CN203127587U - Carrying fixture for high-mass blocks - Google Patents

Carrying fixture for high-mass blocks Download PDF

Info

Publication number
CN203127587U
CN203127587U CN201320107983XU CN201320107983U CN203127587U CN 203127587 U CN203127587 U CN 203127587U CN 201320107983X U CN201320107983X U CN 201320107983XU CN 201320107983 U CN201320107983 U CN 201320107983U CN 203127587 U CN203127587 U CN 203127587U
Authority
CN
China
Prior art keywords
long
armed
handle
big quality
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320107983XU
Other languages
Chinese (zh)
Inventor
苏林王
张志显
王志岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Original Assignee
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd, GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd, CCCC Fourth Harbor Engineering Institute Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd, Guangzhou Harbor Engineering Quality Inspection Co Ltd filed Critical CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201320107983XU priority Critical patent/CN203127587U/en
Application granted granted Critical
Publication of CN203127587U publication Critical patent/CN203127587U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a carrying fixture for high-mass blocks. The carrying fixture for high-mass blocks comprises a pair of long arms mutually hinged through a hinge part. A first end of each long arm is provided with a right-angled clamping part suitable for clamping a block to be carried. A second end of each long arm is provided with a handle suitable for holding. The hinge part is located between the first and second ends of the corresponding long arm, and the distance between the clamping part and the hinge part is shorter than that between the handle and the hinge part. The carrying fixture for high-mass blocks is suitable for clamping to carry blocks or concrete blocks which are round, rectangular, polygonal (with even sides) or irregularly shaped and which are in 20-150kg in mass, the blocks can be carried by two to four persons working together and using the fixture, and the carrying fixture for high-mass blocks is also capable of serving as a crane for hoisting high-mass blocks. The carrying fixture for high-mass blocks is simple in structure, easy to process and simple to operate, and enables efficiency and safety in carrying and laying high-mass blocks to be increased evidently.

