CN203131973U - Abnormal user heating utilization state monitoring system of centralized heat-supply tube network - Google Patents

Abnormal user heating utilization state monitoring system of centralized heat-supply tube network Download PDF

Info

Publication number
CN203131973U
CN203131973U CN 201320055564 CN201320055564U CN203131973U CN 203131973 U CN203131973 U CN 203131973U CN 201320055564 CN201320055564 CN 201320055564 CN 201320055564 U CN201320055564 U CN 201320055564U CN 203131973 U CN203131973 U CN 203131973U
Authority
CN
China
Prior art keywords
heat
user
control valve
monitoring system
state monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320055564
Other languages
Chinese (zh)
Inventor
黄鸾
董现海
高少东
雷春鸣
张华奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN THERMAL POWER DESIGNING INSTITUTE CO., LTD.
Original Assignee
TIANJIN JIN-AN THERMAL POWER Co Ltd
TIANJIN THERMAL POWER DESIGNING INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIN-AN THERMAL POWER Co Ltd, TIANJIN THERMAL POWER DESIGNING INSTITUTE filed Critical TIANJIN JIN-AN THERMAL POWER Co Ltd
Priority to CN 201320055564 priority Critical patent/CN203131973U/en
Application granted granted Critical
Publication of CN203131973U publication Critical patent/CN203131973U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model relates to an abnormal user heating utilization state monitoring system of a centralized heat-supply network. The abnormal user heating utilization state monitoring system of the centralized heat-supply network is characterized by comprising a remote central computer control unit which is arranged in a heat-supply network management center and used for monitoring user heating utilization states, and general packet radio service (GPRS) communicators which are sequentially connected and are respectively arranged in correspondence with various buildings, centralizers, and user heating utilization state monitoring units arranged for users in various buildings. Each user heating utilization state monitoring unit comprises a local measuring and monitoring terminal connected with the centralizer corresponding to the building where the users are located, a switch control valve, a flow meter, and a self-reliance differential pressure control valve arranged at the house-entry end of a return water pipe of the heat-supply network, wherein the switch control valve and the flow meter are sequentially arranged at the house-entry end of the return water pipe of the heat-supply network in the water supply direction. Two pressure bringing tubes of the self-reliance differential pressure control valve are respectively connected with a return water pipe on the water outlet side of the control valve and a water supply pipe on the water inlet side of the switch control valve. The switch control valve and the flow meter are both connected with the measuring and monitoring terminal. The abnormal user heating utilization state monitoring system of the centralized heat-supply network has the advantages of being normal and stable in heat supply and improving safety.

