CN203143620U - Accumulated material self-cleaning mechanism of belt conveyor transfer station - Google Patents

Accumulated material self-cleaning mechanism of belt conveyor transfer station Download PDF

Info

Publication number
CN203143620U
CN203143620U CN 201320130019 CN201320130019U CN203143620U CN 203143620 U CN203143620 U CN 203143620U CN 201320130019 CN201320130019 CN 201320130019 CN 201320130019 U CN201320130019 U CN 201320130019U CN 203143620 U CN203143620 U CN 203143620U
Authority
CN
China
Prior art keywords
buildup
band conveyor
funnel
accumulated
downstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320130019
Other languages
Chinese (zh)
Inventor
陈吉霄
张瑞正
谢朋朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Port Group Co Ltd
Original Assignee
Qingdao Port Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Port Group Co Ltd filed Critical Qingdao Port Group Co Ltd
Priority to CN 201320130019 priority Critical patent/CN203143620U/en
Application granted granted Critical
Publication of CN203143620U publication Critical patent/CN203143620U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model discloses an accumulated material self-cleaning mechanism of a belt conveyor transfer station. The accumulated material self-cleaning mechanism of the belt conveyor transfer station is provided to overcome the shortcomings that due to the fact that occupied materials in an existing continuous belt conveyor transfer station are cleaned through manual work, occupied manpower is much, labor intensity of the manual work is high, work efficiency is low, operating cost is high, and manual operation is not safe. A grating plate is arranged below a belt conveyor of the transfer station, a material accumulating hopper is arranged in an accumulated material dropping position, below a belt, on the back face of the grating plate, the accumulated material hopper is provided with an outlet, and the outlet of the accumulated material hopper faces towards an accumulated material cleaning area. Due to the fact that the grating plate with the material accumulating hopper is arranged below the belt conveyor and the outlet of the material accumulating hopper faces towards the accumulated material cleaning area, accumulated materials which are swept from a cleaner or drop from a belt return stroke belt pass through a cavity of the grating plate, automatically drop into the material accumulating hopper and then drop to the accumulated material cleaning area from a lower opening to be processed in a centralized mode, the accumulated materials do not need to be cleaned by a specially-assigned person, the labor intensity is lowered, manpower resources are saved, safe production is guaranteed, no energy is consumed due to the fact that the accumulated materials automatically drop to the accumulated material cleaning area, work efficiency is high due to the fact that the accumulated materials are processed in the centralized mode, and cost of an enterprise is saved.

