CN203129125U - Pile and beam combined retaining structure - Google Patents

Pile and beam combined retaining structure Download PDF

Info

Publication number
CN203129125U
CN203129125U CN 201320183434 CN201320183434U CN203129125U CN 203129125 U CN203129125 U CN 203129125U CN 201320183434 CN201320183434 CN 201320183434 CN 201320183434 U CN201320183434 U CN 201320183434U CN 203129125 U CN203129125 U CN 203129125U
Authority
CN
China
Prior art keywords
pile
pile body
bodies
back timber
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320183434
Other languages
Chinese (zh)
Inventor
罗敖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320183434 priority Critical patent/CN203129125U/en
Application granted granted Critical
Publication of CN203129125U publication Critical patent/CN203129125U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a pile and beam combined retaining structure which comprises a pile board retaining wall, wherein the pile board retaining wall comprises first pile bodies and a baffle arranged between two adjacent pile bodies. The pile and beam combined retaining structure also comprises a pile top beam and second pile bodies, wherein the pile top beam and the second pile bodies are respectively positioned at the two sides of the baffle, and the second pile bodies are positioned between the two adjacent pile bodies; and the upper ends of the second pile bodies bend towards the pile top beam, and penetrate through the baffle so as to be connected with the pile top beam, and the lower ends of the second pile bodies extend downwards to places below the lower ends of the first pile bodies. The pile and beam combined retaining structure provided by the utility model has the advantages that the structure is simple, the built pile board retaining wall can be fully utilized, the retaining height of the retaining wall is increased, and the project cost is saved.

Description

Stake beam associating retaining structure
Technical field
The utility model relates to a kind of barricade, relates in particular to a kind of beam associating retaining structure.
Background technology
In construction work, often run into such a case: new building is positioned near the former stake plate barricade, building excavation absolute altitude is far below building a plate barricade build-in absolute altitude, but an absolute altitude at the bottom of being higher than, and the space is too narrow between the barricade can't build barricade again with building owing to new building.In this case, generally be to build one plate barricade in original barricade position again according to building excavation absolute altitude, original plate barricade cancelled, cause sizable waste.
The utility model content
At the prior art above shortcomings, the purpose of this utility model just is to provide a kind of beam associating retaining structure, can take full advantage of and build a plate barricade, strengthens barricade and props up the retaining height, saves construction costs.
To achieve these goals, the technical solution adopted in the utility model is such: a kind of beam associating retaining structure, comprise a plate barricade, described stake plate barricade comprises first pile body and is located at baffle plate between adjacent two first pile bodies, it is characterized in that: also comprise a back timber and second pile body; Described stake back timber and second pile body lay respectively at the both sides of baffle plate, and second pile body is between adjacent two first pile bodies; The upper end of second pile body bends to stake back timber direction, and links to each other with the stake back timber after passing baffle plate; The lower ends downward of second pile body extends to the below of the first pile body lower end.
The stake back timber will be built a plate barricade (baffle plate and first pile body) Load Transfer to second pile body, and concerning building a plate barricade, the stake back timber is equivalent to the fixed section soil body (rock mass); Second pile body is then born and has been built load and the following soil pressure of the first pile body build-in absolute altitude that a plate barricade transmits.
Further, described stake back timber and second pile body are one-body molded by building.
Compared with prior art, advantage of the present utility model is: simple in structure, and can take full advantage of and build a plate barricade, strengthen barricade and prop up the retaining height, save construction costs.
Description of drawings
Fig. 1 is lateral view of the present utility model;
Fig. 2 is vertical view of the present utility model.
Among the figure: 1-the first pile body, 2-baffle plate, 3-stake back timber, 4-the second pile body.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Embodiment: referring to Fig. 1 and Fig. 2, a kind of beam associating retaining structure comprises a plate barricade, and described stake plate barricade comprises first pile body 1 and is located at baffle plate 2 between adjacent two first pile bodies 1.Also comprise a back timber 3 and second pile body 4; Described stake back timber 3 and second pile body 4 lay respectively at the both sides of baffle plate 2, and second pile body 4 is between adjacent two first pile bodies 1; The upper end of second pile body 4 bends to stake back timber 3 directions, and links to each other with stake back timber 3 after passing baffle plate 2; The lower ends downward of second pile body 4 extends to the below of first pile body, 1 lower end.
Stake plate barricade wherein is builds a plate barricade, and the stake back timber will be built a Load Transfer of plate barricade (baffle plate) to second pile body, and concerning building a plate barricade, the stake back timber is equivalent to the fixed section soil body (rock mass); Second pile body is then born and has been built load and the following soil pressure of the first pile body build-in absolute altitude that a plate barricade transmits.
During concrete enforcement, described stake back timber 3 and second pile body 4 are one-body molded by building.Construction is convenient like this, and the combination stability of stake back timber 3 and second pile body 4 is better, and intensity is higher.
Need to prove at last, above embodiment is only in order to the technical solution of the utility model to be described but not the restriction technologies scheme, those of ordinary skill in the art is to be understood that, those are made amendment to the technical solution of the utility model or are equal to replacement, and do not break away from aim and the scope of the technical program, all should be encompassed in the middle of the claim scope of the present utility model.