Description

Central heating pipe network user's heat abnormality monitoring system
Technical field
The utility model relates to a kind of central heating pipe network monitoring system, relates in particular to a kind of central heating pipe network user's heat abnormality monitoring system.
Background technology
Along with social technology progress and expanding economy, China's central heating pipe network development rapidly, for vast heating user provides cosy living environment, but in heating system some problems that also exist in service, as: adorn pipeline run, drip, leak, system jams phenomenon and user that indoor heat-exchanger rig and equipment fault cause and use phenomenon such as heat supply water to happen occasionally privately because the user changes without authorization or increases, all cause the heavy losses of heating power resource, and bring insecurity for heating system, user.Yet also do not have the monitoring system at the user's heat abnormality at present in the central heating pipe network system of China, can not understand, judge the hot state of using of user in real time, lack unusual detection and control device with thermal phenomenon.How to realize the normal stable heating of heating system, improve the security of heating system, improve comfortableness and the security of user's heat, become the problem that the heat supply field is paid close attention to.
The utility model content
Main purpose of the present utility model is at the problems referred to above, a kind of central heating pipe network user's heat abnormality monitoring system is provided, by in time being got rid of, the monitoring of user's heat supply flow uses hot state unusually, guarantee the normal stable heating of heating system, improve the security of heating system, improve comfortableness and the security of user's heat.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of central heating pipe network user's heat abnormality monitoring system, it is characterized in that comprising that the monitor user ' of being located at heating network administrative center is with GPRS communicator and the concentrator of the remote central computer control unit of hot state and corresponding each building setting of difference that connects successively thereof, and at respectively hugging the user's heat condition monitoring unit that an interior user arranges respectively, described user's heat condition monitoring unit comprises the local detection and control terminal that connects with building, a user place corresponding concentrator, be successively set on switching control pilot and the flowmeter that described heating network feed pipe is registered one's residence and held along water supply direction, be arranged on the self-power differential pressure control valve that the heating network return pipe is registered one's residence and held, two pressure guiding pipes of described self-power differential pressure control valve are connected on the water outlet side return pipe and described switching control pilot influent side feed pipe of this control valve, and switching control pilot and flowmeter all are connected with described detection and control terminal.
Described switching control pilot is connected by the M-BUS bus with detection and control terminal.
The beneficial effects of the utility model are: measure the instantaneous heat supply flow of user at any time by adopting flowmeter, and the dual structure of having taked local closed-loop control and the real-time monitoring of central computer control module reaches reliable, the timely judgement of the hot state of unusual usefulness, the timely effect that solves, when instantaneous heat supply flow increases and surpasses that to set ceiling value then may be that leakage accident or the indoor water privately of user have taken place, but emergency cut-off this moment switching control pilot, and by uploading warning, send the related personnel to enter the scene and carry out actual checking, fix a breakdown, eliminate the heat anomaly state of using; When instantaneous heat supply flow reduces and surpasses the determinated low limit value, then may be that pipeline blockage has taken place the user, or draw privately in the outdoor side of gauge table and to connect water or user people is the valve of having closed on the indoor heating facility, this moment is by uploading warning, administrative center sends the related personnel to enter the scene to carry out actual checking, solves and eliminate the heat anomaly state of using.Simultaneously, the instantaneous heat supply data on flows of central computer control module by accepting also carried out monitoring, alarming and on site fault clearing.In a word, use hot state unusually by the monitoring of user's heat supply flow is in time got rid of, guarantee the normal stable heating of heating system, prevent the wasting of resources, improve the security of heating system, improve comfortableness and the security of user's heat.
Description of drawings
Fig. 1 is the structured flowchart of central heating pipe network user's heat abnormality monitoring system;
Fig. 2 is the user's heat abnormality monitoring programme flow chart of central heating pipe network user's heat abnormality monitoring system.
Among the figure: 1 central computer control module, 21-2n GPRS communicator, 31-3n concentrator, 4 detection and control terminals, 5M-bus bus, 6 dirt separators, 7 switching control pilots, 8 flowmeters, 80 feed pipes, 9 self-power differential pressure control valves, 91,92 pressure guiding pipes, 90 return pipes, 10 ball valves, A1-An building, B1-Bm user, C1-Cm user's heat condition monitoring unit.
Below in conjunction with drawings and Examples the utility model is described in detail.
The specific embodiment
Fig. 1 illustrates the central heating pipe network user's heat abnormality monitoring system of certain heat supply residential block, and in the present embodiment, the n among the figure is that 9, m is 15.Namely there are 9 building A1-A9 this heat supply residential block, in each building 15 user B1-B15 is arranged.