Description

Band conveyor is reprinted the station buildup from the clear structure
Technical field
The utility model belongs to the auxiliary facilities of Transport Machinery, specifically a kind ofly is used in buildup on the belt transporter transfer post from the clear structure.
Background technology
Be engaged in mine, the harbour of material operations such as coal, ore, generally be to transmit fragmentary material with belt transporter, the transfer post that uses many band conveyors to transport is continuously transported to predetermined storage place with material, its mode of transporting continuously is, below main band conveyor is positioned at the oblique anterior position of main band conveyor roller, the transhipment funnel is installed, the outlet of transhipment funnel is to the belt conveyor of band conveyor downstream, and material that main band conveyor is transported is fallen by the transhipment funnel and transported on the band conveyor of downstream.
Because the coal that belt transporter is carried, ore etc. are mostly relatively wetter sticking, fragmentary thing is easy to stick to the surface of return belt, the buildup phenomenon that ubiquity in the belt head roller frame frame and the belt feeder web causes because of backhaul band material on the transfer post, buildup is not only polluted operating environment, and if untimely cleaning also influences normally carrying out of transport.Present way is, belt configuration buildup swabbing pig at band conveyor, the material of sizing on the cleaning belt feeder return belt, and below the equipment of transfer post, be covered with common planar sheet material, swabbing pig clean get off buildup and the buildup that causes of belt feeder web backhaul band material, drop on the floor, plane under belt transporter in the capital, with manually removing at any time.Many belt transporter layerings on the transfer post connect to form the transhipment material, will be provided with the special messenger who removes buildup in layering place of each transfer post.It is many that the way of above-mentioned removing buildup takies manpower, and it is big manually to remove labour intensity, and inefficiency causes operation cost to raise; Simultaneously many people stand in that also there is potential safety hazard in the cleaning buildup near the equipment the floor.
The utility model content
Technical problem to be solved in the utility model is, overcoming existing belt continuous conveyor transfer post buildup, to take manpower by the labor cleaning many, labor cleaning's labour intensity is big, inefficiency, and the operation cost height, influence the shortcoming of safe operation, provide a kind of band conveyor to reprint the station buildup from the clear structure.
In order to solve the problems referred to above that prior art exists, the utility model is to adopt following technical proposals to realize: be equipped with flase floor below the main band conveyor of transfer post and downstream band conveyor, at the back side of main band conveyor and downstream band conveyor Under The Grille plate, be positioned at the position that the buildup of dropping is arranged below the belt, the buildup funnel is installed, the outlet subtend buildup cut-back region of buildup funnel.
The utility model also has following technical characterictic:
The buildup funnel of the installation under the described band conveyor, be under described main band conveyor the flase floor back side, be positioned at available funnel and guide position above the band conveyor belt of downstream into, outlet is installed to the main buildup funnel above the band conveyor belt downstream, near the position of main buildup funnel far-end, the secondary buildup funnel that outlet subtend buildup is concentrated clearing zone is installed at the flase floor back side; The flase floor back side under the band conveyor of downstream is in the position that the buildup of dropping is arranged, and the downstream buildup funnel that outlet subtend buildup is concentrated clearing zone is installed;
Described buildup concentrates clearing zone to be provided with the buildup collecting box, the import of the outlet subtend buildup collecting box of secondary buildup funnel and downstream buildup funnel;
In described buildup collecting box, be provided with material collecting tank, the spiral propeller that buildup can be pushed out is installed in the material collecting tank.
Advantage of the present utility model and good effect are, owing to below the band conveyor of material transfer post, be covered with the flase floor of many cavitys, below flase floor, the buildup funnel of its outlet subtend buildup clearing zone is installed, swabbing pig gets off from the belt of band conveyor, and the adhesion buildup that drops from described belt backhaul band material, can be automatically in the cavity of screen be fallen the buildup funnel, falling the buildup clearing zone along the end opening of buildup funnel again handles, need not establish the special messenger of cleaning buildup at transfer post, alleviate working strength of workers, saved human resources greatly, also guaranteed safety in production simultaneously; Buildup is the cavity by flase floor automatically, directly drops to clearing zone from the outlet of buildup funnel and does not consume energy; Buildup is focused on the work efficiency height, thereby saved the operation cost of enterprise greatly.
Description of drawings
Fig. 1 is mounting structure scheme drawing of the present utility model;
Fig. 2 is the attached enlarged drawing of looking of flase floor among Fig. 1.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Among Fig. 1, on the transfer post that band conveyor is transported continuously, main band conveyor 1 and downstream band conveyor 5 are installed, below described main band conveyor 1 and downstream band conveyor 5, level is covered with the flase floor 3(of big cavity 3.1 referring to Fig. 2), material falls from the roller 1.1 of main band conveyor 1, drain in the transhipment funnel 2 that is installed in flase floor 3 back sides by the cavity 3.1 on the flase floor 3, above the belt of outlet to band conveyor 5 downstream of transhipment funnel 2, material can be transported to the predetermined area by downstream band conveyor 5.
Flase floor 3 can be installed in whole main band conveyor 1 and downstream band conveyor 5 below, also can only be installed in below the web of the belt changed course roller of band conveyor and belt feeder, only use as the whereabouts of buildup, ordinary flat can be installed in other positions.
The buildup funnel of the installation at the described band conveyor back side, be at flase floor 3 back sides under the main band conveyor 1 of transfer post, be positioned at available funnel and guide position on downstream band conveyor 5 belts into, outlet is installed to the main buildup funnel 4 above band conveyor 5 belts downstream, the remote location in 4 bucket left sides is leaked near main buildup in the back side at flase floor 3, and the secondary buildup funnel 9 that outlet subtend buildup is concentrated clearing zone is installed.The buildup that drops from main band conveyor 1 is so most ofly leaked 4 by main buildup and is directly fallen on the downstream band conveyor 5 transhipment and walked, and does not need to do secondary and concentrates cleaning, thereby significantly reduced the concentrated cleaning amount of buildup;
Have the position of the buildup that drops below the flase floor 3 under downstream band conveyor 5, downstream buildup funnel 10 is installed, clearing zone is concentrated in the outlet of downstream buildup funnel 10 and the described secondary buildup funnel 9 all same buildup of subtend.
Described buildup concentrates clearing zone to be provided with buildup collecting box 6, the import of the equal subtend buildup of the outlet collecting box 6 of secondary buildup funnel 9 and downstream buildup funnel 10, the residue buildup of 1 time fraction of main band conveyor, and the buildup of downstream band conveyor 5, all collect in the buildup collecting box 6, then the buildup of collecting in the case is done unified regular processing, and needn't on each transfer post, be provided with the special messenger of cleaning buildup, nobody, machine mixture operation have also just solved the problem of production safety.
The concentrated cleaning transhipment of buildup for convenience, in buildup collecting box 6, be provided with material collecting tank 6.1, set up above the material collecting tank 6.1 spiral propeller 7 that buildup can be carried out is installed, motor 8 drives spiral propeller 7 rotations, will concentrate the buildup of cleaning to release also Transshipment Permitted to predetermined place storage by spiral propeller 7.Manpower cleaning is become mechanization concentrate cleaning and transport, greatly reduce labour intensity, improved work efficiency.
If use when the separate unit band conveyor is defeated expects, below band conveyor, spread flase floor 3, and 3 of flase floors are installed spiral propeller 7 in the buildup collecting box 6 to the case mouth of buildup collecting box 6, can do to collect automatically and handle by mechanical equipment to buildup equally.