Description

Big quality block handling gripper
Technical field
The utility model relates to a kind of anchor clamps, relates in particular to the anchor clamps that are applied to big quality block carrying, lay.
Background technology
At present, in engineerings such as road, stockyard and harbour are used, a large amount of big mass stone, concrete brick laying work are arranged, the block quality is between 20~150kg, shape has rectangle, circle, polygon, irregular shape etc., if adopt free-hand carrying, lay exist that operability is poor, inefficiency, the low shortcoming of safety.And common block anchor clamps only are applicable to single one-handed performance, the following light-duty block of clamping carrying 10kg, and be not suitable for the big quality block that cooperates and carry above 20kg, needs 2~4 people.
The utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of anchor clamps that are applicable to big quality block are provided.
In order to achieve the above object, the utility model has adopted following technical scheme: a kind of big quality block handling gripper, it comprise a pair of by articulation piece be hinged long-armed, the described first long-armed end is provided with and is suitable for the square holding part that clamping waits to carry block, the described second long-armed end is provided with the handle that is suitable for gripping, described articulation piece is between long-armed first end and second end, and the distance of described holding part and articulation piece is shorter than the distance of handle and articulation piece.
Described handle makes the first long-armed end more clamp block to be carried from the outside horizontal-extending of long-armed second end.
The distance of described handle and articulation piece is 2~4 times of distance of holding part and articulation piece, thereby increases the arm of force of anchor clamps hoisting force.
As a kind of embodiment, described holding part is made of the angle steel that is welded in long-armed first end, and the described long-armed outside horizontal-extending of first end is formed for connecting first plane of holding part.
The described long-armed outside horizontal-extending of second end is formed for connecting second plane of handle.
More preferably, described big quality block handling gripper also comprises a pair of steel pipe that is arranged at long-armed second end, and described steel pipe middle part is provided with mounting hole, and the outer end mount of described handle is in described mounting hole.
Described holding part is towards waiting that the face of carrying block is set to rough surface, thereby increases friction force.
The utility model is suitable for clamping carrying circle, rectangle, polygon (even number of sides), block or the concrete block of difform quality between 20~150kg, can be by 2~4 people carrying that cooperates, these anchor clamps also can be used as the suspender that loop wheel machine lifts by crane above-mentioned big quality block.This clamp structure is simple, is easy to processing, operate easyly, can significantly improve efficient and the safety of the carrying of big quality block, laying.
Description of drawings
Fig. 1 is the planar structure scheme drawing of big quality block handling gripper.
Fig. 2 is the Facad structure scheme drawing of big quality block handling gripper.
Fig. 3 is the construction profile scheme drawing of big quality block handling gripper.
Each figure among Fig. 4 is that long angle steel is outwards pulled bending and become the long-armed scheme drawing of anchor clamps, and Fig. 4 a shows the angle steel original state; Fig. 4 b shows and will wherein cut off on one side; Fig. 4 c demonstration is outwards pulled curved; Fig. 4 d demonstration is carried out soldering with the rectangle steel disc to the place of cutting off.
Each figure among Fig. 5 is that long angle steel is inwardly pulled bending and become the long-armed scheme drawing of anchor clamps, and Fig. 5 a shows the angle steel original state; Fig. 5 b shows will wherein cut out a vee on one side; Fig. 5 c demonstration is inwardly pulled curved; Fig. 5 d demonstration is carried out soldering with the rectangle steel disc to the place of cutting off.
The specific embodiment
Big quality block handling gripper of the present utility model comprises: a pair of by connect that pin 1 is hinged in the middle and lower part long-armed 2, the first long-armed end (being the lower end among Fig. 2) is provided with the square holding part of waiting to carry block for clamping, and the second long-armed end (being the upper end among Fig. 2) is provided with the handle 3 that is suitable for gripping.
In this example, long-armedly formed by long angle steel manufacturing, the long-armed outside horizontal-extending of second end is formed for connecting second plane of handle, and the long-armed outside horizontal-extending of first end is formed for connecting first plane of holding part.Second plane pull bending method shown in each figure of Fig. 4, Yi Bian at first with wherein the cutting off of angle steel, outwards pull curvedly then, with the rectangle steel disc place of cutting off is carried out soldering again.First plane pull bending method shown in each figure of Fig. 5, Yi Bian at first with angle steel wherein cut out a leg-of-mutton breach, inwardly pull curvedly then, with the rectangle steel disc place of cutting off is carried out soldering again.
In this example, this square holding part is made of angle clip, is set to rough surface towards the face that is held block 8, makes that the dynamic friction coefficient between intermediate plate and block is not less than 0.5.
Handle 3 in this example is made by short steel pipes, is fixed in the second long-armed plane.
Two long-armed hinge positions are in certain position near first end between second end and first end, in this example, holding part and articulation piece apart from 2L, the distance of handle and articulation piece is 6L, the length of handle is 2L, and wherein L is defined as and is held 1/3 of block 8 width.
When the bigger block of carrying volume and quality, can increase by two long steel pipes 5 as accessory.Long steel pipe selects for use diameter to make greater than the steel pipe of handle 3 diameters, offers through hole 6 at the middle part of long steel pipe 5, and through hole 6 diameters are a bit larger tham handle 3 external diameters.Simultaneously, at the middle part of handle 3 and terminal part offer through hole 4 respectively as bolt hole or rope perforation, the distance between two through holes 4 is a bit larger tham the diameter of long steel pipe 5.Handle 3 is passed the through hole 6 of long steel pipe 5, can be fixed in handle 3 ends to long steel pipe with bolt-through through hole 4 again.If rope is run through 4 of through holes anchor clamps are used as suspender.
Processing, the anchor clamps that assemble become " scissors " shape, these anchor clamps utilize lever principle, make the arm of force of anchor clamps hoisting force be anchor clamps to more than 4 times of the arm of force of block pressure, thereby greatly increased the pressure of anchor clamps clamping block, anchor clamps have enough friction force to offset the gravity of block to block.These anchor clamps are applicable to clamping carrying quality at circle, rectangle, polygon (even number of sides) block and the concrete block of 20~150kg, can also can be used as the suspender use by 2~4 people carrying that cooperates.