Based on above-mentioned heat supply zone, this central heating pipe network user's heat abnormality monitoring system is characterised in that and comprises that the monitor user ' of being located at heating network administrative center is with GPRS communicator 21-29 and the concentrator 31-39 of the remote central computer control unit 1 of hot state and corresponding each building setting of difference that connects successively thereof, and at respectively hugging the user's heat condition monitoring unit C1-C15 that an interior user arranges respectively, above-mentioned user's heat condition monitoring unit comprises the local detection and control terminal 4 that connects with building, a user place corresponding concentrator, be successively set on switching control pilot 7 and the flowmeter 8 that above-mentioned heating network feed pipe 80 is registered one's residence and held along water supply direction, be arranged on the self-power differential pressure control valve 9 that heating network return pipe 90 is registered one's residence and held, two pressure guiding pipes 91 of self-power differential pressure control valve 9,92 are connected on the water outlet side return pipe and above-mentioned switching control pilot influent side feed pipe of this control valve, and switching control pilot 7 and flowmeter 8 all are connected with detection and control terminal 4.
As shown in Figure 1, be respectively equipped with the ball valve 10 of control piper open and close at feed pipe 80 and return pipe 90, also be provided with on feed pipe 80 impurity in the pipeline is carried out the dirt separator 6 that scrubbing purifies, these facilities are the standard configuration equipment in the heating power cell of registering one's residence.
It is the high precision flow of ldg-25s-t2f100 that above-mentioned flowmeter 8 adopts the model of Tianjin your instrument company of news, and its function is that the user's heat flow is measured, gathered, and reaches detection and control terminal 4 by wired form.
The function of switching control pilot 7 is to finish closing when hot to user's unusual usefulness under the control of detection and control terminal, and opens switching control pilot after the user removes the hot state of unusual usefulness.Above-mentioned switching control pilot 7 has adopted the MTV-25Y control valve of Jiangsu Meter Intelligent Instrument Co., Ltd., is connected by the M-BUS bus with detection and control terminal 4, because power supply and signal provide simultaneously, can guarantee to test accurately and reliably, and the M-BUS bus is the commercially available prod.
It is the self-power differential pressure control valve of Kombi-3-plus that above-mentioned self-power differential pressure control valve 9 has adopted the model of Honeywell company, and its function is ⑴. eliminate the vertical hydraulic misadjustment of secondary net.⑵. the differential pressure value in limit switch control valve loop, the operate as normal of assurance switching control pilot 7.The operation principle of self-power differential pressure control valve 9 is after the hot aqueous medium is dammed by spool, valve seat, enter the switching control pilot loop, and the pressure reduction of switching control pilot 7 is introduced the chamber of film up and down of self-power differential pressure control valve respectively by pressure guiding pipe, in the indoor generation motive force of film up and down, balance each other with the reaction force of its spring, thereby determined the relative position of spool and valve seat, and the relative position of spool and valve seat has been determined the size of pressure difference; When controlled pressure reduction changes, equilibrium of forces is destroyed, thereby driven valve core movement, changed the resistance coefficient of valve, reach and guarantee that control pressure reduction is the effect of setting value, thereby the differential pressure value in limit switch control valve loop really makes operting differential pressure be no more than the maximum pressure reduction that allows, and guarantees the operate as normal of switching control pilot 7.
The central computer control module 1 that is arranged on heating network administrative center is the active computer hardware system, the various data of parameter such as the scaled value of the high limit of the corresponding heat supply flow of host memory storage user's heat condition monitoring program and respective settings and lower bound and computational process, its function is the hot state of monitor user ', comprise: by GPRS communicator 21-29, concentrator 31-39 receives from each building instantaneous heat supply data on flows of uploading user's feed pipe of 135 users' detection and control terminal 4 totally, change calculate and with set ceiling value and low limit value relatively, the data that transfinite are sent long-range sound and light alarm, and notify the related personnel to carry out site inspection by heating network administrative center, get rid of use unusually pyrogen because of; Central computer control module 1 also receives the local overload alarm signal of uploading from detection and control terminal 4, and sends this locality sound and light alarm that transfinites, and notifies the related personnel the on-the-spot fault that solves by heating network administrative center simultaneously.
Detection and control terminal 4 has adopted the GT50 detection and control terminal of Tianjin Development Co., Ltd of blue Shenzhen Science and Technology, this detection and control terminal is the industrial computer that directly applies to industry spot, it is the integration apparatus that comprises multiple template, the storage user's heat condition monitoring program same with the central computer control module in the machine, the various data of parameter such as the scaled value of the high limit of the corresponding heat supply flow of respective settings and lower bound and computational process, its function is directly to handle the flow signal of flowmeter 8, gather the instantaneous heat supply flow of user's feed pipe by flowmeter, when uploading, data on flows carries out this locality conversion and calculating, and by comparing with setting ceiling value and low limit value, the opening and closing of gauge tap control valve, realize local closed-loop control, while can be with instantaneous heat supply flow signal under the telecommunication normal condition, local overload alarm signal passes through concentrator, the GPRS communicator is uploaded to the central computer control module 1 of heating network administrative center.
The function of GPRS communicator is to realize the communication system of the data communication of detection and control terminal and central computer control module, adopt the communication modes of the conventional APN VPN that uses at present, selected the GPRS communicator of Tianjin Development Co., Ltd of blue Shenzhen Science and Technology in this example for use.