Claims (2)

1. stake beam associating retaining structure comprises a plate barricade, and described stake plate barricade comprises first pile body and is located at baffle plate between adjacent two first pile bodies, it is characterized in that: also comprise a back timber and second pile body; Described stake back timber and second pile body lay respectively at the both sides of baffle plate, and second pile body is between adjacent two first pile bodies; The upper end of second pile body bends to stake back timber direction, and links to each other with the stake back timber after passing baffle plate; The lower ends downward of second pile body extends to the below of the first pile body lower end.
2. stake beam according to claim 1 is united retaining structure, it is characterized in that: described stake back timber and second pile body are one-body molded by building.
CN 201320183434 2013-04-12 2013-04-12 Pile and beam combined retaining structure Expired - Fee Related CN203129125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320183434 CN203129125U (en) 2013-04-12 2013-04-12 Pile and beam combined retaining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320183434 CN203129125U (en) 2013-04-12 2013-04-12 Pile and beam combined retaining structure

Publications (1)

Publication Number Publication Date
CN203129125U true CN203129125U (en) 2013-08-14

Family

ID=48937120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320183434 Expired - Fee Related CN203129125U (en) 2013-04-12 2013-04-12 Pile and beam combined retaining structure

Country Status (1)

Country Link
CN (1) CN203129125U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476292A (en) * 2017-06-16 2017-12-15 哈尔滨工业大学建筑设计研究院 Without the double pile element stake top shutters of Guan Liang

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476292A (en) * 2017-06-16 2017-12-15 哈尔滨工业大学建筑设计研究院 Without the double pile element stake top shutters of Guan Liang
CN107476292B (en) * 2017-06-16 2019-04-09 哈尔滨工业大学建筑设计研究院 Without the double pile element stake top shutters of crown beam

Similar Documents

Publication Publication Date Title
CN204662499U (en) Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN203947616U (en) A kind of coupling beam formula anti-seismic damper
CN204139459U (en) Regeneration concrete hetermorphiscal column
CN202851078U (en) High water material filling column bag body
CN203361759U (en) Assembly type prefabricated environment-friendly enclosure wall
CN202866343U (en) Beam-free system underground garage
CN203129125U (en) Pile and beam combined retaining structure
CN204940966U (en) A kind of economical Underground Garage Pillar web frame
CN204186086U (en) Movable plank house bracing means
CN202745036U (en) Split mounting type guide wall of underground continuous wall
CN205116222U (en) Basement outer wall structure of hole department is opened to roof
CN207582476U (en) A kind of civil engineering slopes ruggedized construction
CN209260757U (en) Outer wall of basement groove type temperature guide slit
CN206681030U (en) A kind of earthen foundation pile foundation joist foundation structure
CN206887975U (en) A kind of caisset for being applied to have backfill situation behind
CN204982910U (en) Foundation ditch arch supporting construction
CN206570712U (en) The anti-collapse rock-fall assembled rubber energy dissipating plate safeguard structure in canopy cave cave top
CN203514338U (en) Tower crane foundation
CN204983140U (en) Removal glass steel base reinforced structure for house
CN203716300U (en) Connection structure of light external wall and side column
CN203429663U (en) Basement side wall earth-retaining structure
CN204370483U (en) A kind of for the building iron component in ground
CN202440829U (en) Concrete-filled basic lattice column of tower crane
CN204491994U (en) A kind of precast reinforced concrete beam
CN204357120U (en) A kind of concrete column template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20140412