Claims (4)

1. a band conveyor is reprinted the station buildup from the clear structure, it is characterized in that: below the main band conveyor of transfer post and downstream band conveyor, be equipped with flase floor, at the back side of main band conveyor and downstream band conveyor Under The Grille plate, be positioned at the position that the buildup of dropping is arranged below the belt, the buildup funnel is installed, the outlet subtend buildup cut-back region of buildup funnel.
2. band conveyor as claimed in claim 1 is reprinted the station buildup from the clear structure, it is characterized in that: the buildup funnel of the installation under the described band conveyor, be under described main band conveyor the flase floor back side, be positioned at available funnel and guide position above the band conveyor belt of downstream into, outlet is installed to the main buildup funnel above the band conveyor belt downstream, near the position of main buildup funnel far-end, the secondary buildup funnel that outlet subtend buildup is concentrated clearing zone is installed at the flase floor back side; The flase floor back side under the band conveyor of downstream is in the position that the buildup of dropping is arranged, and the downstream buildup funnel that outlet subtend buildup is concentrated clearing zone is installed.
3. band conveyor as claimed in claim 2 is reprinted the station buildup from the clear structure, it is characterized in that: described buildup concentrates clearing zone to be provided with the buildup collecting box, the import of the outlet subtend buildup collecting box of secondary buildup funnel and downstream buildup funnel.
4. band conveyor as claimed in claim 3 is reprinted the station buildup from the clear structure, it is characterized in that: be provided with material collecting tank in described buildup collecting box, the spiral propeller that buildup can be pushed out is installed in the material collecting tank.
CN 201320130019 2013-03-21 2013-03-21 Accumulated material self-cleaning mechanism of belt conveyor transfer station Expired - Fee Related CN203143620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320130019 CN203143620U (en) 2013-03-21 2013-03-21 Accumulated material self-cleaning mechanism of belt conveyor transfer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320130019 CN203143620U (en) 2013-03-21 2013-03-21 Accumulated material self-cleaning mechanism of belt conveyor transfer station

Publications (1)

Publication Number Publication Date
CN203143620U true CN203143620U (en) 2013-08-21

Family

ID=48971164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320130019 Expired - Fee Related CN203143620U (en) 2013-03-21 2013-03-21 Accumulated material self-cleaning mechanism of belt conveyor transfer station

Country Status (1)

Country Link
CN (1) CN203143620U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291091A (en) * 2014-09-23 2015-01-21 新汶矿业集团有限责任公司 Suction type conveyor belt surface cleaning device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291091A (en) * 2014-09-23 2015-01-21 新汶矿业集团有限责任公司 Suction type conveyor belt surface cleaning device and method

Similar Documents

Publication Publication Date Title
CN206569661U (en) The clearing apparatus of belt feeder continuous conveying system
CN205310457U (en) Rickers cutting device convenient to saw -dust is collected
CN104555346A (en) Belt conveyer sweeping device
CN203143620U (en) Accumulated material self-cleaning mechanism of belt conveyor transfer station
CN207001614U (en) A kind of bamboo processing waste material induction system
CN205092503U (en) Circuit ware of removing obstacles
CN101934926B (en) Automatic cleaning method of sprinkled coal in belt conveyance
CN106219191A (en) A kind of environmental protection conveyer
CN208217749U (en) A kind of waste material automatic collecting device
CN203975864U (en) Bucket chain conveyor
CN204057107U (en) Belt feeder blank recovering device
CN203711206U (en) Circulation oil spraying device for mining cutting picks
CN203917116U (en) A kind of screening broken set apparatus for converting of Coal Transportation System
CN103213805B (en) Feeding machine with negative pressure dust-extraction device
CN206298151U (en) A kind of cement is to dress dust-precipitator
CN210914249U (en) Connecting device for conveying bulk materials on different floors
CN212562606U (en) Wall paint cleaning mechanism
CN210709434U (en) Sludge transportation equipment
CN201777673U (en) Automatic cleaning device for scattered coal conveyed by belts
CN204660877U (en) A kind of petroleum coke is collected and conveying device
CN203624622U (en) Automatic material-mixing device used for conveyor
CN203221543U (en) Cutting equipment
CN208184156U (en) A kind of skyscraper garbage transporting device conducive to environmental protection
CN204058708U (en) The dedusting reclamation set of carding machine
CN208345086U (en) Bottom material collecting device of plate chain conveyor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20140321