The function of concentrator is all users in the building to be concentrated with the signal of the detection and control terminal of thermal control units unusually upload.In this example, concentrator has adopted the concentrator of Qinhuangdao flourish wound development in science and technology Co., Ltd.
Below for adopting above-mentioned central heating pipe network user's heat abnormality monitoring system to carry out the method for user's heat abnormality monitoring, referring to Fig. 2.
The step of this method is as follows:
⑴ system brings into operation, and detection and control terminal 4 is gathered data and the execution in step ⑵ of instantaneous heat supply flow F; Inquire simultaneously whether telecommunication normal, when telecommunication just often, give central computer control module 1 with above-mentioned data upload, and execution in step ⑶, when telecommunication was interrupted, these data were overflowed, and continued maintenance inquiry state;
⑵ detection and control terminal 4 is converted into instantaneous velocity V with instantaneous heat supply flow F, and compares with the instantaneous velocity ceiling value V1 that sets and the low limit value V2 of instantaneous velocity, judges the user's heat state:
(2.1) as instantaneous velocity value V during greater than instantaneous velocity ceiling value V1, this moment, explanation may be that pipeline leakage accident or the indoor water privately of user have taken place, and must close switching control pilot 7, EP (end of program); Produce local superelevation limit alarm signal simultaneously and inquire whether telecommunication normal, when telecommunication just often, upload local superelevation limit alarm signal to the central computer control module, this moment execution in step ⑷; When telecommunication was interrupted, described local superelevation limit alarm signal data were overflowed, and continue to keep the inquiry state;
(2.2) as instantaneous velocity value V during smaller or equal to instantaneous velocity ceiling value V1, judge that further instantaneous velocity value V is whether less than the low limit value V2 of instantaneous velocity:
(2.2.1) when instantaneous velocity value V hangs down limit value V2 less than instantaneous velocity, this moment explanation may be that the heating user pipeline blockage or user have been taken place is drawn privately in the outdoor side of gauge table and connects water or the people is the valve of having closed on the indoor heating facility, produce local ultralow limit alarm signal and inquire whether telecommunication is normal this moment, when telecommunication just often, upload local ultralow limit alarm signal to the central computer control module, at this moment execution in step ⑸; When telecommunication was interrupted, above-mentioned this locality ultralow limit alarm signal data were overflowed, and continued to keep the inquiry state;
(2.2.2) when instantaneous velocity value V hangs down limit value V2 more than or equal to instantaneous velocity, illustrate that user's heat is normal, continue circulation;
⑶. the central computer control module receives the instantaneous heat supply flow F that detection and control terminal uploads and calculates and judge the hot state of using:
(3.1) instantaneous heat supply flow F is converted into instantaneous velocity V, and compares with the instantaneous velocity ceiling value V1 that sets and the low limit value V2 of instantaneous velocity, judge the user's heat state:
(3.1.1) whether judge instantaneous velocity value V greater than instantaneous velocity ceiling value V1, if instantaneous velocity value V, then sends long-range superelevation limit sound and light alarm signal greater than instantaneous velocity ceiling value V1, this moment, administrative center notified personnel on site fault clearing; Equal instantaneous velocity ceiling value V1 and then carry out following steps:
(3.1.2) whether judge instantaneous velocity value V less than the low limit value V2 of instantaneous velocity, if instantaneous velocity value V then sends long-range ultralow limit sound and light alarm signal less than the low limit value V2 of instantaneous velocity, this moment, administrative center notified personnel on site fault clearing; If instantaneous velocity value V illustrates that more than or equal to the low limit value V2 of instantaneous velocity user's heat is normal;
⑷ send local superelevation limit sound and light alarm signal when local superelevation limit alarm signal that central computer control unit 1 receives that detection and control terminal 4 uploads, at this moment, administrative center notifies personnel on site fault clearing;
⑸ send local ultralow limit sound and light alarm signal when local ultralow limit alarm signal that central computer control unit receives that detection and control terminal 4 uploads, at this moment, administrative center notifies personnel on site fault clearing.
Above-mentioned instantaneous velocity ceiling value V1=1.5-2m/s, instantaneous velocity hangs down limit value V2=0.1-0.3m/s.
In sum, the central heating pipe network user's heat abnormality monitoring system and the above-mentioned method for supervising that have adopted the utility model to provide, realized the user's heat abnormality reliable, judge also timely and can in time solve, when instantaneous heat supply flow increases and surpasses that to set ceiling value then may be that leakage accident or the indoor water privately of user have taken place, this moment can be by this locality control emergency cut-off switching control pilot 7 of detection and control terminal 4, and by uploading local alarm signal, send the related personnel to enter the scene by administrative center and carry out actual checking, fix a breakdown, eliminate the heat anomaly state of using.When instantaneous heat supply flow reduces and surpasses the determinated low limit value, then may be that pipeline blockage has taken place the user, or the user draws privately in the outdoor side of gauge table and connects water or the people is the valve of having closed on the indoor heating facility, this moment is by uploading local alarm signal, send the related personnel to enter the scene by administrative center and carry out actual checking, solve and eliminate and use hot state unusually.Simultaneously, the instantaneous heat supply data on flows of central computer control module by accepting calculated simultaneously, judged and the hot state of unusual usefulness is sent remote alarms, and gets rid of field failure.Guarantee the normal stable heating of heating system thus, prevent the wasting of resources, improve the security of heating system, improve comfortableness and the security of user's heat.

