: the top of described metal upright post (1) also is provided with facial canal connector (9), this facial canal connector (9) constitutes by connecting jacking plate (91), moulding support middle part (92) and socket bottom (93), this facial canal connector (9) is fixedly connected with the bottom surface of facial canal (1), and described socket bottom (93) is set in the top of metal upright post (1).
5. according to the glass metal railing of the described easy assembling of claim 1, it is characterized in that: the pipe thickness of described facial canal (1) is 0.6-4mm.
6. according to the glass metal railing of the described easy assembling of claim 1, it is characterized in that: described metal upright post (2) is square tube or flat tube, and the pipe thickness of this square tube or flat tube is 0.6-5mm.
7. according to the glass metal railing of the described easy assembling of claim 1, it is characterized in that: the thickness of described glass plate (3) is 3-19mm.
CN 201320015288 2013-01-13 2013-01-13 Easily-assembled glass metal handrail Expired - Fee Related CN203145366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320015288 CN203145366U (en) 2013-01-13 2013-01-13 Easily-assembled glass metal handrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320015288 CN203145366U (en) 2013-01-13 2013-01-13 Easily-assembled glass metal handrail

Publications (1)

Publication Number Publication Date
CN203145366U true CN203145366U (en) 2013-08-21

Family

ID=48972905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320015288 Expired - Fee Related CN203145366U (en) 2013-01-13 2013-01-13 Easily-assembled glass metal handrail

Country Status (1)

Country Link
CN (1) CN203145366U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152812A (en) * 2021-03-26 2021-07-23 北京光辉建业建筑科技有限公司 Aluminum alloy assembled railing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152812A (en) * 2021-03-26 2021-07-23 北京光辉建业建筑科技有限公司 Aluminum alloy assembled railing

Similar Documents

Publication Publication Date Title
CN215563350U (en) Steel structure beam column reinforced connection node
CN203145366U (en) Easily-assembled glass metal handrail
CN203821837U (en) Universal type integral bearing platformformwork
CN203145368U (en) Simple-structure glass metal railing
CN203381886U (en) Combined type box
CN203145367U (en) Conveniently assembled glass-metal rail
CN212427546U (en) Height-adjustable steel structure connecting seat
CN201760075U (en) Removable sitting sledge
CN203531506U (en) Aluminum alloy guardrail structure
CN210395637U (en) Assembled beam column connected node
CN201164187Y (en) Metal rack
CN200999463Y (en) Cast-in-situ concrete beam formwork support composite construction
CN203361502U (en) Movable decorative wallboard
CN201268020Y (en) Die carrier for locating screw on beach chair
CN218970222U (en) Building structure design wall post foot connection structure
CN203201451U (en) Stepped escalator
CN201407258Y (en) Novel column-beam connecting device
CN211144342U (en) Multipurpose folding ladder convenient to transport
CN216147475U (en) Stable glass lifting table
CN204893272U (en) Can dismantlement activity bed -jig
CN218028229U (en) Reinforced steel structure convenient to steel structure joint department
CN214733663U (en) Sightseeing elevator frame construction
CN211433294U (en) Section bar structure for medical furniture and cart
CN221160072U (en) Battery plastic clamping mechanism
CN216316691U (en) Bed board connecting and fixing device and bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181227

Address after: 529728 New Material Base of Heshan Gonghe Town, Jiangmen City, Guangdong Province (Block A, Heshan Hongtu Tieyi Industrial Co., Ltd.)

Patentee after: HESHAN HONGTU IRONWARE Co.,Ltd.

Address before: 528000 Nanbian Street, Jihua Village, Yunzhou, Nanzhuang Town, Chancheng District, Foshan City, Guangdong Province

Patentee before: Cotton viewing

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 529728 New Material Base of Heshan Gonghe Town, Jiangmen City, Guangdong Province (Block A, Heshan Hongtu Tieyi Industrial Co., Ltd.)

Patentee after: Guangdong Hongtu New Materials Technology Co.,Ltd.

Address before: 529728 New Material Base of Heshan Gonghe Town, Jiangmen City, Guangdong Province (Block A, Heshan Hongtu Tieyi Industrial Co., Ltd.)

Patentee before: HESHAN HONGTU IRONWARE Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20220113