Claims (7)

1. one kind big quality block handling gripper, it is characterized in that: comprise a pair of by articulation piece be hinged long-armed, the described first long-armed end is provided with and is suitable for the square holding part that clamping waits to carry block, the described second long-armed end is provided with the handle that is suitable for gripping, described articulation piece is between long-armed first end and second end, and the distance of described holding part and articulation piece is shorter than the distance of handle and articulation piece.
2. big quality block handling gripper according to claim 1, it is characterized in that: described handle is from the outside horizontal-extending of long-armed second end.
3. big quality block handling gripper according to claim 1 is characterized in that: the distance of described handle and articulation piece is 2~4 times of distance of holding part and articulation piece.
4. big quality block handling gripper according to claim 1, it is characterized in that: described holding part is made of the angle steel that is welded in long-armed first end, and the described long-armed outside horizontal-extending of first end is formed for connecting first plane of holding part.
5. big quality block handling gripper according to claim 2, it is characterized in that: the described long-armed outside horizontal-extending of second end is formed for connecting second plane of handle.
6. big quality block handling gripper according to claim 1, it is characterized in that: described big quality block handling gripper also comprises a pair of steel pipe that is arranged at long-armed second end, described steel pipe middle part is provided with mounting hole, and the outer end mount of described handle is in described mounting hole.
7. big quality block handling gripper according to claim 1, it is characterized in that: described holding part is towards waiting that the face of carrying block is set to rough surface.
CN201320107983XU 2013-03-08 2013-03-08 Carrying fixture for high-mass blocks Expired - Fee Related CN203127587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320107983XU CN203127587U (en) 2013-03-08 2013-03-08 Carrying fixture for high-mass blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320107983XU CN203127587U (en) 2013-03-08 2013-03-08 Carrying fixture for high-mass blocks

Publications (1)

Publication Number Publication Date
CN203127587U true CN203127587U (en) 2013-08-14

Family

ID=48935587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320107983XU Expired - Fee Related CN203127587U (en) 2013-03-08 2013-03-08 Carrying fixture for high-mass blocks

Country Status (1)

Country Link
CN (1) CN203127587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109625759A (en) * 2019-02-03 2019-04-16 上海建工五建集团有限公司 A kind of clipper tool and application method of carrying small-sized concrete prefabricated element

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109625759A (en) * 2019-02-03 2019-04-16 上海建工五建集团有限公司 A kind of clipper tool and application method of carrying small-sized concrete prefabricated element

Similar Documents

Publication Publication Date Title
CN203127587U (en) Carrying fixture for high-mass blocks
CN201670644U (en) Roof truss hoisting device
CN202967888U (en) Electric smelting brick hoisting clamp
CN202265308U (en) Combined hoisting device for pipeline steel plate hoisting
CN105668409A (en) Clamp applicable to steel pipe hoisting
CN201400523Y (en) Clamp for hoisting
CN210756168U (en) Pipe welding is with device of checking diameter
CN205603062U (en) Anchor clamps suitable for steel pipe handling
CN205166812U (en) Portable piping installation connecting device
CN203319522U (en) Telescopic clamp of engine crane
CN202245716U (en) Cylindrical blank clamping and hoisting device
CN205200171U (en) Clamping device is drawn to aluminum pipe
CN205184590U (en) Curb ann step anchor clamps
CN201193182Y (en) I-steel sling
CN2279719Y (en) Eccentric multiwheel draw line pliers
CN205151557U (en) Magnetic force hangs electro -magnet cable and prevents pressure loss device
CN204657611U (en) A kind of pipe cutter
CN204999498U (en) Large tracts of land sheet metal presss from both sides tight hoist cable device
CN215401001U (en) Single-hand brick moving device
CN204893551U (en) Heavy gauge panel turn -over device
CN201907915U (en) Hoisting clamp for formed steel plates
CN207932911U (en) A kind of anti-dropout hoisting clamp device
CN201932808U (en) Lifting appliance
CN204434074U (en) Ingot blank fixture
CN210339194U (en) Aluminum round bar carrying device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20170308

CF01 Termination of patent right due to non-payment of annual fee