Claims (2)

1. central heating pipe network user's heat abnormality monitoring system, it is characterized in that comprising that the monitor user ' of being located at heating network administrative center is with GPRS communicator and the concentrator of the remote central computer control unit of hot state and corresponding each building setting of difference that connects successively thereof, and at respectively hugging the user's heat condition monitoring unit that an interior user arranges respectively, described user's heat condition monitoring unit comprises the local detection and control terminal that connects with building, a user place corresponding concentrator, be successively set on switching control pilot and the flowmeter that described heating network feed pipe is registered one's residence and held along water supply direction, be arranged on the self-power differential pressure control valve that the heating network return pipe is registered one's residence and held, two pressure guiding pipes of described self-power differential pressure control valve are connected on the water outlet side return pipe and described switching control pilot influent side feed pipe of this control valve, and switching control pilot and flowmeter all are connected with described detection and control terminal.
2. central heating pipe network user's heat abnormality monitoring system according to claim 1 is characterized in that described switching control pilot is connected by the M-BUS bus with detection and control terminal.
CN 201320055564 2013-01-31 2013-01-31 Abnormal user heating utilization state monitoring system of centralized heat-supply tube network Expired - Fee Related CN203131973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320055564 CN203131973U (en) 2013-01-31 2013-01-31 Abnormal user heating utilization state monitoring system of centralized heat-supply tube network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320055564 CN203131973U (en) 2013-01-31 2013-01-31 Abnormal user heating utilization state monitoring system of centralized heat-supply tube network

Publications (1)

Publication Number Publication Date
CN203131973U true CN203131973U (en) 2013-08-14

Family

ID=48939947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320055564 Expired - Fee Related CN203131973U (en) 2013-01-31 2013-01-31 Abnormal user heating utilization state monitoring system of centralized heat-supply tube network

Country Status (1)

Country Link
CN (1) CN203131973U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103062835A (en) * 2013-01-31 2013-04-24 天津市热电设计院 Heat anomaly state monitoring system and heat anomaly state monitoring method for centralized heating pipe network
CN108592170A (en) * 2018-04-23 2018-09-28 瑞纳智能设备股份有限公司 A kind of town dweller's heating network dehydration leak from judging system and method
CN112286126A (en) * 2020-11-10 2021-01-29 广州发展新塘热力有限公司 Multifunctional heat supply network remote monitoring system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103062835A (en) * 2013-01-31 2013-04-24 天津市热电设计院 Heat anomaly state monitoring system and heat anomaly state monitoring method for centralized heating pipe network
CN103062835B (en) * 2013-01-31 2015-02-25 天津市热电设计院 Heat anomaly state monitoring system and heat anomaly state monitoring method for centralized heating pipe network
CN108592170A (en) * 2018-04-23 2018-09-28 瑞纳智能设备股份有限公司 A kind of town dweller's heating network dehydration leak from judging system and method
CN112286126A (en) * 2020-11-10 2021-01-29 广州发展新塘热力有限公司 Multifunctional heat supply network remote monitoring system

Similar Documents

Publication Publication Date Title
CN106838627B (en) A kind of multisensor heat supply network leakage warning monitoring system
WO2018040730A1 (en) Pipe network monitoring control system and monitoring control method achieved by using this system
CN204007304U (en) Plate type heat exchanger monitoring early-warning system
CN203797782U (en) District heating distribution type monitoring management system
CN203131973U (en) Abnormal user heating utilization state monitoring system of centralized heat-supply tube network
CN105783113A (en) Intelligent heat supply monitoring system
CN102288638A (en) Ground source heat pump thermal response testing system based on PLC (Programmable Logic Controller)
CN206459255U (en) One kind automation moving heat source control system
CN105953304A (en) Public building heat supply energy-saving control device
CN103062835B (en) Heat anomaly state monitoring system and heat anomaly state monitoring method for centralized heating pipe network
CN105864881A (en) Novel intelligent home heating system and demand control method thereof
CN219828579U (en) Urban water supply network flow monitoring and early warning system
CN202188926U (en) Thermal equilibrium rate tester for ground source heat pump system
CN207780633U (en) For the temperature and cooling water flow number measure and control device inside mass concrete
CN203732965U (en) Remote intelligent control management system for pipe network
CN109357310A (en) Heat distribution pipe network safe and economical operation emergent treatment system
CN204757231U (en) Intelligent water collecting and dividing device of ground lotus root well heat transfer system
CN203550027U (en) Heat metering payment control system
CN104791873A (en) Energy-saving building heating system
CN101832661A (en) Fixed terminal-free solar collector remote monitoring system
CN103925642A (en) Pipe network heat balance adjustment control device and method thereof
CN204611944U (en) A kind of central heating Indoor Temperature Ore-controlling Role
CN203732964U (en) Integrated monitoring device for park enterprise drainage pipe network
CN210485884U (en) Integral heat exchange module unit
CN206541200U (en) A kind of flow measuring and controlling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300204 Shantou Road, Tianjin, No. 62, No.

Patentee after: TIANJIN THERMAL POWER DESIGNING INSTITUTE CO., LTD.

Patentee after: Tianjin Jin-an Thermal Power Co., Ltd.

Address before: 300204 Shantou Road, Tianjin, No. 62, No.

Patentee before: Tianjin Thermal Power Designing Institute

Patentee before: Tianjin Jin-an Thermal Power Co., Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20210131

CF01 Termination of patent right due to non-payment of annual fee